Proposal:H.014254.6
Parish:East Feliciana
Routes:LA 955
Description:LA 955: BRIDGES NEAR CLINTON
Type Construction:CLEARING AND GRUBBING, REMOVAL OF CONCRETE SLAB SPAN BRIDGE, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, PRECAST REINCORCED CONCRETE BOX CULVERTS, AND RELATED WORK.
Estimated Construction Cost:$6,699,792.95
| Rank | License | Bidder | Construction Bid |
| 1 | 01516 | Elevate Heavy Civil Construction, LLC | $5,733,000.90 |
| 2 | 39613 | Baker Pile Driving and Site Work, LLC | $5,991,698.69 |
| 3 | 55505 | MERRICK, LLC | $6,259,675.60 |
| 4 | 39462 | JB JAMES CONSTRUCTION LLC | $7,087,994.22 |
| 5 | 12312 | Gilchrist Construction Company, LLC | $7,345,904.05 |
| 6 | 00009 | Coastal Contractors, LLC | $7,392,257.35 |
| 7 | 00044 | Guinn Construction, LLC | $7,726,278.35 |
| 8 | 56994 | Matt L. Guinn Construction, LLC | $8,490,381.15 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elevate Heavy Civil Construction, LLC | - 2 - Baker Pile Driving and Site Work, LLC | - 3 - MERRICK, LLC | - 4 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.5 | LUMP | 155,000.00 | 155,000.00 | 76,888.59 | 76,888.59 | 100,000.00 | 100,000.00 | 330,000.00 | 330,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 28,500.00 | 28,500.00 | 24,042.24 | 24,042.24 | 15,000.00 | 15,000.00 | 45,000.00 | 45,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 2,903 | SQYD | 16.00 | 46,448.00 | 15.53 | 45,083.59 | 10.00 | 29,030.00 | 22.00 | 63,866.00 | | 0004 | 202-02-04501 | Removal of Bridge (Str. No. 611908191503481, 97' x 24' Conc. Slab Span Bridge) | 2,328 | LUMP | 20,000.00 | 20,000.00 | 45,672.04 | 45,672.04 | 55,000.00 | 55,000.00 | 90,000.00 | 90,000.00 | | 0005 | 202-02-04501 | Removal of Bridge (Str. No. 611908191506451, 135' x 25' Conc. Slab Span Bridge) | 3,375 | LUMP | 20,000.00 | 20,000.00 | 65,715.17 | 65,715.17 | 65,000.00 | 65,000.00 | 75,000.00 | 75,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (Str. No. 611908191507381, 59' x 24' Conc. Slab Span Bridge) | 1,416 | LUMP | 20,000.00 | 20,000.00 | 28,163.65 | 28,163.65 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | | 0007 | 202-02-04501 | Removal of Bridge (Str. No. 619058191505321, 39' x 24' Conc. Slab Span Bridge) | 936 | LUMP | 20,000.00 | 20,000.00 | 18,775.76 | 18,775.76 | 40,000.00 | 40,000.00 | 60,000.00 | 60,000.00 | | 0008 | 202-02-12000 | Removal of Fence | 742 | LNFT | 3.00 | 2,226.00 | 10.73 | 7,961.66 | 5.00 | 3,710.00 | 1.50 | 1,113.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 2,475 | LNFT | 7.00 | 17,325.00 | 14.30 | 35,392.50 | 12.00 | 29,700.00 | 8.00 | 19,800.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) (27" CMP) | 30 | LNFT | 48.00 | 1,440.00 | 38.67 | 1,160.10 | 30.00 | 900.00 | 60.00 | 1,800.00 | | 0011 | 202-02-32120 | Removal of Pipe (Side Drain) (36" CMP) | 40 | LNFT | 36.00 | 1,440.00 | 37.54 | 1,501.60 | 30.00 | 1,200.00 | 60.00 | 2,400.00 | | 0012 | 203-02-00100 | Drainage Excavation | 1,096 | CUYD | 31.00 | 33,976.00 | 35.79 | 39,225.84 | 18.00 | 19,728.00 | 34.00 | 37,264.00 | | 0013 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 169,000.00 | 169,000.00 | 123,163.48 | 123,163.48 | 350,000.00 | 350,000.00 | 320,000.00 | 320,000.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 190.00 | 950.00 | 155.51 | 777.55 | 200.00 | 1,000.00 | 200.00 | 1,000.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 5,060 | LNFT | 2.00 | 10,120.00 | 2.17 | 10,980.20 | 3.25 | 16,445.00 | 8.00 | 40,480.00 | | 0016 | 302-02-10070 | Class II Base Course (10" Thick) (Asphalt Concrete Base) | 3,590.3 | SQYD | 74.00 | 265,682.20 | 79.90 | 286,864.97 | 80.00 | 287,224.00 | 72.00 | 258,501.60 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 12.8 | CUYD | 294.00 | 3,763.20 | 153.00 | 1,958.40 | 200.00 | 2,560.00 | 280.00 | 3,584.00 | | 0018 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 19.1 | CUYD | 245.00 | 4,679.50 | 184.00 | 3,514.40 | 150.00 | 2,865.00 | 300.00 | 5,730.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 1,189.9 | TON | 175.00 | 208,232.50 | 178.00 | 211,802.20 | 195.00 | 232,030.50 | 165.00 | 196,333.50 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 275.9 | TON | 307.00 | 84,701.30 | 329.00 | 90,771.10 | 320.00 | 88,288.00 | 285.00 | 78,631.50 | | 0021 | 509-01-00100 | Milling Asphalt Pavement | 3,032 | SQYD | 6.00 | 18,192.00 | 6.70 | 20,314.40 | 7.00 | 21,224.00 | 10.00 | 30,320.00 | | 0022 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -168 | CUYD | 1.00 | -168.00 | 0.01 | -1.68 | 0.10 | -16.80 | 0.01 | -1.68 | | 0023 | 510-01-00001 | Pavement Patching (9" minimum thickness) | 144 | SQYD | 160.00 | 23,040.00 | 171.60 | 24,710.40 | 185.00 | 26,640.00 | 150.00 | 21,600.00 | | 0024 | 510-02-00100 | Pavement Widening (6" thick) | 866.6 | SQYD | 56.00 | 48,529.60 | 60.00 | 51,996.00 | 65.00 | 56,329.00 | 160.00 | 138,656.00 | | 0025 | 701-05-01085 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 30 | LNFT | 251.00 | 7,530.00 | 375.38 | 11,261.40 | 170.00 | 5,100.00 | 320.00 | 9,600.00 | | 0026 | 701-05-01104 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 40 | LNFT | 410.00 | 16,400.00 | 243.64 | 9,745.60 | 190.00 | 7,600.00 | 220.00 | 8,800.00 | | 0027 | 701-05-02104 | Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 134 | LNFT | 377.00 | 50,518.00 | 277.96 | 37,246.64 | 190.00 | 25,460.00 | 220.00 | 29,480.00 | | 0028 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 134 | LNFT | 23.00 | 3,082.00 | 45.89 | 6,149.26 | 125.00 | 16,750.00 | 1.00 | 134.00 | | 0029 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 6,994.00 | 13,988.00 | 10,757.42 | 21,514.84 | 12,000.00 | 24,000.00 | 15,000.00 | 30,000.00 | | 0030 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,181.3 | LNFT | 29.00 | 34,257.70 | 27.00 | 31,895.10 | 28.00 | 33,076.40 | 25.00 | 29,532.50 | | 0031 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 115.00 | 34,500.00 | 91.16 | 27,348.00 | 90.00 | 27,000.00 | 85.00 | 25,500.00 | | 0032 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 15 | EACH | 3,325.00 | 49,875.00 | 3,378.38 | 50,675.70 | 3,500.00 | 52,500.00 | 3,150.00 | 47,250.00 | | 0033 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 2,950.00 | 2,950.00 | 3,217.50 | 3,217.50 | 3,500.00 | 3,500.00 | 3,000.00 | 3,000.00 | | 0034 | 705-01-00100 | Barbed Wire Fence | 742 | LNFT | 12.00 | 8,904.00 | 13.36 | 9,913.12 | 17.00 | 12,614.00 | 12.50 | 9,275.00 | | 0035 | 708-01-00100 | Right-of-Way Monument | 5 | EACH | 800.00 | 4,000.00 | 858.00 | 4,290.00 | 900.00 | 4,500.00 | 800.00 | 4,000.00 | | 0036 | 708-02-00100 | Right-of-Way Monument Witness Post | 5 | EACH | 200.00 | 1,000.00 | 214.50 | 1,072.50 | 250.00 | 1,250.00 | 200.00 | 1,000.00 | | 0037 | 711-03-00400 | Riprap (55 lb) | 253.2 | TON | 106.00 | 26,839.20 | 112.00 | 28,358.40 | 90.00 | 22,788.00 | 140.00 | 35,448.00 | | 0038 | 711-03-00500 | Riprap (130 lb) | 5,673.7 | TON | 88.00 | 499,285.60 | 87.00 | 493,611.90 | 90.00 | 510,633.00 | 120.00 | 680,844.00 | | 0039 | 711-04-00100 | Geotextile Fabric | 4,309 | SQYD | 4.00 | 17,236.00 | 2.93 | 12,625.37 | 3.00 | 12,927.00 | 3.00 | 12,927.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 71,000.00 | 71,000.00 | 17,927.08 | 17,927.08 | 75,000.00 | 75,000.00 | 125,000.00 | 125,000.00 | | 0041 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 20,000.00 | 40,000.00 | 13,674.38 | 27,348.76 | 20,000.00 | 40,000.00 | 24,700.00 | 49,400.00 | | 0042 | 717-01-00100 | Seeding | 136 | LB | 11.00 | 1,496.00 | 11.75 | 1,598.00 | 30.00 | 4,080.00 | 11.00 | 1,496.00 | | 0043 | 718-01-00100 | Fertilizer | 4,520 | LB | 1.00 | 4,520.00 | 0.83 | 3,751.60 | 1.00 | 4,520.00 | 1.00 | 4,520.00 | | 0044 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 5,431 | SQYD | 1.00 | 5,431.00 | 1.59 | 8,635.29 | 3.00 | 16,293.00 | 2.00 | 10,862.00 | | 0045 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 59 | SQYD | 6.00 | 354.00 | 6.40 | 377.60 | 6.00 | 354.00 | 6.00 | 354.00 | | 0046 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 32,000.00 | 32,000.00 | 32,175.00 | 32,175.00 | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 | | 0047 | 726-01-00100 | Bedding Material | 93.2 | CUYD | 169.00 | 15,750.80 | 120.00 | 11,184.00 | 145.00 | 13,514.00 | 160.00 | 14,912.00 | | 0048 | 727-01-00100 | Mobilization | 1 | LUMP | 575,000.00 | 575,000.00 | 410,349.99 | 410,349.99 | 610,000.00 | 610,000.00 | 708,000.00 | 708,000.00 | | 0049 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 85.00 | 1,360.00 | 80.44 | 1,287.04 | 95.00 | 1,520.00 | 75.00 | 1,200.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 78 | EACH | 25.00 | 1,950.00 | 26.81 | 2,091.18 | 30.00 | 2,340.00 | 25.00 | 1,950.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.161 | MILE | 6,500.00 | 7,546.50 | 6,980.00 | 8,103.78 | 8,000.00 | 9,288.00 | 4,500.00 | 5,224.50 | | 0052 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.356 | MILE | 3,600.00 | 1,281.60 | 3,760.00 | 1,338.56 | 4,000.00 | 1,424.00 | 5,800.00 | 2,064.80 | | 0053 | 735-01-00100 | Mailboxes | 2 | EACH | 25.00 | 50.00 | 80.44 | 160.88 | 100.00 | 200.00 | 75.00 | 150.00 | | 0054 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 275.00 | 550.00 | 160.88 | 321.76 | 300.00 | 600.00 | 150.00 | 300.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 38,000.00 | 38,000.00 | 69,352.97 | 69,352.97 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0056 | 804-01-00300 | Precast Concrete Piles (16") | 6,392 | LNFT | 133.00 | 850,136.00 | 145.26 | 928,501.92 | 147.00 | 939,624.00 | 150.00 | 958,800.00 | | 0057 | 805-01-00100 | Class A1 Concrete (Slab Span) | 458.56 | CUYD | 1,270.00 | 582,371.20 | 1,855.00 | 850,628.80 | 1,500.00 | 687,840.00 | 1,600.00 | 733,696.00 | | 0058 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 114.2 | CUYD | 2,760.00 | 315,192.00 | 4,502.00 | 514,128.40 | 4,000.00 | 456,800.00 | 2,900.00 | 331,180.00 | | 0059 | 805-15-02000 | Reinforced Concrete Box Culverts (Precast) (10' x 7') | 180 | LNFT | 2,130.00 | 383,400.00 | 2,128.71 | 383,167.80 | 2,000.00 | 360,000.00 | 2,800.00 | 504,000.00 | | 0060 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (39.61 CUYD. Concrete, 2,942.08 LBS. Rebar) | 2 | EACH | 70,400.00 | 140,800.00 | 80,806.43 | 161,612.86 | 75,000.00 | 150,000.00 | 80,000.00 | 160,000.00 | | 0061 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 4,355 | SQFT | 3.00 | 13,065.00 | 5.62 | 24,475.10 | 3.50 | 15,242.50 | 1.00 | 4,355.00 | | 0062 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 4,355 | SQFT | 4.00 | 17,420.00 | 4.22 | 18,378.10 | 4.00 | 17,420.00 | 2.00 | 8,710.00 | | 0063 | 806-01-00100 | Deformed Reinforcing Steel | 119,929 | LB | 2.00 | 239,858.00 | 1.22 | 146,313.38 | 2.00 | 239,858.00 | 1.50 | 179,893.50 | | 0064 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 720 | LNFT | 241.00 | 173,520.00 | 238.65 | 171,828.00 | 195.00 | 140,400.00 | 180.00 | 129,600.00 | | 0065 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,680 | SQFT | 140.00 | 235,200.00 | 119.47 | 200,709.60 | 55.00 | 92,400.00 | 120.00 | 201,600.00 | | 0066 | 815-03-00300 | Joint Seal (Poured) | 597 | LNFT | 10.00 | 5,970.00 | 37.87 | 22,608.39 | 15.00 | 8,955.00 | 18.00 | 10,746.00 | | 0067 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,112 | INLF | 3.00 | 6,336.00 | 3.78 | 7,983.36 | 4.00 | 8,448.00 | 1.00 | 2,112.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,733,000.90 | | 5,991,698.69 | | 6,259,675.60 | | 7,087,994.22 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Gilchrist Construction Company, LLC | - 6 - Coastal Contractors, LLC | - 7 - Guinn Construction, LLC | - 8 - Matt L. Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.5 | LUMP | 225,000.00 | 225,000.00 | 250,000.00 | 250,000.00 | 180,000.00 | 180,000.00 | 280,000.00 | 280,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 2,903 | SQYD | 16.00 | 46,448.00 | 21.00 | 60,963.00 | 15.00 | 43,545.00 | 20.00 | 58,060.00 | | 0004 | 202-02-04501 | Removal of Bridge (Str. No. 611908191503481, 97' x 24' Conc. Slab Span Bridge) | 2,328 | LUMP | 155,000.00 | 155,000.00 | 65,000.00 | 65,000.00 | 60,000.00 | 60,000.00 | 80,000.00 | 80,000.00 | | 0005 | 202-02-04501 | Removal of Bridge (Str. No. 611908191506451, 135' x 25' Conc. Slab Span Bridge) | 3,375 | LUMP | 155,000.00 | 155,000.00 | 25,000.00 | 25,000.00 | 60,000.00 | 60,000.00 | 90,000.00 | 90,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (Str. No. 611908191507381, 59' x 24' Conc. Slab Span Bridge) | 1,416 | LUMP | 60,000.00 | 60,000.00 | 90,000.00 | 90,000.00 | 40,000.00 | 40,000.00 | 55,000.00 | 55,000.00 | | 0007 | 202-02-04501 | Removal of Bridge (Str. No. 619058191505321, 39' x 24' Conc. Slab Span Bridge) | 936 | LUMP | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | 15,000.00 | 15,000.00 | 45,000.00 | 45,000.00 | | 0008 | 202-02-12000 | Removal of Fence | 742 | LNFT | 3.00 | 2,226.00 | 3.00 | 2,226.00 | 10.00 | 7,420.00 | 10.00 | 7,420.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 2,475 | LNFT | 7.00 | 17,325.00 | 12.00 | 29,700.00 | 10.00 | 24,750.00 | 12.00 | 29,700.00 | | 0010 | 202-02-32120 | Removal of Pipe (Side Drain) (27" CMP) | 30 | LNFT | 100.00 | 3,000.00 | 40.00 | 1,200.00 | 10.00 | 300.00 | 20.00 | 600.00 | | 0011 | 202-02-32120 | Removal of Pipe (Side Drain) (36" CMP) | 40 | LNFT | 100.00 | 4,000.00 | 40.00 | 1,600.00 | 10.00 | 400.00 | 20.00 | 800.00 | | 0012 | 203-02-00100 | Drainage Excavation | 1,096 | CUYD | 35.00 | 38,360.00 | 55.00 | 60,280.00 | 40.00 | 43,840.00 | 45.00 | 49,320.00 | | 0013 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 260,000.00 | 260,000.00 | 255,000.00 | 255,000.00 | 275,000.00 | 275,000.00 | 180,000.00 | 180,000.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 200.00 | 1,000.00 | 230.00 | 1,150.00 | 500.00 | 2,500.00 | 500.00 | 2,500.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 5,060 | LNFT | 2.50 | 12,650.00 | 2.80 | 14,168.00 | 4.00 | 20,240.00 | 3.00 | 15,180.00 | | 0016 | 302-02-10070 | Class II Base Course (10" Thick) (Asphalt Concrete Base) | 3,590.3 | SQYD | 75.00 | 269,272.50 | 88.00 | 315,946.40 | 150.00 | 538,545.00 | 175.00 | 628,302.50 | | 0017 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 12.8 | CUYD | 600.00 | 7,680.00 | 145.00 | 1,856.00 | 350.00 | 4,480.00 | 250.00 | 3,200.00 | | 0018 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 19.1 | CUYD | 200.00 | 3,820.00 | 145.00 | 2,769.50 | 100.00 | 1,910.00 | 250.00 | 4,775.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 1,189.9 | TON | 275.00 | 327,222.50 | 200.00 | 237,980.00 | 285.00 | 339,121.50 | 260.00 | 309,374.00 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 275.9 | TON | 375.00 | 103,462.50 | 350.00 | 96,565.00 | 325.00 | 89,667.50 | 300.00 | 82,770.00 | | 0021 | 509-01-00100 | Milling Asphalt Pavement | 3,032 | SQYD | 11.00 | 33,352.00 | 12.00 | 36,384.00 | 22.00 | 66,704.00 | 17.00 | 51,544.00 | | 0022 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -168 | CUYD | 1.00 | -168.00 | 0.10 | -16.80 | 0.00 | 0.00 | 1.00 | -168.00 | | 0023 | 510-01-00001 | Pavement Patching (9" minimum thickness) | 144 | SQYD | 260.00 | 37,440.00 | 210.00 | 30,240.00 | 150.00 | 21,600.00 | 220.00 | 31,680.00 | | 0024 | 510-02-00100 | Pavement Widening (6" thick) | 866.6 | SQYD | 100.00 | 86,660.00 | 85.00 | 73,661.00 | 95.00 | 82,327.00 | 225.00 | 194,985.00 | | 0025 | 701-05-01085 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 30 | LNFT | 400.00 | 12,000.00 | 310.00 | 9,300.00 | 350.00 | 10,500.00 | 210.00 | 6,300.00 | | 0026 | 701-05-01104 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 40 | LNFT | 400.00 | 16,000.00 | 275.00 | 11,000.00 | 265.00 | 10,600.00 | 260.00 | 10,400.00 | | 0027 | 701-05-02104 | Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 134 | LNFT | 250.00 | 33,500.00 | 195.00 | 26,130.00 | 265.00 | 35,510.00 | 260.00 | 34,840.00 | | 0028 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 134 | LNFT | 50.00 | 6,700.00 | 15.00 | 2,010.00 | 25.00 | 3,350.00 | 10.00 | 1,340.00 | | 0029 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 10,000.00 | 20,000.00 | 13,000.00 | 26,000.00 | 15,000.00 | 30,000.00 | 5,000.00 | 10,000.00 | | 0030 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,181.3 | LNFT | 30.00 | 35,439.00 | 31.00 | 36,620.30 | 42.00 | 49,614.60 | 60.00 | 70,878.00 | | 0031 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 116.00 | 34,800.00 | 105.00 | 31,500.00 | 150.00 | 45,000.00 | 150.00 | 45,000.00 | | 0032 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 15 | EACH | 3,500.00 | 52,500.00 | 4,000.00 | 60,000.00 | 4,750.00 | 71,250.00 | 5,000.00 | 75,000.00 | | 0033 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 3,000.00 | 3,000.00 | 3,800.00 | 3,800.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | | 0034 | 705-01-00100 | Barbed Wire Fence | 742 | LNFT | 13.00 | 9,646.00 | 15.50 | 11,501.00 | 20.00 | 14,840.00 | 27.00 | 20,034.00 | | 0035 | 708-01-00100 | Right-of-Way Monument | 5 | EACH | 900.00 | 4,500.00 | 950.00 | 4,750.00 | 1,200.00 | 6,000.00 | 750.00 | 3,750.00 | | 0036 | 708-02-00100 | Right-of-Way Monument Witness Post | 5 | EACH | 250.00 | 1,250.00 | 250.00 | 1,250.00 | 400.00 | 2,000.00 | 300.00 | 1,500.00 | | 0037 | 711-03-00400 | Riprap (55 lb) | 253.2 | TON | 115.00 | 29,118.00 | 110.00 | 27,852.00 | 115.00 | 29,118.00 | 130.00 | 32,916.00 | | 0038 | 711-03-00500 | Riprap (130 lb) | 5,673.7 | TON | 104.00 | 590,064.80 | 115.00 | 652,475.50 | 125.00 | 709,212.50 | 170.00 | 964,529.00 | | 0039 | 711-04-00100 | Geotextile Fabric | 4,309 | SQYD | 3.00 | 12,927.00 | 5.50 | 23,699.50 | 5.00 | 21,545.00 | 2.00 | 8,618.00 | | 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 250,000.00 | 250,000.00 | 110,000.00 | 110,000.00 | 80,000.00 | 80,000.00 | 80,000.00 | 80,000.00 | | 0041 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 30,000.00 | 60,000.00 | 22,500.00 | 45,000.00 | 25,000.00 | 50,000.00 | 15,000.00 | 30,000.00 | | 0042 | 717-01-00100 | Seeding | 136 | LB | 12.00 | 1,632.00 | 15.00 | 2,040.00 | 50.00 | 6,800.00 | 50.00 | 6,800.00 | | 0043 | 718-01-00100 | Fertilizer | 4,520 | LB | 0.80 | 3,616.00 | 1.00 | 4,520.00 | 1.00 | 4,520.00 | 2.00 | 9,040.00 | | 0044 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 5,431 | SQYD | 1.50 | 8,146.50 | 1.80 | 9,775.80 | 3.00 | 16,293.00 | 5.00 | 27,155.00 | | 0045 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 59 | SQYD | 6.25 | 368.75 | 7.20 | 424.80 | 15.00 | 885.00 | 6.00 | 354.00 | | 0046 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,500.00 | 15,500.00 | 90,000.00 | 90,000.00 | 35,000.00 | 35,000.00 | 100,000.00 | 100,000.00 | | 0047 | 726-01-00100 | Bedding Material | 93.2 | CUYD | 130.00 | 12,116.00 | 165.00 | 15,378.00 | 250.00 | 23,300.00 | 250.00 | 23,300.00 | | 0048 | 727-01-00100 | Mobilization | 1 | LUMP | 734,000.00 | 734,000.00 | 700,000.00 | 700,000.00 | 750,000.00 | 750,000.00 | 767,795.65 | 767,795.65 | | 0049 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 90.00 | 1,440.00 | 100.00 | 1,600.00 | 150.00 | 2,400.00 | 150.00 | 2,400.00 | | 0050 | 731-02-00100 | Reflectorized Raised Pavement Markers | 78 | EACH | 36.00 | 2,808.00 | 30.00 | 2,340.00 | 50.00 | 3,900.00 | 50.00 | 3,900.00 | | 0051 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.161 | MILE | 19,000.00 | 22,059.00 | 8,000.00 | 9,288.00 | 22,500.00 | 26,122.50 | 25,000.00 | 29,025.00 | | 0052 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.356 | MILE | 6,000.00 | 2,136.00 | 4,200.00 | 1,495.20 | 10,000.00 | 3,560.00 | 8,000.00 | 2,848.00 | | 0053 | 735-01-00100 | Mailboxes | 2 | EACH | 22.00 | 44.00 | 95.00 | 190.00 | 200.00 | 400.00 | 45.00 | 90.00 | | 0054 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 260.00 | 520.00 | 200.00 | 400.00 | 200.00 | 400.00 | 250.00 | 500.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 50,000.00 | 50,000.00 | 120,000.00 | 120,000.00 | | 0056 | 804-01-00300 | Precast Concrete Piles (16") | 6,392 | LNFT | 160.00 | 1,022,720.00 | 150.00 | 958,800.00 | 145.00 | 926,840.00 | 150.00 | 958,800.00 | | 0057 | 805-01-00100 | Class A1 Concrete (Slab Span) | 458.56 | CUYD | 1,500.00 | 687,840.00 | 2,600.00 | 1,192,256.00 | 2,250.00 | 1,031,760.00 | 2,400.00 | 1,100,544.00 | | 0058 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 114.2 | CUYD | 3,100.00 | 354,020.00 | 3,400.00 | 388,280.00 | 3,000.00 | 342,600.00 | 3,000.00 | 342,600.00 | | 0059 | 805-15-02000 | Reinforced Concrete Box Culverts (Precast) (10' x 7') | 180 | LNFT | 1,700.00 | 306,000.00 | 1,775.00 | 319,500.00 | 2,275.00 | 409,500.00 | 2,600.00 | 468,000.00 | | 0060 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall (39.61 CUYD. Concrete, 2,942.08 LBS. Rebar) | 2 | EACH | 75,000.00 | 150,000.00 | 60,000.00 | 120,000.00 | 150,000.00 | 300,000.00 | 35,000.00 | 70,000.00 | | 0061 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 4,355 | SQFT | 3.00 | 13,065.00 | 2.50 | 10,887.50 | 2.00 | 8,710.00 | 6.00 | 26,130.00 | | 0062 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 4,355 | SQFT | 3.00 | 13,065.00 | 3.50 | 15,242.50 | 2.00 | 8,710.00 | 6.00 | 26,130.00 | | 0063 | 806-01-00100 | Deformed Reinforcing Steel | 119,929 | LB | 1.50 | 179,893.50 | 1.35 | 161,904.15 | 1.75 | 209,875.75 | 2.00 | 239,858.00 | | 0064 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 720 | LNFT | 325.00 | 234,000.00 | 225.00 | 162,000.00 | 300.00 | 216,000.00 | 320.00 | 230,400.00 | | 0065 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 1,680 | SQFT | 170.00 | 285,600.00 | 140.00 | 235,200.00 | 115.00 | 193,200.00 | 130.00 | 218,400.00 | | 0066 | 815-03-00300 | Joint Seal (Poured) | 597 | LNFT | 35.00 | 20,895.00 | 35.00 | 20,895.00 | 20.00 | 11,940.00 | 20.00 | 11,940.00 | | 0067 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 2,112 | INLF | 2.00 | 4,224.00 | 2.50 | 5,280.00 | 6.00 | 12,672.00 | 2.00 | 4,224.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,345,904.05 | | 7,392,257.35 | | 7,726,278.35 | | 8,490,381.15 |
|