Proposal:H.012914.6
Parish:Lafayette
Routes:LA 3073
Description:LA 3073: AMBASSADOR @ VEROT-CHEMIN-BONIN
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, PORTLAND CEMENT CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION, RADAR VEHICLE DETECTION SYSTEM, AND RELATED WORK.
Estimated Construction Cost:$3,295,426.84
| Rank | License | Bidder | Construction Bid |
| 1 | 52306 | SIEMA CONSTRUCTION, LLC | $2,562,835.78 |
| 2 | 30774 | Progressive Construction Co., LLC | $2,693,608.91 |
| 3 | 55505 | MERRICK, LLC | $3,416,435.05 |
| 4 | 33663 | Glenn Lege Construction LLC | $4,125,746.82 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SIEMA CONSTRUCTION, LLC | - 2 - Progressive Construction Co., LLC | - 3 - MERRICK, LLC | - 4 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 3,330.00 | 3,330.00 | 45,000.00 | 45,000.00 | 5,000.00 | 5,000.00 | 136,350.00 | 136,350.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 38,300.00 | 38,300.00 | 25,211.00 | 25,211.00 | 50,000.00 | 50,000.00 | 33,178.50 | 33,178.50 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,787.8 | SQYD | 13.00 | 23,241.40 | 13.00 | 23,241.40 | 20.00 | 35,756.00 | 66.36 | 118,638.41 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 189 | SQYD | 19.75 | 3,732.75 | 31.00 | 5,859.00 | 18.00 | 3,402.00 | 34.09 | 6,443.01 | | 0005 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 9,300.00 | 9,300.00 | 9,756.00 | 9,756.00 | 35,000.00 | 35,000.00 | 21,838.37 | 21,838.37 | | 0006 | 202-03-38000 | Relocation of Sign | 8 | EACH | 100.00 | 800.00 | 399.00 | 3,192.00 | 800.00 | 6,400.00 | 757.50 | 6,060.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 73,825.00 | 73,825.00 | 91,368.00 | 91,368.00 | 125,000.00 | 125,000.00 | 304,515.00 | 304,515.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 108 | EACH | 68.00 | 7,344.00 | 41.00 | 4,428.00 | 25.00 | 2,700.00 | 33.94 | 3,665.52 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 4,500 | LNFT | 4.30 | 19,350.00 | 6.00 | 27,000.00 | 4.00 | 18,000.00 | 2.36 | 10,620.00 | | 0010 | 302-02-08080 | Class II Base Course (8" Thick) (Asphalt Concrete Base) | 4,980.7 | SQYD | 102.00 | 508,031.40 | 74.00 | 368,571.80 | 95.00 | 473,166.50 | 116.11 | 578,309.08 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 98.00 | 19,600.00 | 100.00 | 20,000.00 | 130.00 | 26,000.00 | 92.04 | 18,408.00 | | 0012 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 4,552.9 | SQYD | 128.00 | 582,771.20 | 105.00 | 478,054.50 | 150.00 | 682,935.00 | 131.61 | 599,207.17 | | 0013 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 3,595 | LNFT | 5.00 | 17,975.00 | 4.00 | 14,380.00 | 5.00 | 17,975.00 | 4.80 | 17,256.00 | | 0014 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 1,991 | LNFT | 5.00 | 9,955.00 | 4.00 | 7,964.00 | 5.00 | 9,955.00 | 4.80 | 9,556.80 | | 0015 | 602-03-00100 | Cleaning and Sealing Random Cracks | 1,397 | LNFT | 6.00 | 8,382.00 | 6.00 | 8,382.00 | 5.00 | 6,985.00 | 6.38 | 8,912.86 | | 0016 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 59 | LNFT | 332.00 | 19,588.00 | 162.00 | 9,558.00 | 230.00 | 13,570.00 | 328.65 | 19,390.35 | | 0017 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 131 | LNFT | 172.00 | 22,532.00 | 173.00 | 22,663.00 | 240.00 | 31,440.00 | 401.99 | 52,660.69 | | 0018 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 133 | LNFT | 265.00 | 35,245.00 | 187.00 | 24,871.00 | 350.00 | 46,550.00 | 467.83 | 62,221.39 | | 0019 | 701-04-01140 | Storm Drain Pipe Arch (54" Equiv. RCPA) | 121 | LNFT | 435.00 | 52,635.00 | 384.00 | 46,464.00 | 700.00 | 84,700.00 | 717.50 | 86,817.50 | | 0020 | 702-02-00100 | Manholes (MH-06) | 2 | EACH | 17,000.00 | 34,000.00 | 6,909.00 | 13,818.00 | 7,500.00 | 15,000.00 | 10,605.00 | 21,210.00 | | 0021 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 5,600.00 | 5,600.00 | 6,443.00 | 6,443.00 | 6,000.00 | 6,000.00 | 7,476.53 | 7,476.53 | | 0022 | 702-03-00500 | Catch Basins (CB-06) | 4 | EACH | 8,775.00 | 35,100.00 | 7,469.00 | 29,876.00 | 13,000.00 | 52,000.00 | 9,620.25 | 38,481.00 | | 0023 | 702-03-00700 | Catch Basins (CB-08) | 2 | EACH | 11,500.00 | 23,000.00 | 14,247.00 | 28,494.00 | 20,000.00 | 40,000.00 | 15,945.38 | 31,890.76 | | 0024 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 3,000.00 | 3,000.00 | 6,581.00 | 6,581.00 | 4,000.00 | 4,000.00 | 4,166.25 | 4,166.25 | | 0025 | 702-04-00210 | Convert Catch Basins to Manholes | 1 | EACH | 6,700.00 | 6,700.00 | 6,525.00 | 6,525.00 | 5,000.00 | 5,000.00 | 5,681.25 | 5,681.25 | | 0026 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 278.8 | LNFT | 35.00 | 9,758.00 | 42.00 | 11,709.60 | 40.00 | 11,152.00 | 37.57 | 10,474.52 | | 0027 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 10 | LNFT | 200.00 | 2,000.00 | 179.00 | 1,790.00 | 230.00 | 2,300.00 | 212.10 | 2,121.00 | | 0028 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 1 | EACH | 4,000.00 | 4,000.00 | 4,703.00 | 4,703.00 | 4,500.00 | 4,500.00 | 4,242.00 | 4,242.00 | | 0029 | 706-01-00100 | Concrete Walk (4" Thick) | 229.3 | SQYD | 84.00 | 19,261.20 | 99.00 | 22,700.70 | 130.00 | 29,809.00 | 101.51 | 23,276.24 | | 0030 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 92.3 | SQYD | 145.00 | 13,383.50 | 141.00 | 13,014.30 | 150.00 | 13,845.00 | 78.86 | 7,278.78 | | 0031 | 706-04-00110 | Curb Ramps (TYPE 3) | 15.3 | SQYD | 175.00 | 2,677.50 | 349.00 | 5,339.70 | 400.00 | 6,120.00 | 1,331.26 | 20,368.28 | | 0032 | 706-04-00110 | Curb Ramps (TYPE 4) | 15.6 | SQYD | 161.00 | 2,511.60 | 344.00 | 5,366.40 | 400.00 | 6,240.00 | 1,331.26 | 20,767.66 | | 0033 | 707-01-00100 | Concrete Curb | 4,224.9 | LNFT | 8.50 | 35,911.65 | 12.00 | 50,698.80 | 30.00 | 126,747.00 | 61.35 | 259,197.62 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 88,000.00 | 88,000.00 | 48,000.00 | 48,000.00 | 175,000.00 | 175,000.00 | 101,505.00 | 101,505.00 | | 0035 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 11,632 | LNFT | 0.30 | 3,489.60 | 0.30 | 3,489.60 | 0.30 | 3,489.60 | 0.35 | 4,071.20 | | 0036 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,424 | LNFT | 0.17 | 582.08 | 0.20 | 684.80 | 0.20 | 684.80 | 0.46 | 1,575.04 | | 0037 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 489 | LNFT | 0.40 | 195.60 | 0.50 | 244.50 | 0.40 | 195.60 | 1.21 | 591.69 | | 0038 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.076 | MILE | 1,450.00 | 1,560.20 | 1,489.00 | 1,602.16 | 1,600.00 | 1,721.60 | 909.00 | 978.08 | | 0039 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 141 | EACH | 303.00 | 42,723.00 | 2,500.00 | 352,500.00 | 1,800.00 | 253,800.00 | 909.00 | 128,169.00 | | 0040 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 679 | SQYD | 12.50 | 8,487.50 | 12.00 | 8,148.00 | 30.00 | 20,370.00 | 13.11 | 8,901.69 | | 0041 | 726-01-00100 | Bedding Material | 177.9 | CUYD | 155.00 | 27,574.50 | 150.00 | 26,685.00 | 190.00 | 33,801.00 | 113.63 | 20,214.78 | | 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 230,000.00 | 230,000.00 | 270,000.00 | 270,000.00 | 330,000.00 | 330,000.00 | 434,229.26 | 434,229.26 | | 0043 | 729-01-00100 | Sign (Type A) | 95.75 | SQFT | 40.00 | 3,830.00 | 48.00 | 4,596.00 | 85.00 | 8,138.75 | 42.42 | 4,061.72 | | 0044 | 731-02-00100 | Reflectorized Raised Pavement Markers | 324 | EACH | 6.00 | 1,944.00 | 6.00 | 1,944.00 | 7.00 | 2,268.00 | 8.48 | 2,747.52 | | 0045 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 11,632 | LNFT | 1.50 | 17,448.00 | 1.60 | 18,611.20 | 1.50 | 17,448.00 | 1.52 | 17,680.64 | | 0046 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,424 | LNFT | 3.50 | 11,984.00 | 6.00 | 20,544.00 | 4.00 | 13,696.00 | 3.64 | 12,463.36 | | 0047 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 719 | LNFT | 17.00 | 12,223.00 | 18.00 | 12,942.00 | 19.00 | 13,661.00 | 20.00 | 14,380.00 | | 0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.076 | MILE | 2,900.00 | 3,120.40 | 2,977.00 | 3,203.25 | 3,200.00 | 3,443.20 | 4,242.00 | 4,564.39 | | 0049 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.541 | MILE | 11,300.00 | 6,113.30 | 11,905.00 | 6,440.61 | 12,000.00 | 6,492.00 | 12,501.78 | 6,763.46 | | 0050 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 4 | EACH | 340.00 | 1,360.00 | 358.00 | 1,432.00 | 350.00 | 1,400.00 | 363.60 | 1,454.40 | | 0051 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 13 | EACH | 340.00 | 4,420.00 | 358.00 | 4,654.00 | 350.00 | 4,550.00 | 363.60 | 4,726.80 | | 0052 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 16 | EACH | 340.00 | 5,440.00 | 358.00 | 5,728.00 | 350.00 | 5,600.00 | 363.60 | 5,817.60 | | 0053 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 510.00 | 2,040.00 | 536.00 | 2,144.00 | 500.00 | 2,000.00 | 363.60 | 1,454.40 | | 0054 | 732-05-00100 | Removal of Existing Markings | 4.601 | MILE | 3,400.00 | 15,643.40 | 3,572.00 | 16,434.77 | 3,500.00 | 16,103.50 | 10,302.00 | 47,399.50 | | 0055 | 736-01-00100 | Trenching and Backfilling | 160 | LNFT | 13.00 | 2,080.00 | 13.00 | 2,080.00 | 30.00 | 4,800.00 | 18.20 | 2,912.00 | | 0056 | 736-03-00100 | Jacking or Boring | 350 | LNFT | 27.50 | 9,625.00 | 28.00 | 9,800.00 | 30.00 | 10,500.00 | 43.62 | 15,267.00 | | 0057 | 736-04-01300 | Signal Pole (30 foot Steel Strain Pole) | 1 | EACH | 22,500.00 | 22,500.00 | 22,097.00 | 22,097.00 | 17,000.00 | 17,000.00 | 16,820.32 | 16,820.32 | | 0058 | 736-04-10350 | Signal Pole (Single Mast Arm, 35ft) | 2 | EACH | 18,500.00 | 37,000.00 | 18,122.00 | 36,244.00 | 20,000.00 | 40,000.00 | 22,958.63 | 45,917.26 | | 0059 | 736-04-10400 | Signal Pole (Single Mast Arm, 40ft) | 1 | EACH | 20,000.00 | 20,000.00 | 19,788.00 | 19,788.00 | 22,000.00 | 22,000.00 | 24,722.56 | 24,722.56 | | 0060 | 736-04-10450 | Signal Pole (Single Mast Arm, 45ft) | 1 | EACH | 21,500.00 | 21,500.00 | 21,100.00 | 21,100.00 | 25,000.00 | 25,000.00 | 26,247.82 | 26,247.82 | | 0061 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 12 | EACH | 1,135.00 | 13,620.00 | 1,117.00 | 13,404.00 | 1,400.00 | 16,800.00 | 1,480.02 | 17,760.24 | | 0062 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 6 | EACH | 1,160.00 | 6,960.00 | 1,139.00 | 6,834.00 | 1,400.00 | 8,400.00 | 1,480.02 | 8,880.12 | | 0063 | 736-05-35000 | Signal Heads (3 Section, 12 inch Led Lens, R, RT. Y, RT. G) | 2 | EACH | 1,245.00 | 2,490.00 | 1,195.00 | 2,390.00 | 1,400.00 | 2,800.00 | 1,480.02 | 2,960.04 | | 0064 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 2 | EACH | 1,475.00 | 2,950.00 | 1,454.00 | 2,908.00 | 1,400.00 | 2,800.00 | 1,798.87 | 3,597.74 | | 0065 | 736-05-55000 | Signal Heads (5 Section, 12 inch Led Lens, R, Y, RT. Y, G, RT. G) | 5 | EACH | 1,675.00 | 8,375.00 | 1,654.00 | 8,270.00 | 1,400.00 | 7,000.00 | 1,966.69 | 9,833.45 | | 0066 | 736-06-00200 | Signal Service (Existing Pole) | 1 | EACH | 3,500.00 | 3,500.00 | 3,387.00 | 3,387.00 | 9,000.00 | 9,000.00 | 2,667.89 | 2,667.89 | | 0067 | 736-06-00500 | Signal Service Pedestal Disconnect | 1 | EACH | 2,610.00 | 2,610.00 | 2,570.00 | 2,570.00 | 3,500.00 | 3,500.00 | 4,156.41 | 4,156.41 | | 0068 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 1 | EACH | 6,910.00 | 6,910.00 | 6,815.00 | 6,815.00 | 8,000.00 | 8,000.00 | 6,244.67 | 6,244.67 | | 0069 | 736-10-00300 | Underground Junction Box (Type F) | 4 | EACH | 1,225.00 | 4,900.00 | 1,209.00 | 4,836.00 | 2,000.00 | 8,000.00 | 1,781.46 | 7,125.84 | | 0070 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 1,825.00 | 1,825.00 | 1,799.00 | 1,799.00 | 3,000.00 | 3,000.00 | 2,775.44 | 2,775.44 | | 0071 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 110 | LNFT | 8.10 | 891.00 | 8.00 | 880.00 | 8.00 | 880.00 | 9.01 | 991.10 | | 0072 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 460 | LNFT | 10.50 | 4,830.00 | 11.00 | 5,060.00 | 17.00 | 7,820.00 | 11.15 | 5,129.00 | | 0073 | 736-12-02014 | Conductor (2c, #14 awg) | 331 | LNFT | 5.50 | 1,820.50 | 6.00 | 1,986.00 | 4.50 | 1,489.50 | 5.19 | 1,717.89 | | 0074 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 110 | LNFT | 10.30 | 1,133.00 | 11.00 | 1,210.00 | 15.00 | 1,650.00 | 11.88 | 1,306.80 | | 0075 | 736-12-06014 | Conductor (6c, #14 awg) | 729 | LNFT | 7.00 | 5,103.00 | 7.00 | 5,103.00 | 6.00 | 4,374.00 | 6.65 | 4,847.85 | | 0076 | 736-12-10014 | Conductor (10c, #14 awg) | 4,015 | LNFT | 7.50 | 30,112.50 | 8.00 | 32,120.00 | 8.00 | 32,120.00 | 8.34 | 33,485.10 | | 0077 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 5 | EACH | 8,700.00 | 43,500.00 | 8,514.00 | 42,570.00 | 7,000.00 | 35,000.00 | 7,461.63 | 37,308.15 | | 0078 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 2 | EACH | 980.00 | 1,960.00 | 948.00 | 1,896.00 | 1,300.00 | 2,600.00 | 1,196.60 | 2,393.20 | | 0079 | 736-22-00000 | Pedestrian Push Button | 1 | EACH | 375.00 | 375.00 | 367.00 | 367.00 | 900.00 | 900.00 | 658.50 | 658.50 | | 0080 | 736-25-00002 | Support Cable (Span) (3/8 inch) | 290 | LNFT | 22.50 | 6,525.00 | 23.00 | 6,670.00 | 35.00 | 10,150.00 | 26.06 | 7,557.40 | | 0081 | 739-01-00100 | Hydro-Seeding | 1.06 | ACRE | 3,950.00 | 4,187.00 | 4,762.00 | 5,047.72 | 4,400.00 | 4,664.00 | 3,696.60 | 3,918.40 | | 0082 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,100.00 | 14,100.00 | 12,000.00 | 12,000.00 | 35,000.00 | 35,000.00 | 259,822.50 | 259,822.50 | | 0083 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 37,717 | INLF | 1.00 | 37,717.00 | 1.30 | 49,032.10 | 1.00 | 37,717.00 | 1.07 | 40,357.19 | | 0084 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 2 | EACH | 4,650.00 | 9,300.00 | 10,000.00 | 20,000.00 | 20,000.00 | 40,000.00 | 29,088.00 | 58,176.00 | | 0085 | NS-736-00001 | GPS | 1 | EACH | 812.00 | 812.00 | 800.00 | 800.00 | 700.00 | 700.00 | 632.18 | 632.18 | | 0086 | NS-736-00120 | Signal Radar Vehicle Detection Sensor (Stop Bar) | 4 | EACH | 10,100.00 | 40,400.00 | 9,947.00 | 39,788.00 | 11,000.00 | 44,000.00 | 11,443.74 | 45,774.96 | | 0087 | NS-736-00122 | Signal Radar Vehicle Detection System Cabinet Interface Unit (CIU) | 1 | EACH | 10,100.00 | 10,100.00 | 10,046.00 | 10,046.00 | 10,000.00 | 10,000.00 | 9,896.11 | 9,896.11 | | 0088 | NS-736-00123 | Signal Radar Vehicle Detection (Cable) | 610 | LNFT | 18.00 | 10,980.00 | 18.00 | 10,980.00 | 6.00 | 3,660.00 | 7.15 | 4,361.50 | | 0089 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 1 | EACH | 31,125.00 | 31,125.00 | 30,680.00 | 30,680.00 | 44,000.00 | 44,000.00 | 35,094.12 | 35,094.12 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,562,835.78 | | 2,693,608.91 | | 3,416,435.05 | | 4,125,746.82 |
|