Proposal:H.014113.6
Parish:St. Tammany
Routes:US 190
Description:US 190: LA 434 - LA 433
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$8,320,703.07
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $3,933,853.61 |
| 2 | 62139 | Huey P. Stockstill, LLC | $4,697,137.20 |
| 3 | 73475 | Madden Gulf Coast, LLC | $4,884,892.21 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $7,680,558.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Huey P. Stockstill, LLC | - 3 - Madden Gulf Coast, LLC | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00020 | Removal of AGGREGATE SHOULDERS | 59,765 | SQYD | 3.25 | 194,236.25 | 2.00 | 119,530.00 | 2.85 | 170,330.25 | 8.00 | 478,120.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 559 | LNFT | 9.00 | 5,031.00 | 10.00 | 5,590.00 | 8.50 | 4,751.50 | 12.00 | 6,708.00 | | 0003 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 500 | SQYD | 1.00 | 500.00 | 50.00 | 25,000.00 | 1.00 | 500.00 | 75.00 | 37,500.00 | | 0004 | 502-01-00100 | Asphalt Concrete | 22,979.8 | TON | 108.00 | 2,481,818.40 | 112.00 | 2,573,737.60 | 108.00 | 2,481,818.40 | 165.00 | 3,791,667.00 | | 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,727.5 | TON | 50.00 | 86,375.00 | 185.00 | 319,587.50 | 180.00 | 310,950.00 | 280.00 | 483,700.00 | | 0006 | 509-01-00100 | Milling Asphalt Pavement | 93,819 | SQYD | 1.00 | 93,819.00 | 2.50 | 234,547.50 | 4.00 | 375,276.00 | 4.00 | 375,276.00 | | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,212 | CUYD | 0.01 | -52.12 | 0.01 | -52.12 | 0.01 | -52.12 | 0.05 | -260.60 | | 0008 | 510-01-00001 | Pavement Patching (13 inch Minimum Thickness) | 4,400 | SQYD | 117.00 | 514,800.00 | 145.00 | 638,000.00 | 78.25 | 344,300.00 | 175.00 | 770,000.00 | | 0009 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 242 | LNFT | 43.00 | 10,406.00 | 80.00 | 19,360.00 | 40.00 | 9,680.00 | 90.00 | 21,780.00 | | 0010 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 337.5 | LNFT | 32.00 | 10,800.00 | 30.00 | 10,125.00 | 29.50 | 9,956.25 | 35.00 | 11,812.50 | | 0011 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 116.50 | 11,650.00 | 135.00 | 13,500.00 | 116.50 | 11,650.00 | 140.00 | 14,000.00 | | 0012 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 2,985.00 | 11,940.00 | 4,500.00 | 18,000.00 | 2,985.00 | 11,940.00 | 4,500.00 | 18,000.00 | | 0013 | 707-04-00100 | Asphalt Curb | 54 | LNFT | 105.00 | 5,670.00 | 115.00 | 6,210.00 | 150.00 | 8,100.00 | 250.00 | 13,500.00 | | 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 237,000.00 | 237,000.00 | 97,000.00 | 97,000.00 | 570,000.00 | 570,000.00 | 700,000.00 | 700,000.00 | | 0015 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 890 | LNFT | 0.35 | 311.50 | 0.50 | 445.00 | 0.35 | 311.50 | 1.00 | 890.00 | | 0016 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 168 | LNFT | 1.00 | 168.00 | 1.50 | 252.00 | 1.00 | 168.00 | 2.00 | 336.00 | | 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.058 | MILE | 1.00 | 0.06 | 165.00 | 9.57 | 350.00 | 20.30 | 4,000.00 | 232.00 | | 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.456 | MILE | 1.00 | 9.46 | 650.00 | 6,146.40 | 600.00 | 5,673.60 | 750.00 | 7,092.00 | | 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 32.78 | MILE | 1.00 | 32.78 | 900.00 | 29,502.00 | 800.00 | 26,224.00 | 1,000.00 | 32,780.00 | | 0020 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 14 | EACH | 35.00 | 490.00 | 45.00 | 630.00 | 35.00 | 490.00 | 45.00 | 630.00 | | 0021 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 8 | EACH | 35.00 | 280.00 | 45.00 | 360.00 | 35.00 | 280.00 | 45.00 | 360.00 | | 0022 | 724-01-00100 | Rumble Strips (Centerline) | 6.39 | MILE | 1,062.00 | 6,786.18 | 750.00 | 4,792.50 | 1,000.00 | 6,390.00 | 350.00 | 2,236.50 | | 0023 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 12.78 | MILE | 650.00 | 8,307.00 | 700.00 | 8,946.00 | 1,000.00 | 12,780.00 | 350.00 | 4,473.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 110,000.00 | 110,000.00 | 405,000.00 | 405,000.00 | 370,000.00 | 370,000.00 | 700,000.00 | 700,000.00 | | 0025 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 81.00 | 162.00 | 100.00 | 200.00 | 75.00 | 150.00 | 200.00 | 400.00 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 10 | EACH | 102.00 | 1,020.00 | 150.00 | 1,500.00 | 85.00 | 850.00 | 200.00 | 2,000.00 | | 0027 | 729-16-00300 | Object Marker Assembly (Type 3) GUARD RAIL | 4 | EACH | 92.00 | 368.00 | 150.00 | 600.00 | 85.00 | 340.00 | 200.00 | 800.00 | | 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 900 | EACH | 5.25 | 4,725.00 | 5.25 | 4,725.00 | 5.00 | 4,500.00 | 6.00 | 5,400.00 | | 0029 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 445 | LNFT | 3.25 | 1,446.25 | 3.25 | 1,446.25 | 3.00 | 1,335.00 | 4.50 | 2,002.50 | | 0030 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 84 | LNFT | 17.00 | 1,428.00 | 20.00 | 1,680.00 | 16.00 | 1,344.00 | 20.00 | 1,680.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.39 | MILE | 4,600.00 | 75,394.00 | 4,500.00 | 73,755.00 | 4,300.00 | 70,477.00 | 6,000.00 | 98,340.00 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.728 | MILE | 1,500.00 | 7,092.00 | 1,500.00 | 7,092.00 | 1,400.00 | 6,619.20 | 1,750.00 | 8,274.00 | | 0033 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.029 | MILE | 9,200.00 | 266.80 | 6,000.00 | 174.00 | 8,500.00 | 246.50 | 10,000.00 | 290.00 | | 0034 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.219 | MILE | 9,200.00 | 2,014.80 | 9,000.00 | 1,971.00 | 8,500.00 | 1,861.50 | 10,000.00 | 2,190.00 | | 0035 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 7 | EACH | 400.00 | 2,800.00 | 425.00 | 2,975.00 | 400.00 | 2,800.00 | 500.00 | 3,500.00 | | 0036 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 400.00 | 1,600.00 | 425.00 | 1,700.00 | 400.00 | 1,600.00 | 500.00 | 2,000.00 | | 0037 | 735-01-00100 | Mailboxes | 100 | EACH | 1.00 | 100.00 | 30.00 | 3,000.00 | 20.00 | 2,000.00 | 35.00 | 3,500.00 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 100 | EACH | 250.00 | 25,000.00 | 150.00 | 15,000.00 | 250.00 | 25,000.00 | 175.00 | 17,500.00 | | 0039 | 736-01-00100 | Trenching and Backfilling LOOP REPAIR | 5 | LNFT | 14.00 | 70.00 | 20.00 | 100.00 | 12.57 | 62.85 | 25.00 | 125.00 | | 0040 | 736-09-00100 | Loop Detector | 75 | LNFT | 50.00 | 3,750.00 | 55.00 | 4,125.00 | 46.52 | 3,489.00 | 75.00 | 5,625.00 | | 0041 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 1,400.00 | 1,400.00 | 2,000.00 | 2,000.00 | 1,329.63 | 1,329.63 | 2,000.00 | 2,000.00 | | 0042 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 5 | LNFT | 10.00 | 50.00 | 10.00 | 50.00 | 9.47 | 47.35 | 20.00 | 100.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,750.00 | 4,750.00 | 15,000.00 | 15,000.00 | 14,750.00 | 14,750.00 | 25,000.00 | 25,000.00 | | 0044 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 400 | LNFT | 9.25 | 3,700.00 | 3.00 | 1,200.00 | 2.35 | 940.00 | 15.00 | 6,000.00 | | 0045 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 750 | LNFT | 1.25 | 937.50 | 2.50 | 1,875.00 | 1.95 | 1,462.50 | 2.50 | 1,875.00 | | 0046 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 75 | INLF | 0.01 | 0.75 | 10.00 | 750.00 | 2.00 | 150.00 | 15.00 | 1,125.00 | | 0047 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 2,700.00 | 5,400.00 | 10,000.00 | 20,000.00 | 6,000.00 | 12,000.00 | 10,000.00 | 20,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,933,853.61 | | 4,697,137.20 | | 4,884,892.21 | | 7,680,558.90 |
|