Proposal:H.014465.6-R1
Parish:Vermilion
Routes:LA 82
Description:LA 82: VERMILION RIVER MB RH(PERRY)(HBI)
Type Construction:PRECAST CONCRETE PILES, STEEL PILES, STRUCTURAL METALWORK, MOVABLE BRIDGE REHABILITATION, BRIDGE CLEANING AND PAINTING, AND RELATED WORK.
Estimated Construction Cost:$21,988,898.34
| Rank | License | Bidder | Construction Bid |
| 1 | 26435 | C.E.C., Inc. | $24,175,801.27 |
| 2 | 00009 | Coastal Contractors, LLC | $25,595,784.39 |
| 3 | 59114 | SOUTHERN ROAD & BRIDGE, LLC | $31,618,067.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - C.E.C., Inc. | - 2 - Coastal Contractors, LLC | - 3 - SOUTHERN ROAD & BRIDGE, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.6 | LUMP | 70,000.00 | 70,000.00 | 75,000.00 | 75,000.00 | 95,000.00 | 95,000.00 | | 0002 | 202-02-00050 | Removal of APPROACH SPAN STRUCTURAL STEEL | 1 | LUMP | 240,000.00 | 240,000.00 | 250,000.00 | 250,000.00 | 150,000.00 | 150,000.00 | | 0003 | 202-02-00050 | Removal of LIFT SPAN SOLE PLATES AND SHOES (LEAD COATED) | 1 | LUMP | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 50,000.00 | 50,000.00 | | 0004 | 202-02-00050 | Removal of LIFT SPAN STRUCTURAL STEEL (LEAD COATED) | 1 | LUMP | 65,000.00 | 65,000.00 | 300,000.00 | 300,000.00 | 50,000.00 | 50,000.00 | | 0005 | 202-02-00050 | Removal of MACHINERY PLATFORM STRUCTURAL STEEL (LEAD COATED) | 1 | LUMP | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 95,000.00 | 95,000.00 | | 0006 | 202-02-00050 | Removal of PORTAL BRACING STRUCTURAL STEEL (LEAD COATED) | 1 | LUMP | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 | 95,000.00 | 95,000.00 | | 0007 | 202-02-10000 | Removal of Existing Steel Grid Deck | 1 | LUMP | 50,000.00 | 50,000.00 | 45,000.00 | 45,000.00 | 150,000.00 | 150,000.00 | | 0008 | 202-02-12300 | Removal of Fender System | 1 | EACH | 500,000.00 | 500,000.00 | 350,000.00 | 350,000.00 | 450,000.00 | 450,000.00 | | 0009 | 202-02-30000 | Removal of Operators House | 1 | EACH | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | 450,000.00 | 450,000.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 19,400.00 | 19,400.00 | 35,000.00 | 35,000.00 | 150,000.00 | 150,000.00 | | 0011 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 2 | EACH | 770.00 | 1,540.00 | 1,800.00 | 3,600.00 | 5,000.00 | 10,000.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 952 | LNFT | 3.60 | 3,427.20 | 4.50 | 4,284.00 | 6.00 | 5,712.00 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 124.7 | TON | 330.00 | 41,151.00 | 375.00 | 46,762.50 | 1,500.00 | 187,050.00 | | 0014 | 703-03-00100 | Perforated Pipe Underdrains | 75 | LNFT | 120.00 | 9,000.00 | 60.00 | 4,500.00 | 50.00 | 3,750.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 50 | LNFT | 59.00 | 2,950.00 | 35.00 | 1,750.00 | 55.00 | 2,750.00 | | 0016 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 60 | LNFT | 92.00 | 5,520.00 | 75.00 | 4,500.00 | 150.00 | 9,000.00 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 138.00 | 13,800.00 | 145.00 | 14,500.00 | 200.00 | 20,000.00 | | 0018 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 1 | EACH | 4,110.00 | 4,110.00 | 4,250.00 | 4,250.00 | 4,500.00 | 4,500.00 | | 0019 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 3,960.00 | 11,880.00 | 4,200.00 | 12,600.00 | 4,500.00 | 13,500.00 | | 0020 | 711-01-02080 | Riprap (10 lb, 24" Thick) | 376 | SQYD | 360.00 | 135,360.00 | 265.00 | 99,640.00 | 385.00 | 144,760.00 | | 0021 | 711-04-00100 | Geotextile Fabric | 376 | SQYD | 2.40 | 902.40 | 10.00 | 3,760.00 | 10.00 | 3,760.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 175,000.00 | 175,000.00 | 200,000.00 | 200,000.00 | 250,000.00 | 250,000.00 | | 0023 | 713-11-00100 | Portable Changeable Message Signs | 5 | EACH | 8,700.00 | 43,500.00 | 28,000.00 | 140,000.00 | 25,000.00 | 125,000.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 2,100,000.00 | 2,100,000.00 | 2,650,000.00 | 2,650,000.00 | 2,500,000.00 | 2,500,000.00 | | 0025 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 56 | SQFT | 150.00 | 8,400.00 | 70.00 | 3,920.00 | 55.00 | 3,080.00 | | 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 20 | EACH | 12.00 | 240.00 | 35.00 | 700.00 | 15.00 | 300.00 | | 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.292 | MILE | 11,820.00 | 3,451.44 | 15,500.00 | 4,526.00 | 50,000.00 | 14,600.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 95,000.00 | 95,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | | 0029 | 804-01-00200 | Precast Concrete Piles (14") | 213 | LNFT | 300.00 | 63,900.00 | 325.00 | 69,225.00 | 285.00 | 60,705.00 | | 0030 | 804-01-00400 | Precast Concrete Piles (18") | 1,280 | LNFT | 335.00 | 428,800.00 | 245.00 | 313,600.00 | 325.00 | 416,000.00 | | 0031 | 804-01-00600 | Precast Concrete Piles (24") | 700 | LNFT | 485.00 | 339,500.00 | 380.00 | 266,000.00 | 385.00 | 269,500.00 | | 0032 | 804-03-01800 | Steel Piles (24" Pipe) | 8,492 | LNFT | 655.00 | 5,562,260.00 | 540.00 | 4,585,680.00 | 325.00 | 2,759,900.00 | | 0033 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 150,000.00 | 150,000.00 | | 0034 | 804-18-00100 | Vibration Monitoring | 30 | DAY | 2,200.00 | 66,000.00 | 1,500.00 | 45,000.00 | 2,500.00 | 75,000.00 | | 0035 | 805-01-00200 | Class A1 Concrete (Deck) | 710.95 | CUYD | 850.00 | 604,307.50 | 3,850.00 | 2,737,157.50 | 3,000.00 | 2,132,850.00 | | 0036 | 805-01-00900 | Class A1 Concrete (GENERATOR PLATFORM) | 31.02 | CUYD | 3,850.00 | 119,427.00 | 4,000.00 | 124,080.00 | 3,000.00 | 93,060.00 | | 0037 | 805-01-00900 | Class A1 Concrete (MOVABLE TRAFFIC BARRIER PILE CAP) | 10.71 | CUYD | 4,200.00 | 44,982.00 | 4,100.00 | 43,911.00 | 4,500.00 | 48,195.00 | | 0038 | 805-01-00900 | Class A1 Concrete (OPERATOR'S HOUSE FIRST FLOOR SLAB) | 36.6 | CUYD | 11,800.00 | 431,880.00 | 4,000.00 | 146,400.00 | 2,500.00 | 91,500.00 | | 0039 | 805-01-00900 | Class A1 Concrete (TRAFFIC GATE FOUNDATION) | 11.6 | CUYD | 3,000.00 | 34,800.00 | 3,300.00 | 38,280.00 | 4,500.00 | 52,200.00 | | 0040 | 805-01-00900 | Class A1 Concrete (WALKWAY TO OPERATOR'S HOUSE) | 26.52 | CUYD | 8,800.00 | 233,376.00 | 3,000.00 | 79,560.00 | 4,500.00 | 119,340.00 | | 0041 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) (OPERATOR'S HOUSE) | 437 | SQFT | 30.00 | 13,110.00 | 4.50 | 1,966.50 | 15.00 | 6,555.00 | | 0042 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) (CLASS 3 SPECIAL FINISH)(OPERATOR'S HOUSE) | 437 | SQFT | 15.00 | 6,555.00 | 5.50 | 2,403.50 | 15.00 | 6,555.00 | | 0043 | 806-01-00100 | Deformed Reinforcing Steel (APPROACH SPANS) | 96,400 | LB | 1.62 | 156,168.00 | 2.30 | 221,720.00 | 2.50 | 241,000.00 | | 0044 | 806-01-00100 | Deformed Reinforcing Steel (GENERATOR PLATFORM) | 7,687 | LB | 1.89 | 14,528.43 | 2.40 | 18,448.80 | 2.50 | 19,217.50 | | 0045 | 806-01-00100 | Deformed Reinforcing Steel (MOVABLE TRAFFIC BARRIER PILE CAP) | 1,203 | LB | 2.67 | 3,212.01 | 2.90 | 3,488.70 | 2.50 | 3,007.50 | | 0046 | 806-01-00100 | Deformed Reinforcing Steel (OPERATOR'S HOUSE FIRST FLOOR SLAB) | 15,557 | LB | 1.93 | 30,025.01 | 2.77 | 43,092.89 | 2.50 | 38,892.50 | | 0047 | 806-01-00100 | Deformed Reinforcing Steel (TRAFFIC GATE FOUNDATION) | 1,288 | LB | 2.49 | 3,207.12 | 2.75 | 3,542.00 | 2.50 | 3,220.00 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel (WALKWAY TO OPERATOR'S HOUSE) | 7,759 | LB | 1.24 | 9,621.16 | 4.00 | 31,036.00 | 2.50 | 19,397.50 | | 0049 | 807-01-00200 | Structural Metalwork (Grade 50) | 260,699 | LUMP | 1,380,000.00 | 1,380,000.00 | 1,025,000.00 | 1,025,000.00 | 1,950,000.00 | 1,950,000.00 | | 0050 | 807-03-00100 | Structural Metalwork (Access System) | 6,775 | LUMP | 160,000.00 | 160,000.00 | 120,000.00 | 120,000.00 | 450,000.00 | 450,000.00 | | 0051 | 807-04-00100 | Structural Metalwork (FENDER ACCESS) | 42,923 | LUMP | 285,000.00 | 285,000.00 | 355,000.00 | 355,000.00 | 550,000.00 | 550,000.00 | | 0052 | 808-01-00300 | Steel Grid Flooring (LIFT SPAN) | 1,805 | SQFT | 270.00 | 487,350.00 | 215.00 | 388,075.00 | 325.00 | 586,625.00 | | 0053 | 810-04-00100 | Hand Railing (GENERATOR PLATFORM) | 107 | LNFT | 335.00 | 35,845.00 | 275.00 | 29,425.00 | 385.00 | 41,195.00 | | 0054 | 810-04-00100 | Hand Railing (MACHINERY TOWER PLATFORM WITH TOE PLATE) | 279 | LNFT | 335.00 | 93,465.00 | 350.00 | 97,650.00 | 650.00 | 181,350.00 | | 0055 | 810-04-00100 | Hand Railing (MOVABLE TRAFFIC BARRIERS AND MAIN PIER) | 144 | LNFT | 335.00 | 48,240.00 | 275.00 | 39,600.00 | 485.00 | 69,840.00 | | 0056 | 810-04-00100 | Hand Railing (WALKWAY TO OPERATOR'S HOUSE) | 346 | LNFT | 265.00 | 91,690.00 | 230.00 | 79,580.00 | 750.00 | 259,500.00 | | 0057 | 811-01-00100 | Cleaning and Painting Lift Span and Approaches | 75,500 | LUMP | 1,700,000.00 | 1,700,000.00 | 2,000,000.00 | 2,000,000.00 | 2,400,000.00 | 2,400,000.00 | | 0058 | 818-04-00100 | Reinforced Plastic Composite Marine Timber (6"x12") | 2,862 | LNFT | 200.00 | 572,400.00 | 235.00 | 672,570.00 | 350.00 | 1,001,700.00 | | 0059 | 820-02-00100 | Temporary Operation & Maintenance of Movable Span | 400 | DAY | 1,000.00 | 400,000.00 | 400.00 | 160,000.00 | 1,000.00 | 400,000.00 | | 0060 | 830-01-00100 | Bridge Superstructure Repair (APPROACH SPAN) | 10 | EACH | 20,000.00 | 200,000.00 | 19,000.00 | 190,000.00 | 125,000.00 | 1,250,000.00 | | 0061 | 830-01-00100 | Bridge Superstructure Repair (CLEANING AND PAINTING COUNTERWEIGHTS) | 2 | EACH | 7,260.00 | 14,520.00 | 43,000.00 | 86,000.00 | 95,000.00 | 190,000.00 | | 0062 | 830-01-00100 | Bridge Superstructure Repair (LIFT GIRDER SHOES, PLATES & SOLE PLATES) | 4 | EACH | 14,000.00 | 56,000.00 | 15,500.00 | 62,000.00 | 95,000.00 | 380,000.00 | | 0063 | 830-01-00100 | Bridge Superstructure Repair (LIFT SPAN) | 1 | EACH | 300,000.00 | 300,000.00 | 340,000.00 | 340,000.00 | 400,000.00 | 400,000.00 | | 0064 | 830-01-00100 | Bridge Superstructure Repair (PORTAL BRACING) | 2 | EACH | 250,000.00 | 500,000.00 | 265,000.00 | 530,000.00 | 900,000.00 | 1,800,000.00 | | 0065 | 830-01-00100 | Bridge Superstructure Repair (TOWER DRIVE MACHINERY DECK) | 1 | EACH | 210,000.00 | 210,000.00 | 235,000.00 | 235,000.00 | 600,000.00 | 600,000.00 | | 0066 | 830-01-00100 | Bridge Superstructure Repair [BRIDGE RAILING] | 1 | EACH | 300,000.00 | 300,000.00 | 275,000.00 | 275,000.00 | 125,000.00 | 125,000.00 | | 0067 | 830-02-00100 | Bridge Substructure Repair (CLEANING EXISTING CONCRETE SURFACES) | 14 | EACH | 2,500.00 | 35,000.00 | 25,000.00 | 350,000.00 | 3,500.00 | 49,000.00 | | 0068 | 830-02-00100 | Bridge Substructure Repair (PIER MODIFICATION) | 2 | EACH | 75,000.00 | 150,000.00 | 90,000.00 | 180,000.00 | 300,000.00 | 600,000.00 | | 0069 | NS-818-00001 | Navigation Clearance Gauge (Mounted) | 2 | EACH | 20,000.00 | 40,000.00 | 3,500.00 | 7,000.00 | 5,000.00 | 10,000.00 | | 0070 | TS-821-02100 | Vertical Lift Bridge Machinery | 1 | LUMP | 1,920,000.00 | 1,920,000.00 | 1,900,000.00 | 1,900,000.00 | 3,750,000.00 | 3,750,000.00 | | 0071 | TS-821-06100 | Coating of New Movable Bridge Machinery | 1 | LUMP | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 200,000.00 | 200,000.00 | | 0072 | TS-821-06200 | Coating of Existing Movable Bridge Machinery | 1 | LUMP | 25,000.00 | 25,000.00 | 60,000.00 | 60,000.00 | 350,000.00 | 350,000.00 | | 0073 | TS-822-09100 | Electrical System (BRIDGE) | 1 | LUMP | 2,450,000.00 | 2,450,000.00 | 1,950,000.00 | 1,950,000.00 | 1,450,000.00 | 1,450,000.00 | | 0074 | TS-823-01100 | Bridge Operator's House New Construction | 1 | LUMP | 810,000.00 | 810,000.00 | 1,125,000.00 | 1,125,000.00 | 785,000.00 | 785,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 24,175,801.27 | | 25,595,784.39 | | 31,618,067.00 |
|