Proposal:H.013722.6
Parish:St. Mary
Description:MORGAN CITY SIDEWALKS: DOWNTOWN & MYRTLE
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CONCRETE WALKS AND RAMPS, SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$1,743,350.40
| Rank | License | Bidder | Construction Bid |
| 1 | 68237 | GULF STATES SERVICES, LLC | $1,661,903.70 |
| 2 | 34263 | LA Contracting Enterprise, L.L.C. | $1,823,830.00 |
| 3 | 54206 | Southern Constructors, LLC | $2,956,190.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - GULF STATES SERVICES, LLC | - 2 - LA Contracting Enterprise, L.L.C. | - 3 - Southern Constructors, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 2 | LUMP | 15,000.00 | 15,000.00 | 6,000.00 | 6,000.00 | 30,000.00 | 30,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 35,000.00 | 35,000.00 | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 27.6 | SQYD | 30.00 | 828.00 | 44.00 | 1,214.40 | 150.00 | 4,140.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 2,079 | SQYD | 32.00 | 66,528.00 | 26.00 | 54,054.00 | 30.00 | 62,370.00 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 649 | LNFT | 20.00 | 12,980.00 | 14.00 | 9,086.00 | 30.00 | 19,470.00 | | 0006 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 42.2 | SQYD | 30.00 | 1,266.00 | 36.50 | 1,540.30 | 95.00 | 4,009.00 | | 0007 | 202-02-38220 | Removal of Sign Supports | 5 | EACH | 250.00 | 1,250.00 | 175.00 | 875.00 | 50.00 | 250.00 | | 0008 | 202-03-38000 | Relocation of Sign | 5 | EACH | 250.00 | 1,250.00 | 175.00 | 875.00 | 750.00 | 3,750.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 37,500.00 | 37,500.00 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 392 | EACH | 1.00 | 392.00 | 25.00 | 9,800.00 | 75.00 | 29,400.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 1,784 | LNFT | 0.50 | 892.00 | 2.00 | 3,568.00 | 3.00 | 5,352.00 | | 0012 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 1,416 | LNFT | 100.00 | 141,600.00 | 128.00 | 181,248.00 | 160.00 | 226,560.00 | | 0013 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 179 | LNFT | 120.00 | 21,480.00 | 150.00 | 26,850.00 | 170.00 | 30,430.00 | | 0014 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 40 | LNFT | 235.00 | 9,400.00 | 216.00 | 8,640.00 | 200.00 | 8,000.00 | | 0015 | 701-05-01045 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW) | 16 | LNFT | 250.00 | 4,000.00 | 158.00 | 2,528.00 | 145.00 | 2,320.00 | | 0016 | 701-07-00300 | Yard Drain Pipe (8") | 24 | LNFT | 65.00 | 1,560.00 | 65.00 | 1,560.00 | 65.00 | 1,560.00 | | 0017 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 11 | LNFT | 250.00 | 2,750.00 | 183.00 | 2,013.00 | 120.00 | 1,320.00 | | 0018 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 5 | LNFT | 250.00 | 1,250.00 | 268.00 | 1,340.00 | 350.00 | 1,750.00 | | 0019 | 701-15-00100 | Concrete Collar | 6 | EACH | 3,000.00 | 18,000.00 | 1,650.00 | 9,900.00 | 1,500.00 | 9,000.00 | | 0020 | 702-02-00100 | Manholes (MH-06) | 17 | EACH | 5,200.00 | 88,400.00 | 6,750.00 | 114,750.00 | 7,500.00 | 127,500.00 | | 0021 | 702-03-00100 | Catch Basins (CB-01) | 15 | EACH | 7,500.00 | 112,500.00 | 6,500.00 | 97,500.00 | 7,500.00 | 112,500.00 | | 0022 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 3,500.00 | 3,500.00 | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | | 0023 | 702-04-00200 | Adjusting Catch Basins | 4 | EACH | 3,500.00 | 14,000.00 | 3,200.00 | 12,800.00 | 5,000.00 | 20,000.00 | | 0024 | 702-04-00300 | Adjusting Junction Boxes | 2 | EACH | 4,500.00 | 9,000.00 | 2,600.00 | 5,200.00 | 5,000.00 | 10,000.00 | | 0025 | 706-01-00100 | Concrete Walk (4" Thick) | 1,825.2 | SQYD | 62.00 | 113,162.40 | 71.50 | 130,501.80 | 150.00 | 273,780.00 | | 0026 | 706-01-00300 | Concrete Walk (6" Thick) | 63.9 | SQYD | 78.00 | 4,984.20 | 100.50 | 6,421.95 | 230.00 | 14,697.00 | | 0027 | 706-02-00200 | Concrete Drive (6" Thick) | 548.7 | SQYD | 78.00 | 42,798.60 | 107.00 | 58,710.90 | 145.00 | 79,561.50 | | 0028 | 706-02-00300 | Concrete Drive (8" Thick) | 552.1 | SQYD | 88.00 | 48,584.80 | 126.00 | 69,564.60 | 170.00 | 93,857.00 | | 0029 | 706-04-00110 | Curb Ramps Type 1 | 38.4 | SQYD | 155.00 | 5,952.00 | 250.00 | 9,600.00 | 600.00 | 23,040.00 | | 0030 | 706-04-00110 | Curb Ramps Type 3 | 8.1 | SQYD | 155.00 | 1,255.50 | 250.00 | 2,025.00 | 800.00 | 6,480.00 | | 0031 | 706-04-00110 | Curb Ramps Type 5 | 38.2 | SQYD | 155.00 | 5,921.00 | 250.00 | 9,550.00 | 600.00 | 22,920.00 | | 0032 | 706-04-00110 | Curb Ramps Type 7 | 1,055.2 | SQYD | 155.00 | 163,556.00 | 250.00 | 263,800.00 | 300.00 | 316,560.00 | | 0033 | 707-01-00100 | Concrete Curb | 377 | LNFT | 30.00 | 11,310.00 | 45.00 | 16,965.00 | 55.00 | 20,735.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 50,000.00 | 50,000.00 | 150,000.00 | 150,000.00 | | 0035 | 714-01-00700 | Slab Sodding (Centipede) | 1,367 | SQYD | 8.00 | 10,936.00 | 14.00 | 19,138.00 | 20.00 | 27,340.00 | | 0036 | 726-01-00100 | Bedding Material | 330.2 | CUYD | 1.00 | 330.20 | 156.00 | 51,511.20 | 150.00 | 49,530.00 | | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 235,000.00 | 235,000.00 | 122,000.00 | 122,000.00 | 225,000.00 | 225,000.00 | | 0038 | 729-01-00100 | Sign (Type A) | 32.5 | SQFT | 155.00 | 5,037.50 | 110.00 | 3,575.00 | 200.00 | 6,500.00 | | 0039 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 5 | EACH | 250.00 | 1,250.00 | 285.00 | 1,425.00 | 750.00 | 3,750.00 | | 0040 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 436 | LNFT | 4.50 | 1,962.00 | 4.50 | 1,962.00 | 10.00 | 4,360.00 | | 0041 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 138 | LNFT | 22.00 | 3,036.00 | 22.50 | 3,105.00 | 35.00 | 4,830.00 | | 0042 | 732-05-00100 | Removal of Existing Markings | 0.087 | MILE | 10,500.00 | 913.50 | 11,300.00 | 983.10 | 40,000.00 | 3,480.00 | | 0043 | 736-01-00100 | Trenching and Backfilling | 200 | LNFT | 13.00 | 2,600.00 | 13.00 | 2,600.00 | 100.00 | 20,000.00 | | 0044 | 736-03-00100 | Jacking or Boring | 350 | LNFT | 32.00 | 11,200.00 | 21.00 | 7,350.00 | 100.00 | 35,000.00 | | 0045 | 736-04-00001 | Signal Pole (Pedestal Pole) | 5 | EACH | 1,200.00 | 6,000.00 | 1,550.00 | 7,750.00 | 15,000.00 | 75,000.00 | | 0046 | 736-10-00300 | Underground Junction Box (Type F) | 4 | EACH | 1,400.00 | 5,600.00 | 1,350.00 | 5,400.00 | 7,500.00 | 30,000.00 | | 0047 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 2,900.00 | 2,900.00 | 1,950.00 | 1,950.00 | 7,500.00 | 7,500.00 | | 0048 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 600 | LNFT | 10.00 | 6,000.00 | 17.00 | 10,200.00 | 30.00 | 18,000.00 | | 0049 | 736-12-02014 | Conductor (2c, #14 awg) | 1,350 | LNFT | 3.80 | 5,130.00 | 2.25 | 3,037.50 | 30.00 | 40,500.00 | | 0050 | 736-12-06014 | Conductor (6c, #14 awg) | 1,350 | LNFT | 6.00 | 8,100.00 | 4.00 | 5,400.00 | 30.00 | 40,500.00 | | 0051 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 5 | EACH | 1,800.00 | 9,000.00 | 1,475.00 | 7,375.00 | 7,500.00 | 37,500.00 | | 0052 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 8 | EACH | 1,200.00 | 9,600.00 | 1,000.00 | 8,000.00 | 8,000.00 | 64,000.00 | | 0053 | 739-01-00100 | Hydro-Seeding | 0.44 | ACRE | 6,900.00 | 3,036.00 | 3,000.00 | 1,320.00 | 5,000.00 | 2,200.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 12,000.00 | 12,000.00 | 50,000.00 | 50,000.00 | | 0055 | 741-35-00100 | Adjust Valve or Meter Box | 8 | EACH | 350.00 | 2,800.00 | 700.00 | 5,600.00 | 1,500.00 | 12,000.00 | | 0056 | 805-01-00600 | Class A1 Concrete (Retaining Wall) | 48.9 | CUYD | 1,750.00 | 85,575.00 | 1,750.00 | 85,575.00 | 3,250.00 | 158,925.00 | | 0057 | 806-01-00100 | Deformed Reinforcing Steel | 3,741 | LB | 2.00 | 7,482.00 | 3.00 | 11,223.00 | 4.00 | 14,964.00 | | 0058 | 810-02-00100 | Metal Bridge Railing | 216 | LNFT | 380.00 | 82,080.00 | 524.00 | 113,184.00 | 350.00 | 75,600.00 | | 0059 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,020 | INLF | 5.00 | 5,100.00 | 1.00 | 1,020.00 | 10.00 | 10,200.00 | | 0060 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,248 | INLF | 5.00 | 6,240.00 | 1.50 | 1,872.00 | 10.00 | 12,480.00 | | 0061 | NS-719-00002 | Tree Trimming | 1 | LUMP | 2,000.00 | 2,000.00 | 2,800.75 | 2,800.75 | 15,000.00 | 15,000.00 | | 0062 | NS-719-00005 | Gravel Bed and Filter Cloth over Tree Roots | 11.1 | SQYD | 150.00 | 1,665.00 | 200.00 | 2,220.00 | 200.00 | 2,220.00 | | 0063 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 8 | EACH | 1,250.00 | 10,000.00 | 1,400.00 | 11,200.00 | 5,000.00 | 40,000.00 | | 0064 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 1 | EACH | 5,200.00 | 5,200.00 | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | | 0065 | TS-800-00300 | Handrail | 70 | LNFT | 350.00 | 24,500.00 | 267.75 | 18,742.50 | 300.00 | 21,000.00 | | 0066 | TS-MSC-00280 | Adjusting Gas Valves And Boxes | 2 | EACH | 550.00 | 1,100.00 | 575.00 | 1,150.00 | 5,000.00 | 10,000.00 | | 0067 | 703-03-00100 | Perforated Pipe Underdrains | 240 | LNFT | 32.00 | 7,680.00 | 32.00 | 7,680.00 | 150.00 | 36,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,661,903.70 | | 1,823,830.00 | | 2,956,190.50 |
|