Proposal:H.015348.6
Parish:Tensas
Routes:LA 568
Description:LA 568: LA 3209 - US 65
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,075,702.65
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | Gilchrist Construction Company, LLC | $1,197,725.10 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $1,351,906.37 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $1,452,193.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gilchrist Construction Company, LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 19.2 | CUYD | 100.00 | 1,920.00 | 70.00 | 1,344.00 | 60.00 | 1,152.00 | | 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 376 | CUYD | 150.00 | 56,400.00 | 264.00 | 99,264.00 | 150.00 | 56,400.00 | | 0005 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 13.2 | CUYD | 100.00 | 1,320.00 | 125.00 | 1,650.00 | 305.00 | 4,026.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 2,473.2 | TON | 175.00 | 432,810.00 | 195.00 | 482,274.00 | 195.00 | 482,274.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 61.3 | TON | 400.00 | 24,520.00 | 500.00 | 30,650.00 | 495.00 | 30,343.50 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 650 | SQYD | 30.00 | 19,500.00 | 89.00 | 57,850.00 | 20.00 | 13,000.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -18 | CUYD | 1.00 | -18.00 | 1.00 | -18.00 | 1.00 | -18.00 | | 0010 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,764 | SQYD | 190.00 | 335,160.00 | 210.00 | 370,440.00 | 240.00 | 423,360.00 | | 0011 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 32 | LNFT | 300.00 | 9,600.00 | 425.00 | 13,600.00 | 300.00 | 9,600.00 | | 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 39,000.00 | 39,000.00 | 90,000.00 | 90,000.00 | | 0013 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.717 | MILE | 500.00 | 858.50 | 145.00 | 248.97 | 300.00 | 515.10 | | 0014 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.093 | MILE | 800.00 | 874.40 | 800.00 | 874.40 | 1,000.00 | 1,093.00 | | 0015 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.151 | MILE | 1,100.00 | 5,666.10 | 1,500.00 | 7,726.50 | 1,200.00 | 6,181.20 | | 0017 | 716-01-00100 | Mulch (Vegetative) | 0.04 | TON | 70,000.00 | 2,800.00 | 45,000.00 | 1,800.00 | 4,000.00 | 160.00 | | 0018 | 717-01-00100 | Seeding | 2 | LB | 500.00 | 1,000.00 | 1,000.00 | 2,000.00 | 400.00 | 800.00 | | 0019 | 718-01-00100 | Fertilizer | 40 | LB | 2.00 | 80.00 | 12.00 | 480.00 | 20.00 | 800.00 | | 0020 | 726-01-00100 | Bedding Material | 21.7 | CUYD | 200.00 | 4,340.00 | 200.00 | 4,340.00 | 185.00 | 4,014.50 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 110,000.00 | 110,000.00 | 130,000.00 | 130,000.00 | 145,000.00 | 145,000.00 | | 0022 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 325.00 | 1,300.00 | 110.00 | 440.00 | 150.00 | 600.00 | | 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.151 | MILE | 6,000.00 | 30,906.00 | 6,000.00 | 30,906.00 | 10,000.00 | 51,510.00 | | 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.093 | MILE | 3,300.00 | 3,606.90 | 1,500.00 | 1,639.50 | 4,000.00 | 4,372.00 | | 0026 | 735-01-00100 | Mailboxes | 4 | EACH | 1.00 | 4.00 | 1.00 | 4.00 | 50.00 | 200.00 | | 0027 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 600.00 | 2,400.00 | 550.00 | 2,200.00 | 500.00 | 2,000.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,000.00 | 16,000.00 | 7,500.00 | 7,500.00 | 20,000.00 | 20,000.00 | | 0029 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 5' X 3' | 12 | LNFT | 3,000.00 | 36,000.00 | 2,200.00 | 26,400.00 | 6,000.00 | 72,000.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 311 | EACH | 10.00 | 3,110.00 | 5.00 | 1,555.00 | 10.00 | 3,110.00 | | 0031 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.028 | MILE | 2,400.00 | 67.20 | 8,500.00 | 238.00 | 25,000.00 | 700.00 | | 0032 | 202-02-06020 | Removal of Concrete Box Culverts STA 42+29 - 36”X24”X24’; STA 71+32 – 36”X24”X25’; STA 87+41 – 36”X24”X24’ | 3 | EACH | 10,000.00 | 30,000.00 | 5,500.00 | 16,500.00 | 5,000.00 | 15,000.00 | | 0033 | 202-02-06040 | Removal of Concrete Box Headwall STA 42+29 LT, RT; STA 71+32 LT, RT; STA 87+41 LT, RT | 7 | EACH | 2,500.00 | 17,500.00 | 3,000.00 | 21,000.00 | 2,000.00 | 14,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,197,725.10 | | 1,351,906.37 | | 1,452,193.30 |
|