Proposal:H.015129.6
Parish:St. Tammany
Description:BOOTLEGGER RD - OCHSNER BLVD SIDEWALKS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$3,730,470.00
| Rank | License | Bidder | Construction Bid |
| 1 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $2,449,597.50 |
| 2 | 68424 | Procivil, LLC | $2,615,728.00 |
| 3 | 65070 | Gascot Construction, LLC | $2,750,321.46 |
| 4 | 68237 | GULF STATES SERVICES, LLC | $2,763,447.00 |
| 5 | 16378 | Mcdonald Const. Inc. of Slidell | $2,839,632.30 |
| 6 | 35678 | BEVERLY CONSTRUCTION CO. LLC | $2,975,156.50 |
| 7 | 48896 | Command Construction Industries LLC | $3,062,433.50 |
| 8 | 74839 | 21 Construction, L.L.C. | $3,076,923.20 |
| 9 | 46716 | BRUDD CONSTRUCTION CO., LLC | $3,155,060.01 |
| 10 | 34263 | LA Contracting Enterprise, L.L.C. | $3,351,000.00 |
| 11 | 12198 | Byron E. Talbot Contractor, Inc. | $3,548,802.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - KORT's CONSTRUCTION SERVICES, INC. | - 2 - Procivil, LLC | - 3 - Gascot Construction, LLC | - 4 - GULF STATES SERVICES, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.05 | LUMP | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 40,846.10 | 40,846.10 | 65,000.00 | 65,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 16,574.35 | 16,574.35 | 35,000.00 | 35,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 997 | SQYD | 20.00 | 19,940.00 | 15.00 | 14,955.00 | 11.80 | 11,764.60 | 25.00 | 24,925.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 291 | LNFT | 10.00 | 2,910.00 | 5.00 | 1,455.00 | 8.55 | 2,488.05 | 30.00 | 8,730.00 | | 0005 | 202-02-46002 | Removal of Walls, Retaining Structure, Concrete | 9.8 | SQYD | 500.00 | 4,900.00 | 50.00 | 490.00 | 347.45 | 3,405.01 | 760.00 | 7,448.00 | | 0006 | 202-03-38000 | Relocation of Sign | 2 | EACH | 150.00 | 300.00 | 100.00 | 200.00 | 175.05 | 350.10 | 125.00 | 250.00 | | 0007 | 202-03-38020 | Relocation of Sign Pole Metal signs at stations 125+67.43 & 137+75.82 | 2 | EACH | 300.00 | 600.00 | 1,000.00 | 2,000.00 | 989.60 | 1,979.20 | 250.00 | 500.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 70,000.00 | 70,000.00 | 30,000.00 | 30,000.00 | 63,094.00 | 63,094.00 | 160,000.00 | 160,000.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 406 | EACH | 20.00 | 8,120.00 | 5.00 | 2,030.00 | 37.30 | 15,143.80 | 1.00 | 406.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 8,439 | LNFT | 2.40 | 20,253.60 | 0.50 | 4,219.50 | 3.10 | 26,160.90 | 0.10 | 843.90 | | 0011 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 2,524 | LNFT | 96.00 | 242,304.00 | 100.00 | 252,400.00 | 109.05 | 275,242.20 | 96.00 | 242,304.00 | | 0012 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 4,812 | LNFT | 112.00 | 538,944.00 | 120.00 | 577,440.00 | 141.85 | 682,582.20 | 110.00 | 529,320.00 | | 0013 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 448 | LNFT | 138.00 | 61,824.00 | 160.00 | 71,680.00 | 154.50 | 69,216.00 | 165.00 | 73,920.00 | | 0014 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 55 | LNFT | 223.00 | 12,265.00 | 220.00 | 12,100.00 | 238.55 | 13,120.25 | 300.00 | 16,500.00 | | 0015 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,800.00 | 1,800.00 | 1,500.00 | 1,500.00 | 1,175.85 | 1,175.85 | 3,200.00 | 3,200.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 40 | LNFT | 100.00 | 4,000.00 | 10.00 | 400.00 | 9.15 | 366.00 | 1.00 | 40.00 | | 0017 | 702-02-00100 | Manholes (MH-06) | 7 | EACH | 4,600.00 | 32,200.00 | 4,000.00 | 28,000.00 | 4,534.80 | 31,743.60 | 6,000.00 | 42,000.00 | | 0018 | 702-03-00100 | Catch Basins (CB-01) | 59 | EACH | 6,150.00 | 362,850.00 | 7,000.00 | 413,000.00 | 6,829.25 | 402,925.75 | 7,000.00 | 413,000.00 | | 0019 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 6,500.00 | 6,500.00 | 8,000.00 | 8,000.00 | 7,897.10 | 7,897.10 | 8,400.00 | 8,400.00 | | 0020 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) Replace with Type C grates | 3 | EACH | 2,850.00 | 8,550.00 | 2,000.00 | 6,000.00 | 4,000.50 | 12,001.50 | 2,600.00 | 7,800.00 | | 0021 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 2,100.00 | 6,300.00 | 3,000.00 | 9,000.00 | 2,648.45 | 7,945.35 | 4,000.00 | 12,000.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 5,167.9 | SQYD | 59.00 | 304,906.10 | 80.00 | 413,432.00 | 59.95 | 309,815.61 | 62.00 | 320,409.80 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 511 | SQYD | 85.00 | 43,435.00 | 85.00 | 43,435.00 | 67.65 | 34,569.15 | 80.00 | 40,880.00 | | 0024 | 706-02-00300 | Concrete Drive (8" Thick) | 912.1 | SQYD | 98.00 | 89,385.80 | 95.00 | 86,649.50 | 81.10 | 73,971.31 | 90.00 | 82,089.00 | | 0025 | 706-04-00110 | Curb Ramps Type 4 | 35.8 | SQYD | 150.00 | 5,370.00 | 200.00 | 7,160.00 | 210.70 | 7,543.06 | 155.00 | 5,549.00 | | 0026 | 706-04-00110 | Curb Ramps Type 5 | 19.1 | SQYD | 130.00 | 2,483.00 | 200.00 | 3,820.00 | 221.80 | 4,236.38 | 155.00 | 2,960.50 | | 0027 | 706-04-00110 | Curb Ramps Type 7 | 159.6 | SQYD | 160.00 | 25,536.00 | 200.00 | 31,920.00 | 229.45 | 36,620.22 | 155.00 | 24,738.00 | | 0028 | 707-01-00100 | Concrete Curb | 1,489 | LNFT | 15.00 | 22,335.00 | 20.00 | 29,780.00 | 23.95 | 35,661.55 | 26.00 | 38,714.00 | | 0029 | 710-01-00100 | Flowable Fill | 0.8 | CUYD | 800.00 | 640.00 | 500.00 | 400.00 | 254.55 | 203.64 | 1,000.00 | 800.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | 62,357.30 | 62,357.30 | 65,000.00 | 65,000.00 | | 0031 | 714-01-00700 | Slab Sodding (Centipede) | 8,438 | SQYD | 8.00 | 67,504.00 | 10.00 | 84,380.00 | 8.85 | 74,676.30 | 6.00 | 50,628.00 | | 0032 | 726-01-00100 | Bedding Material | 1,635.8 | CUYD | 100.00 | 163,580.00 | 90.00 | 147,222.00 | 79.70 | 130,373.26 | 1.00 | 1,635.80 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 | 41,938.65 | 41,938.65 | 255,000.00 | 255,000.00 | | 0034 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 302 | LNFT | 1.50 | 453.00 | 8.00 | 2,416.00 | 7.50 | 2,265.00 | 1.50 | 453.00 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 83 | LNFT | 5.00 | 415.00 | 12.00 | 996.00 | 12.45 | 1,033.35 | 4.50 | 373.50 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 112 | LNFT | 24.00 | 2,688.00 | 32.00 | 3,584.00 | 34.85 | 3,903.20 | 22.00 | 2,464.00 | | 0037 | 732-01-05400 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 125 mil) | 159 | LNFT | 24.00 | 3,816.00 | 16.00 | 2,544.00 | 17.45 | 2,774.55 | 22.00 | 3,498.00 | | 0038 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 480.00 | 1,920.00 | 400.00 | 1,600.00 | 435.60 | 1,742.40 | 440.00 | 1,760.00 | | 0039 | 732-04-25000 | Plastic Pavement Legends and Symbols (YIELD) | 2 | EACH | 240.00 | 480.00 | 700.00 | 1,400.00 | 809.00 | 1,618.00 | 220.00 | 440.00 | | 0040 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 1 | EACH | 240.00 | 240.00 | 650.00 | 650.00 | 684.55 | 684.55 | 220.00 | 220.00 | | 0041 | 732-05-00100 | Removal of Existing Markings | 0.038 | MILE | 12,000.00 | 456.00 | 10,000.00 | 380.00 | 3,930.30 | 149.35 | 10,500.00 | 399.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 2.28 | ACRE | 3,500.00 | 7,980.00 | 3,000.00 | 6,840.00 | 3,604.85 | 8,219.06 | 3,200.00 | 7,296.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 62,228.50 | 62,228.50 | 17,500.00 | 17,500.00 | | 0044 | 741-35-00100 | Adjust Valve or Meter Box | 6 | EACH | 700.00 | 4,200.00 | 250.00 | 1,500.00 | 161.20 | 967.20 | 500.00 | 3,000.00 | | 0045 | 805-16-01400 | Reinforced Concrete Box Culverts (Extension) (8' x 6') | 28 | LNFT | 3,700.00 | 103,600.00 | 2,500.00 | 70,000.00 | 2,447.40 | 68,527.20 | 2,820.00 | 78,960.00 | | 0046 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 591.85LB Deformed Steel & 15.7CUYD Concrete | 1 | EACH | 35,500.00 | 35,500.00 | 30,000.00 | 30,000.00 | 38,093.55 | 38,093.55 | 50,000.00 | 50,000.00 | | 0047 | 810-02-00100 | Metal Bridge Railing | 63.4 | LNFT | 400.00 | 25,360.00 | 200.00 | 12,680.00 | 350.55 | 22,224.87 | 350.00 | 22,190.00 | | 0048 | NS-702-00101 | Paved Gutter Drain (Single) | 7 | EACH | 3,300.00 | 23,100.00 | 5,000.00 | 35,000.00 | 4,899.45 | 34,296.15 | 4,200.00 | 29,400.00 | | 0049 | NS-719-00002 | Tree Trimming | 1 | LUMP | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 2,115.80 | 2,115.80 | 2,200.00 | 2,200.00 | | 0050 | NS-719-00005 | Gravel Bed and Filter Cloth over Tree Roots | 26.7 | SQYD | 20.00 | 534.00 | 100.00 | 2,670.00 | 22.05 | 588.74 | 75.00 | 2,002.50 | | 0051 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 1 | EACH | 470.00 | 470.00 | 250.00 | 250.00 | 178.20 | 178.20 | 800.00 | 800.00 | | 0052 | NS-MSC-00279 | Adjusting Valve Boxes | 1 | EACH | 650.00 | 650.00 | 150.00 | 150.00 | 723.45 | 723.45 | 500.00 | 500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,449,597.50 | | 2,615,728.00 | | 2,750,321.46 | | 2,763,447.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Mcdonald Const. Inc. of Slidell | - 6 - BEVERLY CONSTRUCTION CO. LLC | - 7 - Command Construction Industries LLC | - 8 - 21 Construction, L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.05 | LUMP | 30,000.00 | 30,000.00 | 65,000.00 | 65,000.00 | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 997 | SQYD | 25.00 | 24,925.00 | 19.00 | 18,943.00 | 25.00 | 24,925.00 | 12.00 | 11,964.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 291 | LNFT | 28.00 | 8,148.00 | 6.00 | 1,746.00 | 1.00 | 291.00 | 10.00 | 2,910.00 | | 0005 | 202-02-46002 | Removal of Walls, Retaining Structure, Concrete | 9.8 | SQYD | 2,000.00 | 19,600.00 | 30.00 | 294.00 | 500.00 | 4,900.00 | 255.00 | 2,499.00 | | 0006 | 202-03-38000 | Relocation of Sign | 2 | EACH | 280.00 | 560.00 | 70.00 | 140.00 | 150.00 | 300.00 | 125.00 | 250.00 | | 0007 | 202-03-38020 | Relocation of Sign Pole Metal signs at stations 125+67.43 & 137+75.82 | 2 | EACH | 280.00 | 560.00 | 140.00 | 280.00 | 150.00 | 300.00 | 225.00 | 450.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 125,000.00 | 125,000.00 | 120,000.00 | 120,000.00 | 175,000.00 | 175,000.00 | 88,000.00 | 88,000.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 406 | EACH | 26.00 | 10,556.00 | 30.00 | 12,180.00 | 1.00 | 406.00 | 5.00 | 2,030.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 8,439 | LNFT | 3.00 | 25,317.00 | 2.50 | 21,097.50 | 5.00 | 42,195.00 | 3.00 | 25,317.00 | | 0011 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 2,524 | LNFT | 97.50 | 246,090.00 | 115.00 | 290,260.00 | 100.00 | 252,400.00 | 127.00 | 320,548.00 | | 0012 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 4,812 | LNFT | 136.50 | 656,838.00 | 139.00 | 668,868.00 | 130.00 | 625,560.00 | 130.00 | 625,560.00 | | 0013 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 448 | LNFT | 182.50 | 81,760.00 | 170.00 | 76,160.00 | 150.00 | 67,200.00 | 190.00 | 85,120.00 | | 0014 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 55 | LNFT | 280.00 | 15,400.00 | 270.00 | 14,850.00 | 325.00 | 17,875.00 | 295.00 | 16,225.00 | | 0015 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,800.00 | 1,800.00 | 2,700.00 | 2,700.00 | 1,500.00 | 1,500.00 | 1,695.00 | 1,695.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 40 | LNFT | 30.00 | 1,200.00 | 30.00 | 1,200.00 | 1.00 | 40.00 | 25.00 | 1,000.00 | | 0017 | 702-02-00100 | Manholes (MH-06) | 7 | EACH | 8,400.00 | 58,800.00 | 4,100.00 | 28,700.00 | 7,500.00 | 52,500.00 | 7,500.00 | 52,500.00 | | 0018 | 702-03-00100 | Catch Basins (CB-01) | 59 | EACH | 4,400.00 | 259,600.00 | 5,900.00 | 348,100.00 | 7,500.00 | 442,500.00 | 6,650.00 | 392,350.00 | | 0019 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 5,000.00 | 5,000.00 | 6,800.00 | 6,800.00 | 8,000.00 | 8,000.00 | 7,500.00 | 7,500.00 | | 0020 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) Replace with Type C grates | 3 | EACH | 5,000.00 | 15,000.00 | 2,900.00 | 8,700.00 | 1,500.00 | 4,500.00 | 2,500.00 | 7,500.00 | | 0021 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 2,800.00 | 8,400.00 | 1,900.00 | 5,700.00 | 1,500.00 | 4,500.00 | 1,200.00 | 3,600.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 5,167.9 | SQYD | 82.00 | 423,767.80 | 74.00 | 382,424.60 | 65.00 | 335,913.50 | 85.00 | 439,271.50 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 511 | SQYD | 98.00 | 50,078.00 | 80.00 | 40,880.00 | 75.00 | 38,325.00 | 105.00 | 53,655.00 | | 0024 | 706-02-00300 | Concrete Drive (8" Thick) | 912.1 | SQYD | 120.00 | 109,452.00 | 87.00 | 79,352.70 | 85.00 | 77,528.50 | 125.00 | 114,012.50 | | 0025 | 706-04-00110 | Curb Ramps Type 4 | 35.8 | SQYD | 192.00 | 6,873.60 | 200.00 | 7,160.00 | 125.00 | 4,475.00 | 185.00 | 6,623.00 | | 0026 | 706-04-00110 | Curb Ramps Type 5 | 19.1 | SQYD | 200.00 | 3,820.00 | 200.00 | 3,820.00 | 125.00 | 2,387.50 | 185.00 | 3,533.50 | | 0027 | 706-04-00110 | Curb Ramps Type 7 | 159.6 | SQYD | 215.00 | 34,314.00 | 225.00 | 35,910.00 | 125.00 | 19,950.00 | 185.00 | 29,526.00 | | 0028 | 707-01-00100 | Concrete Curb | 1,489 | LNFT | 17.00 | 25,313.00 | 22.00 | 32,758.00 | 20.00 | 29,780.00 | 30.00 | 44,670.00 | | 0029 | 710-01-00100 | Flowable Fill | 0.8 | CUYD | 1,400.00 | 1,120.00 | 4,000.00 | 3,200.00 | 750.00 | 600.00 | 4,650.00 | 3,720.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 85,000.00 | 85,000.00 | 50,000.00 | 50,000.00 | 98,000.00 | 98,000.00 | | 0031 | 714-01-00700 | Slab Sodding (Centipede) | 8,438 | SQYD | 14.00 | 118,132.00 | 7.50 | 63,285.00 | 7.00 | 59,066.00 | 11.25 | 94,927.50 | | 0032 | 726-01-00100 | Bedding Material | 1,635.8 | CUYD | 90.00 | 147,222.00 | 112.00 | 183,209.60 | 75.00 | 122,685.00 | 92.00 | 150,493.60 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 200,000.00 | 200,000.00 | 300,000.00 | 300,000.00 | 70,000.00 | 70,000.00 | | 0034 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 302 | LNFT | 6.50 | 1,963.00 | 1.30 | 392.60 | 2.00 | 604.00 | 6.50 | 1,963.00 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 83 | LNFT | 15.00 | 1,245.00 | 4.00 | 332.00 | 4.00 | 332.00 | 11.00 | 913.00 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 112 | LNFT | 30.00 | 3,360.00 | 21.00 | 2,352.00 | 20.00 | 2,240.00 | 30.00 | 3,360.00 | | 0037 | 732-01-05400 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 125 mil) | 159 | LNFT | 15.00 | 2,385.00 | 21.00 | 3,339.00 | 20.00 | 3,180.00 | 15.00 | 2,385.00 | | 0038 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 500.00 | 2,000.00 | 425.00 | 1,700.00 | 400.00 | 1,600.00 | 370.00 | 1,480.00 | | 0039 | 732-04-25000 | Plastic Pavement Legends and Symbols (YIELD) | 2 | EACH | 700.00 | 1,400.00 | 210.00 | 420.00 | 400.00 | 800.00 | 700.00 | 1,400.00 | | 0040 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 1 | EACH | 600.00 | 600.00 | 210.00 | 210.00 | 400.00 | 400.00 | 585.00 | 585.00 | | 0041 | 732-05-00100 | Removal of Existing Markings | 0.038 | MILE | 3,800.00 | 144.40 | 12,000.00 | 456.00 | 10,000.00 | 380.00 | 3,200.00 | 121.60 | | 0042 | 739-01-00100 | Hydro-Seeding | 2.28 | ACRE | 3,600.00 | 8,208.00 | 3,100.00 | 7,068.00 | 4,500.00 | 10,260.00 | 3,500.00 | 7,980.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 29,000.00 | 29,000.00 | 50,000.00 | 50,000.00 | 55,000.00 | 55,000.00 | | 0044 | 741-35-00100 | Adjust Valve or Meter Box | 6 | EACH | 400.00 | 2,400.00 | 400.00 | 2,400.00 | 150.00 | 900.00 | 300.00 | 1,800.00 | | 0045 | 805-16-01400 | Reinforced Concrete Box Culverts (Extension) (8' x 6') | 28 | LNFT | 1,633.00 | 45,724.00 | 1,200.00 | 33,600.00 | 2,000.00 | 56,000.00 | 3,000.00 | 84,000.00 | | 0046 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 591.85LB Deformed Steel & 15.7CUYD Concrete | 1 | EACH | 40,000.00 | 40,000.00 | 13,000.00 | 13,000.00 | 30,000.00 | 30,000.00 | 45,000.00 | 45,000.00 | | 0047 | 810-02-00100 | Metal Bridge Railing | 63.4 | LNFT | 300.00 | 19,020.00 | 255.00 | 16,167.00 | 250.00 | 15,850.00 | 250.00 | 15,850.00 | | 0048 | NS-702-00101 | Paved Gutter Drain (Single) | 7 | EACH | 1,500.00 | 10,500.00 | 4,000.00 | 28,000.00 | 2,500.00 | 17,500.00 | 3,500.00 | 24,500.00 | | 0049 | NS-719-00002 | Tree Trimming | 1 | LUMP | 10,000.00 | 10,000.00 | 1,000.00 | 1,000.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | | 0050 | NS-719-00005 | Gravel Bed and Filter Cloth over Tree Roots | 26.7 | SQYD | 95.00 | 2,536.50 | 45.00 | 1,201.50 | 50.00 | 1,335.00 | 50.00 | 1,335.00 | | 0051 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 1 | EACH | 1,000.00 | 1,000.00 | 300.00 | 300.00 | 300.00 | 300.00 | 1,500.00 | 1,500.00 | | 0052 | NS-MSC-00279 | Adjusting Valve Boxes | 1 | EACH | 500.00 | 500.00 | 500.00 | 500.00 | 150.00 | 150.00 | 300.00 | 300.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,839,632.30 | | 2,975,156.50 | | 3,062,433.50 | | 3,076,923.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - BRUDD CONSTRUCTION CO., LLC | - 10 - LA Contracting Enterprise, L.L.C. | - 11 - Byron E. Talbot Contractor, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.05 | LUMP | 106,000.00 | 106,000.00 | 43,000.00 | 43,000.00 | 130,000.00 | 130,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 71,026.00 | 71,026.00 | 30,000.00 | 30,000.00 | 33,000.00 | 33,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 997 | SQYD | 41.21 | 41,086.37 | 32.00 | 31,904.00 | 40.00 | 39,880.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 291 | LNFT | 34.75 | 10,112.25 | 9.00 | 2,619.00 | 11.00 | 3,201.00 | | 0005 | 202-02-46002 | Removal of Walls, Retaining Structure, Concrete | 9.8 | SQYD | 567.00 | 5,556.60 | 910.00 | 8,918.00 | 1,600.00 | 15,680.00 | | 0006 | 202-03-38000 | Relocation of Sign | 2 | EACH | 177.00 | 354.00 | 95.00 | 190.00 | 160.00 | 320.00 | | 0007 | 202-03-38020 | Relocation of Sign Pole Metal signs at stations 125+67.43 & 137+75.82 | 2 | EACH | 177.00 | 354.00 | 115.00 | 230.00 | 275.00 | 550.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 64,500.00 | 64,500.00 | 180,000.00 | 180,000.00 | 110,000.00 | 110,000.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 406 | EACH | 34.00 | 13,804.00 | 27.00 | 10,962.00 | 32.00 | 12,992.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 8,439 | LNFT | 2.80 | 23,629.20 | 2.00 | 16,878.00 | 2.50 | 21,097.50 | | 0011 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 2,524 | LNFT | 123.00 | 310,452.00 | 115.00 | 290,260.00 | 120.00 | 302,880.00 | | 0012 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 4,812 | LNFT | 159.00 | 765,108.00 | 140.00 | 673,680.00 | 157.00 | 755,484.00 | | 0013 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 448 | LNFT | 184.00 | 82,432.00 | 204.00 | 91,392.00 | 200.00 | 89,600.00 | | 0014 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 55 | LNFT | 467.00 | 25,685.00 | 297.00 | 16,335.00 | 367.00 | 20,185.00 | | 0015 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,180.00 | 1,180.00 | 5,200.00 | 5,200.00 | 3,000.00 | 3,000.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 40 | LNFT | 11.80 | 472.00 | 408.00 | 16,320.00 | 50.00 | 2,000.00 | | 0017 | 702-02-00100 | Manholes (MH-06) | 7 | EACH | 5,179.00 | 36,253.00 | 10,900.00 | 76,300.00 | 7,500.00 | 52,500.00 | | 0018 | 702-03-00100 | Catch Basins (CB-01) | 59 | EACH | 6,834.00 | 403,206.00 | 6,100.00 | 359,900.00 | 9,000.00 | 531,000.00 | | 0019 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 10,834.00 | 10,834.00 | 8,100.00 | 8,100.00 | 11,700.00 | 11,700.00 | | 0020 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) Replace with Type C grates | 3 | EACH | 1,867.00 | 5,601.00 | 8,600.00 | 25,800.00 | 4,800.00 | 14,400.00 | | 0021 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 3,135.00 | 9,405.00 | 3,600.00 | 10,800.00 | 850.00 | 2,550.00 | | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 5,167.9 | SQYD | 47.60 | 245,992.04 | 54.00 | 279,066.60 | 67.00 | 346,249.30 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 511 | SQYD | 256.83 | 131,240.13 | 58.00 | 29,638.00 | 105.00 | 53,655.00 | | 0024 | 706-02-00300 | Concrete Drive (8" Thick) | 912.1 | SQYD | 173.48 | 158,231.11 | 65.00 | 59,286.50 | 120.00 | 109,452.00 | | 0025 | 706-04-00110 | Curb Ramps Type 4 | 35.8 | SQYD | 139.51 | 4,994.46 | 138.00 | 4,940.40 | 350.00 | 12,530.00 | | 0026 | 706-04-00110 | Curb Ramps Type 5 | 19.1 | SQYD | 131.66 | 2,514.71 | 145.00 | 2,769.50 | 350.00 | 6,685.00 | | 0027 | 706-04-00110 | Curb Ramps Type 7 | 159.6 | SQYD | 157.08 | 25,069.97 | 171.00 | 27,291.60 | 350.00 | 55,860.00 | | 0028 | 707-01-00100 | Concrete Curb | 1,489 | LNFT | 26.87 | 40,009.43 | 19.00 | 28,291.00 | 21.50 | 32,013.50 | | 0029 | 710-01-00100 | Flowable Fill | 0.8 | CUYD | 479.63 | 383.70 | 6,900.00 | 5,520.00 | 3,500.00 | 2,800.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,055.00 | 35,055.00 | 125,000.00 | 125,000.00 | 115,000.00 | 115,000.00 | | 0031 | 714-01-00700 | Slab Sodding (Centipede) | 8,438 | SQYD | 7.90 | 66,660.20 | 11.00 | 92,818.00 | 11.00 | 92,818.00 | | 0032 | 726-01-00100 | Bedding Material | 1,635.8 | CUYD | 132.00 | 215,925.60 | 152.00 | 248,641.60 | 155.00 | 253,549.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 65,000.00 | 65,000.00 | 203,092.80 | 203,092.80 | 51,000.00 | 51,000.00 | | 0034 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 302 | LNFT | 7.00 | 2,114.00 | 1.00 | 302.00 | 1.40 | 422.80 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 83 | LNFT | 11.50 | 954.50 | 4.00 | 332.00 | 4.40 | 365.20 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 112 | LNFT | 33.00 | 3,696.00 | 20.00 | 2,240.00 | 22.00 | 2,464.00 | | 0037 | 732-01-05400 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 125 mil) | 159 | LNFT | 16.00 | 2,544.00 | 20.00 | 3,180.00 | 22.00 | 3,498.00 | | 0038 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 4 | EACH | 410.00 | 1,640.00 | 400.00 | 1,600.00 | 440.00 | 1,760.00 | | 0039 | 732-04-25000 | Plastic Pavement Legends and Symbols (YIELD) | 2 | EACH | 750.00 | 1,500.00 | 200.00 | 400.00 | 220.00 | 440.00 | | 0040 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 1 | EACH | 600.00 | 600.00 | 200.00 | 200.00 | 220.00 | 220.00 | | 0041 | 732-05-00100 | Removal of Existing Markings | 0.038 | MILE | 130.00 | 4.94 | 10,500.00 | 399.00 | 11,000.00 | 418.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 2.28 | ACRE | 3,250.00 | 7,410.00 | 3,000.00 | 6,840.00 | 3,500.00 | 7,980.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 53,000.00 | 53,000.00 | 27,000.00 | 27,000.00 | | 0044 | 741-35-00100 | Adjust Valve or Meter Box | 6 | EACH | 295.00 | 1,770.00 | 900.00 | 5,400.00 | 330.00 | 1,980.00 | | 0045 | 805-16-01400 | Reinforced Concrete Box Culverts (Extension) (8' x 6') | 28 | LNFT | 2,256.00 | 63,168.00 | 3,700.00 | 103,600.00 | 3,100.00 | 86,800.00 | | 0046 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 591.85LB Deformed Steel & 15.7CUYD Concrete | 1 | EACH | 54,905.00 | 54,905.00 | 65,500.00 | 65,500.00 | 65,000.00 | 65,000.00 | | 0047 | 810-02-00100 | Metal Bridge Railing | 63.4 | LNFT | 118.00 | 7,481.20 | 520.00 | 32,968.00 | 450.00 | 28,530.00 | | 0048 | NS-702-00101 | Paved Gutter Drain (Single) | 7 | EACH | 1,770.00 | 12,390.00 | 9,000.00 | 63,000.00 | 4,700.00 | 32,900.00 | | 0049 | NS-719-00002 | Tree Trimming | 1 | LUMP | 2,000.00 | 2,000.00 | 1,900.00 | 1,900.00 | 3,000.00 | 3,000.00 | | 0050 | NS-719-00005 | Gravel Bed and Filter Cloth over Tree Roots | 26.7 | SQYD | 118.00 | 3,150.60 | 100.00 | 2,670.00 | 55.00 | 1,468.50 | | 0051 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 1 | EACH | 1,250.00 | 1,250.00 | 225.00 | 225.00 | 375.00 | 375.00 | | 0052 | NS-MSC-00279 | Adjusting Valve Boxes | 1 | EACH | 355.00 | 355.00 | 2,100.00 | 2,100.00 | 550.00 | 550.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,155,060.01 | | 3,351,000.00 | | 3,548,802.80 |
|