Proposal:H.012001.6
Parish:Vermilion
Routes:LA 339
Description:LA 339: CANAL & CREEK BRIDGES
Type Construction:GRADING, DRAINAGE STRUCTURES, REMOVAL OF TIMBER TRESTLE BRIDGES, SUBGRADE LAYER (TREATED), CLASS II BASE COURSE, PAVEMENT WIDENING, MILLING ASPHALT PAVEMENT, PAVEMENT WIDENING, ASPHALT CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS (PRECAST) AND RELATED WORK.
Estimated Construction Cost:$3,643,377.43
| Rank | License | Bidder | Construction Bid |
| 1 | 46716 | BRUDD CONSTRUCTION CO., LLC | $4,135,235.80 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $4,827,960.53 |
| 3 | 33663 | Glenn Lege Construction LLC | $4,936,057.72 |
| 4 | 54206 | Southern Constructors, LLC | $5,297,526.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - BRUDD CONSTRUCTION CO., LLC | - 2 - SIEMA CONSTRUCTION, LLC | - 3 - Glenn Lege Construction LLC | - 4 - Southern Constructors, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.49 | LUMP | 11,550.00 | 11,550.00 | 25,000.00 | 25,000.00 | 12,275.00 | 12,275.00 | 35,000.00 | 35,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 28,876.00 | 28,876.00 | 45,000.00 | 45,000.00 | 6,000.00 | 6,000.00 | 70,000.00 | 70,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 33 | SQYD | 15.49 | 511.17 | 55.00 | 1,815.00 | 36.00 | 1,188.00 | 20.00 | 660.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 1,402.4 | SQYD | 12.76 | 17,894.62 | 12.00 | 16,828.80 | 17.00 | 23,840.80 | 17.00 | 23,840.80 | | 0005 | 202-02-04501 | Removal of Bridge REMOVAL OF TIMBER TRESTLE BRIDGE:
STR. NO. 03572160100651 | 480 | LUMP | 5,775.00 | 5,775.00 | 17,500.00 | 17,500.00 | 10,500.00 | 10,500.00 | 30,000.00 | 30,000.00 | | 0006 | 202-02-04501 | Removal of Bridge REMOVAL OF TIMBER TRESTLE BRIDGE:
STR. NO. 03572160101501 | 1,040 | LUMP | 5,775.00 | 5,775.00 | 23,500.00 | 23,500.00 | 15,750.00 | 15,750.00 | 30,000.00 | 30,000.00 | | 0007 | 202-02-04501 | Removal of Bridge REMOVAL OF TIMBER TRESTLE BRIDGE:
STR. NO. 03572160105521 | 480 | LUMP | 5,775.00 | 5,775.00 | 20,000.00 | 20,000.00 | 10,500.00 | 10,500.00 | 30,000.00 | 30,000.00 | | 0008 | 202-02-12000 | Removal of Fence | 745 | LNFT | 2.52 | 1,877.40 | 3.00 | 2,235.00 | 3.50 | 2,607.50 | 5.00 | 3,725.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 872.8 | LNFT | 20.66 | 18,032.05 | 7.00 | 6,109.60 | 15.70 | 13,702.96 | 30.00 | 26,184.00 | | 0010 | 202-03-38000 | Relocation of Sign | 27 | EACH | 114.00 | 3,078.00 | 175.00 | 4,725.00 | 58.00 | 1,566.00 | 350.00 | 9,450.00 | | 0011 | 203-01-00100 | General Excavation | 3,676 | CUYD | 8.45 | 31,062.20 | 19.00 | 69,844.00 | 15.00 | 55,140.00 | 18.00 | 66,168.00 | | 0012 | 203-02-00100 | Drainage Excavation | 3,573 | CUYD | 7.37 | 26,333.01 | 19.00 | 67,887.00 | 15.00 | 53,595.00 | 18.00 | 64,314.00 | | 0013 | 203-03-00100 | Embankment | 4,616 | CUYD | 20.50 | 94,628.00 | 30.00 | 138,480.00 | 27.50 | 126,940.00 | 45.00 | 207,720.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 95 | EACH | 33.00 | 3,135.00 | 43.00 | 4,085.00 | 41.00 | 3,895.00 | 60.00 | 5,700.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 15 | EACH | 200.00 | 3,000.00 | 215.00 | 3,225.00 | 205.00 | 3,075.00 | 500.00 | 7,500.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 4,685 | LNFT | 2.70 | 12,649.50 | 2.50 | 11,712.50 | 2.50 | 11,712.50 | 3.00 | 14,055.00 | | 0017 | 302-02-10010 | Class II Base Course (10" Thick) (Soil Cement) | 2,023.4 | SQYD | 42.00 | 84,982.80 | 50.00 | 101,170.00 | 24.00 | 48,561.60 | 37.00 | 74,865.80 | | 0018 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 2,024 | SQYD | 29.00 | 58,696.00 | 25.00 | 50,600.00 | 23.50 | 47,564.00 | 35.00 | 70,840.00 | | 0019 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 86.2 | CUYD | 260.00 | 22,412.00 | 250.00 | 21,550.00 | 143.00 | 12,326.60 | 150.00 | 12,930.00 | | 0020 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 1,700 | SQYD | 51.23 | 87,091.00 | 65.00 | 110,500.00 | 54.00 | 91,800.00 | 60.00 | 102,000.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 1,636.5 | TON | 210.00 | 343,665.00 | 250.00 | 409,125.00 | 165.00 | 270,022.50 | 245.00 | 400,942.50 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 87.1 | TON | 275.00 | 23,952.50 | 600.00 | 52,260.00 | 220.00 | 19,162.00 | 330.00 | 28,743.00 | | 0023 | 509-01-00100 | Milling Asphalt Pavement | 4,049 | SQYD | 8.95 | 36,238.55 | 9.00 | 36,441.00 | 7.00 | 28,343.00 | 10.00 | 40,490.00 | | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -225 | CUYD | 1.18 | -265.50 | 0.12 | -27.00 | 0.10 | -22.50 | 2.00 | -450.00 | | 0025 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 72 | SQYD | 174.00 | 12,528.00 | 155.00 | 11,160.00 | 142.00 | 10,224.00 | 500.00 | 36,000.00 | | 0026 | 510-05-00100 | Pavement Widening | 536.7 | TON | 179.00 | 96,069.30 | 250.00 | 134,175.00 | 175.00 | 93,922.50 | 300.00 | 161,010.00 | | 0027 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 42 | LNFT | 116.00 | 4,872.00 | 155.00 | 6,510.00 | 100.00 | 4,200.00 | 105.00 | 4,410.00 | | 0028 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 119 | LNFT | 118.00 | 14,042.00 | 80.00 | 9,520.00 | 110.00 | 13,090.00 | 113.00 | 13,447.00 | | 0029 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 529 | LNFT | 145.00 | 76,705.00 | 105.00 | 55,545.00 | 135.00 | 71,415.00 | 135.00 | 71,415.00 | | 0030 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 592 | LNFT | 162.00 | 95,904.00 | 130.00 | 76,960.00 | 165.00 | 97,680.00 | 160.00 | 94,720.00 | | 0031 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 174 | LNFT | 147.00 | 25,578.00 | 110.00 | 19,140.00 | 169.00 | 29,406.00 | 160.00 | 27,840.00 | | 0032 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 66 | LNFT | 189.00 | 12,474.00 | 160.00 | 10,560.00 | 203.00 | 13,398.00 | 180.00 | 11,880.00 | | 0033 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 152 | LNFT | 210.61 | 32,012.72 | 220.00 | 33,440.00 | 245.00 | 37,240.00 | 220.00 | 33,440.00 | | 0034 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 64 | LNFT | 217.30 | 13,907.20 | 250.00 | 16,000.00 | 340.00 | 21,760.00 | 270.00 | 17,280.00 | | 0035 | 701-05-01049 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW) | 130 | LNFT | 173.40 | 22,542.00 | 92.00 | 11,960.00 | 110.00 | 14,300.00 | 113.00 | 14,690.00 | | 0036 | 701-05-01068 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) | 34 | LNFT | 129.80 | 4,413.20 | 150.00 | 5,100.00 | 135.00 | 4,590.00 | 135.00 | 4,590.00 | | 0037 | 701-05-01086 | Side Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 98 | LNFT | 137.37 | 13,462.26 | 150.00 | 14,700.00 | 164.50 | 16,121.00 | 160.00 | 15,680.00 | | 0038 | 701-05-02126 | Side Drain Pipe (Erosion) (42" RPVCP/CPEPDW/CPPPDW/CPPPTW) | 188 | LNFT | 128.00 | 24,064.00 | 175.00 | 32,900.00 | 270.00 | 50,760.00 | 225.00 | 42,300.00 | | 0039 | 701-06-00100 | Side Drain Pipe Arch (42" Equiv. RCPA) | 88 | LNFT | 206.64 | 18,184.32 | 250.00 | 22,000.00 | 320.00 | 28,160.00 | 330.00 | 29,040.00 | | 0040 | 701-07-00500 | Yard Drain Pipe (12") | 12 | LNFT | 77.55 | 930.60 | 85.00 | 1,020.00 | 60.00 | 720.00 | 10.00 | 120.00 | | 0041 | 701-15-00100 | Concrete Collar | 1 | EACH | 818.86 | 818.86 | 5,500.00 | 5,500.00 | 650.00 | 650.00 | 1,500.00 | 1,500.00 | | 0042 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 284 | LNFT | 8.31 | 2,360.04 | 22.00 | 6,248.00 | 64.00 | 18,176.00 | 5.00 | 1,420.00 | | 0043 | 702-03-00100 | Catch Basins (CB-01) | 10 | EACH | 4,781.09 | 47,810.90 | 4,400.00 | 44,000.00 | 4,750.00 | 47,500.00 | 8,000.00 | 80,000.00 | | 0044 | 702-03-00200 | Catch Basins (CB-02) | 6 | EACH | 6,335.58 | 38,013.48 | 5,000.00 | 30,000.00 | 5,300.00 | 31,800.00 | 8,500.00 | 51,000.00 | | 0045 | 702-08-00100 | Side Drain Safety End (Type 1) | 12 | EACH | 3,258.74 | 39,104.88 | 5,405.00 | 64,860.00 | 4,750.00 | 57,000.00 | 6,000.00 | 72,000.00 | | 0046 | 702-08-00200 | Side Drain Safety End (Type 2) | 7 | EACH | 7,664.96 | 53,654.72 | 5,650.00 | 39,550.00 | 17,760.00 | 124,320.00 | 10,000.00 | 70,000.00 | | 0047 | 705-01-00100 | Barbed Wire Fence | 686 | LNFT | 13.25 | 9,089.50 | 15.00 | 10,290.00 | 15.00 | 10,290.00 | 35.00 | 24,010.00 | | 0048 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 26.7 | SQYD | 380.52 | 10,159.88 | 278.00 | 7,422.60 | 90.00 | 2,403.00 | 150.00 | 4,005.00 | | 0049 | 708-01-00100 | Right-of-Way Monument | 42 | EACH | 668.00 | 28,056.00 | 735.00 | 30,870.00 | 700.00 | 29,400.00 | 850.00 | 35,700.00 | | 0050 | 708-02-00100 | Right-of-Way Monument Witness Post | 42 | EACH | 223.00 | 9,366.00 | 245.00 | 10,290.00 | 300.00 | 12,600.00 | 300.00 | 12,600.00 | | 0051 | 710-01-00100 | Flowable Fill | 81 | CUYD | 181.90 | 14,733.90 | 155.00 | 12,555.00 | 200.00 | 16,200.00 | 200.00 | 16,200.00 | | 0052 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,377.00 | 35,377.00 | 100,000.00 | 100,000.00 | 334,700.00 | 334,700.00 | 150,000.00 | 150,000.00 | | 0053 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.306 | MILE | 1,345.00 | 1,756.57 | 1,500.00 | 1,959.00 | 1,395.00 | 1,821.87 | 1,600.00 | 2,089.60 | | 0054 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 69 | EACH | 9.00 | 621.00 | 10.00 | 690.00 | 10.00 | 690.00 | 12.00 | 828.00 | | 0055 | 716-01-00100 | Mulch (Vegetative) | 11.1 | TON | 855.00 | 9,490.50 | 1,100.00 | 12,210.00 | 990.00 | 10,989.00 | 1,000.00 | 11,100.00 | | 0056 | 717-01-00100 | Seeding | 166 | LB | 11.65 | 1,933.90 | 15.00 | 2,490.00 | 29.00 | 4,814.00 | 30.00 | 4,980.00 | | 0057 | 718-01-00100 | Fertilizer | 5,530 | LB | 0.85 | 4,700.50 | 1.00 | 5,530.00 | 1.00 | 5,530.00 | 2.00 | 11,060.00 | | 0058 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 1,150.5 | SQYD | 2.20 | 2,531.10 | 2.65 | 3,048.83 | 2.50 | 2,876.25 | 20.00 | 23,010.00 | | 0059 | 722-02-00100 | Project Site Laboratory (Equipped) | 3 | EACH | 4,720.00 | 14,160.00 | 22,000.00 | 66,000.00 | 15,000.00 | 45,000.00 | 40,000.00 | 120,000.00 | | 0060 | 724-01-00100 | Rumble Strips (Centerline) | 0.39 | MILE | 1,115.00 | 434.85 | 2,500.00 | 975.00 | 350.00 | 136.50 | 2,000.00 | 780.00 | | 0061 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.78 | MILE | 900.00 | 702.00 | 1,300.00 | 1,014.00 | 350.00 | 273.00 | 2,000.00 | 1,560.00 | | 0062 | 725-01-00100 | Temporary Detour Roads | 1,722.6 | SQYD | 208.00 | 358,300.80 | 140.00 | 241,164.00 | 113.00 | 194,653.80 | 160.00 | 275,616.00 | | 0063 | 726-01-00100 | Bedding Material | 631.8 | CUYD | 148.00 | 93,506.40 | 225.00 | 142,155.00 | 110.00 | 69,498.00 | 150.00 | 94,770.00 | | 0064 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 405,000.00 | 405,000.00 | 321,800.00 | 321,800.00 | 200,000.00 | 200,000.00 | | 0065 | 729-01-00100 | Sign (Type A) | 25 | SQFT | 56.00 | 1,400.00 | 42.00 | 1,050.00 | 58.00 | 1,450.00 | 75.00 | 1,875.00 | | 0066 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 150.00 | 1,800.00 | 105.00 | 1,260.00 | 157.00 | 1,884.00 | 500.00 | 6,000.00 | | 0067 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 6 | EACH | 235.00 | 1,410.00 | 245.00 | 1,470.00 | 245.00 | 1,470.00 | 350.00 | 2,100.00 | | 0068 | 731-02-00100 | Reflectorized Raised Pavement Markers | 53 | EACH | 9.00 | 477.00 | 10.00 | 530.00 | 9.30 | 492.90 | 15.00 | 795.00 | | 0069 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.78 | MILE | 9,000.00 | 7,020.00 | 9,775.00 | 7,624.50 | 9,292.00 | 7,247.76 | 11,000.00 | 8,580.00 | | 0070 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.39 | MILE | 6,500.00 | 2,535.00 | 7,150.00 | 2,788.50 | 6,800.00 | 2,652.00 | 8,000.00 | 3,120.00 | | 0071 | 732-05-00100 | Removal of Existing Markings | 0.308 | MILE | 9,200.00 | 2,833.60 | 10,150.00 | 3,126.20 | 9,585.00 | 2,952.18 | 11,000.00 | 3,388.00 | | 0072 | 735-01-00100 | Mailboxes | 4 | EACH | 29.00 | 116.00 | 25.00 | 100.00 | 29.00 | 116.00 | 500.00 | 2,000.00 | | 0073 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 295.00 | 1,180.00 | 306.00 | 1,224.00 | 290.00 | 1,160.00 | 500.00 | 2,000.00 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 43,255.00 | 43,255.00 | 18,950.00 | 18,950.00 | 56,300.00 | 56,300.00 | 40,000.00 | 40,000.00 | | 0075 | 805-15-02700 | Reinforced Concrete Box Culverts (Precast) 2 - 102' 10'X5' | 204 | LNFT | 1,730.00 | 352,920.00 | 1,950.00 | 397,800.00 | 2,000.00 | 408,000.00 | 2,000.00 | 408,000.00 | | 0076 | 805-15-02700 | Reinforced Concrete Box Culverts (Precast) 3 - 102' 12'X4' | 306 | LNFT | 1,924.42 | 588,872.52 | 2,200.00 | 673,200.00 | 2,315.00 | 708,390.00 | 2,300.00 | 703,800.00 | | 0077 | 805-15-02700 | Reinforced Concrete Box Culverts (Precast) 3 - 80' 9'X5' | 240 | LNFT | 1,423.00 | 341,520.00 | 1,800.00 | 432,000.00 | 1,900.00 | 456,000.00 | 1,700.00 | 408,000.00 | | 0078 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall SITE 1: QUANTITY OF STEEL = 6,456 LBS, QUANTITY OF CONCRETE = 33.77 CU YD | 2 | EACH | 48,994.00 | 97,988.00 | 50,500.00 | 101,000.00 | 81,060.00 | 162,120.00 | 70,000.00 | 140,000.00 | | 0079 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall SITE 2: QUANTITY OF STEEL = 10,300 LBS, QUANTITY OF CONCRETE = 59.60 CU YD | 2 | EACH | 51,902.00 | 103,804.00 | 62,000.00 | 124,000.00 | 110,275.00 | 220,550.00 | 115,000.00 | 230,000.00 | | 0080 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall SITE 3: QUANTITY OF STEEL = 3,593 LBS, QUANTITY OF CONCRETE = 20.21 CU YD | 2 | EACH | 44,981.00 | 89,962.00 | 46,500.00 | 93,000.00 | 58,385.00 | 116,770.00 | 42,500.00 | 85,000.00 | | 0081 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 13,700 | INLF | 0.89 | 12,193.00 | 0.65 | 8,905.00 | 1.75 | 23,975.00 | 2.00 | 27,400.00 | | 0082 | NS-719-00002 | Tree Trimming | 1 | LUMP | 14.00 | 14.00 | 3,665.00 | 3,665.00 | 13,635.00 | 13,635.00 | 7,500.00 | 7,500.00 | | 0083 | 714-01-00600 | Slab Sodding (St. Augustine) | 1,060 | SQYD | 14.00 | 14,840.00 | 11.50 | 12,190.00 | 29.00 | 30,740.00 | 20.00 | 21,200.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,135,235.80 | | 4,827,960.53 | | 4,936,057.72 | | 5,297,526.70 |
|