Proposal:H.012939.6
Parish:De Soto
Routes:LA 3015
Description:LA 3015: US 171 TO LA 175
Type Construction:BORROW, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,929,314.92
| Rank | License | Bidder | Construction Bid |
| 1 | 67822 | Earnest Contracting LLC | $2,605,811.40 |
| 2 | 17464 | Benton & Brown, LLC. | $2,794,582.48 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Earnest Contracting LLC | - 2 - Benton & Brown, LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions 24" RCP ,30" RCP ,36" CMP ,48" CMP | 1 | LUMP | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,216 | CUYD | 30.00 | 66,480.00 | 35.00 | 77,560.00 | | 0003 | 204-02-00100 | Temporary Hay Bales | 85 | EACH | 10.00 | 850.00 | 27.50 | 2,337.50 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 1,250 | LNFT | 8.00 | 10,000.00 | 5.00 | 6,250.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 5 | CUYD | 125.00 | 625.00 | 330.00 | 1,650.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 9,286.5 | TON | 165.85 | 1,540,166.03 | 165.00 | 1,532,272.50 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 377.3 | TON | 166.25 | 62,726.13 | 425.00 | 160,352.50 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 1,719.4 | SQYD | 25.00 | 42,985.00 | 25.00 | 42,985.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -47.1 | CUYD | 0.10 | -4.71 | 0.01 | -0.47 | | 0010 | 510-01-00104 | Pavement Patching (10" Minimum Thickness) | 796 | SQYD | 110.00 | 87,560.00 | 160.00 | 127,360.00 | | 0011 | 701-01-01007 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) | 61 | LNFT | 150.00 | 9,150.00 | 182.00 | 11,102.00 | | 0012 | 701-01-01026 | Cross Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 129 | LNFT | 230.00 | 29,670.00 | 220.00 | 28,380.00 | | 0013 | 701-01-01045 | Cross Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 45 | LNFT | 310.00 | 13,950.00 | 247.50 | 11,137.50 | | 0014 | 701-01-01085 | Cross Drain Pipe (48" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 60 | LNFT | 555.00 | 33,300.00 | 550.00 | 33,000.00 | | 0015 | 701-14-00100 | Cleaning Existing Pipes (24") | 50 | LNFT | 150.00 | 7,500.00 | 55.00 | 2,750.00 | | 0016 | 701-15-00100 | Concrete Collar | 2 | EACH | 750.00 | 1,500.00 | 3,850.00 | 7,700.00 | | 0017 | 702-07-00100 | Cross Drain Safety End (Type 1) | 12 | EACH | 4,800.00 | 57,600.00 | 8,250.00 | 99,000.00 | | 0018 | 702-07-00200 | Cross Drain Safety End (Type 2) | 2 | EACH | 7,200.00 | 14,400.00 | 11,000.00 | 22,000.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 65,000.00 | 65,000.00 | 50,000.00 | 50,000.00 | | 0020 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 62 | LNFT | 1.00 | 62.00 | 1.10 | 68.20 | | 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.799 | MILE | 550.00 | 3,739.45 | 1,000.00 | 6,799.00 | | 0022 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.463 | MILE | 500.00 | 231.50 | 550.00 | 254.65 | | 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 26.587 | MILE | 1,500.00 | 39,880.50 | 1,650.00 | 43,868.55 | | 0024 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 1 | EACH | 50.00 | 50.00 | 55.00 | 55.00 | | 0025 | 716-01-00100 | Mulch (Vegetative) | 33 | TON | 1,500.00 | 49,500.00 | 1,100.00 | 36,300.00 | | 0026 | 717-01-00100 | Seeding | 743 | LB | 24.00 | 17,832.00 | 22.00 | 16,346.00 | | 0027 | 718-01-00100 | Fertilizer | 16,500 | LB | 1.15 | 18,975.00 | 1.10 | 18,150.00 | | 0028 | 724-01-00100 | Rumble Strips (Centerline) | 6.799 | MILE | 3,000.00 | 20,397.00 | 3,300.00 | 22,436.70 | | 0029 | 726-01-00100 | Bedding Material | 68.6 | CUYD | 100.00 | 6,860.00 | 275.00 | 18,865.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 105,000.00 | 105,000.00 | | 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | 16 | EACH | 125.00 | 2,000.00 | 82.50 | 1,320.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,737 | EACH | 9.00 | 15,633.00 | 10.00 | 17,370.00 | | 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 62 | LNFT | 50.00 | 3,100.00 | 55.00 | 3,410.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 26.587 | MILE | 6,500.00 | 172,815.50 | 7,150.00 | 190,097.05 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.463 | MILE | 10,000.00 | 4,630.00 | 11,000.00 | 5,093.00 | | 0036 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 3,000.00 | 3,000.00 | 3,300.00 | 3,300.00 | | 0037 | 732-05-00100 | Removal of Existing Markings | 0.04 | MILE | 50,000.00 | 2,000.00 | 55,000.00 | 2,200.00 | | 0038 | 735-01-00100 | Mailboxes | 48 | EACH | 1.00 | 48.00 | 1.10 | 52.80 | | 0039 | 735-02-00100 | Mailbox Supports (Single) | 44 | EACH | 250.00 | 11,000.00 | 275.00 | 12,100.00 | | 0040 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 300.00 | 600.00 | 330.00 | 660.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,605,811.40 | | 2,794,582.48 |
|