Proposal:H.016464.6
Parish:Plaquemines
Routes:LA 23
Description:LA 23: RUSSELL DRIVE - HWY 11
Type Construction:BORROW, MILLING ASPHALT CONCRETE, HES CONCRETE PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$8,086,755.01
| Rank | License | Bidder | Construction Bid |
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $7,175,265.00 |
| 2 | 30774 | Progressive Construction Co., LLC | $7,233,745.55 |
| 3 | 06276 | Barriere Construction Co., LLC | $7,812,222.00 |
| 4 | 73475 | Madden Gulf Coast, LLC | $8,250,113.63 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boh Bros. Construction Co., LLC. | - 2 - Progressive Construction Co., LLC | - 3 - Barriere Construction Co., LLC | - 4 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 220 | LNFT | 35.00 | 7,700.00 | 25.00 | 5,500.00 | 30.00 | 6,600.00 | 21.00 | 4,620.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,630 | CUYD | 10.00 | 36,300.00 | 35.00 | 127,050.00 | 10.00 | 36,300.00 | 31.50 | 114,345.00 | | 0003 | 502-01-00100 | Asphalt Concrete | 16,044.5 | TON | 155.00 | 2,486,897.50 | 169.00 | 2,711,520.50 | 165.00 | 2,647,342.50 | 130.00 | 2,085,785.00 | | 0004 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 584.5 | TON | 295.00 | 172,427.50 | 284.00 | 165,998.00 | 250.00 | 146,125.00 | 405.00 | 236,722.50 | | 0005 | 509-01-00100 | Milling Asphalt Pavement | 49,980 | SQYD | 4.50 | 224,910.00 | 3.00 | 149,940.00 | 2.50 | 124,950.00 | 4.25 | 212,415.00 | | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,648 | CUYD | 0.10 | -164.80 | 6.00 | -9,888.00 | 10.00 | -16,480.00 | 0.01 | -16.48 | | 0007 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 30,836 | LNFT | 3.00 | 92,508.00 | 3.50 | 107,926.00 | 2.75 | 84,799.00 | 3.25 | 100,217.00 | | 0008 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 32,538 | LNFT | 3.25 | 105,748.50 | 3.50 | 113,883.00 | 2.75 | 89,479.50 | 3.75 | 122,017.50 | | 0009 | 602-03-00100 | Cleaning and Sealing Random Cracks | 2,000 | LNFT | 6.00 | 12,000.00 | 6.00 | 12,000.00 | 3.75 | 7,500.00 | 4.50 | 9,000.00 | | 0010 | 602-10-00100 | Longitudinal Shoulder Joints | 38,790 | LNFT | 3.00 | 116,370.00 | 3.30 | 128,007.00 | 2.25 | 87,277.50 | 2.50 | 96,975.00 | | 0011 | 602-16-00101 | High Early Strength (HES) Concrete Pavement Full Depth Patching | 4,612 | SQYD | 450.00 | 2,075,400.00 | 460.00 | 2,121,520.00 | 535.00 | 2,467,420.00 | 690.00 | 3,182,280.00 | | 0012 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 2 | EACH | 250.00 | 500.00 | 2,200.00 | 4,400.00 | 275.00 | 550.00 | 500.00 | 1,000.00 | | 0013 | 702-04-00200 | Adjusting Catch Basins | 4 | EACH | 5,000.00 | 20,000.00 | 5,000.00 | 20,000.00 | 4,500.00 | 18,000.00 | 4,900.00 | 19,600.00 | | 0014 | 707-01-00100 | Concrete Curb | 220 | LNFT | 60.00 | 13,200.00 | 50.00 | 11,000.00 | 45.00 | 9,900.00 | 42.00 | 9,240.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 565,000.00 | 565,000.00 | 152,000.00 | 152,000.00 | 750,000.00 | 750,000.00 | 725,000.00 | 725,000.00 | | 0016 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,229 | LNFT | 0.75 | 1,671.75 | 0.60 | 1,337.40 | 0.35 | 780.15 | 0.35 | 780.15 | | 0017 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,142 | LNFT | 1.00 | 1,142.00 | 0.60 | 685.20 | 1.00 | 1,142.00 | 1.00 | 1,142.00 | | 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.631 | MILE | 750.00 | 9,473.25 | 800.00 | 10,104.80 | 661.00 | 8,349.09 | 400.00 | 5,052.40 | | 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.431 | MILE | 550.00 | 5,737.05 | 800.00 | 8,344.80 | 750.00 | 7,823.25 | 750.00 | 7,823.25 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 31.224 | MILE | 750.00 | 23,418.00 | 1,200.00 | 37,468.80 | 1,000.00 | 31,224.00 | 1,000.00 | 31,224.00 | | 0021 | 716-01-00100 | Mulch (Vegetative) | 5 | TON | 1,100.00 | 5,500.00 | 1,100.00 | 5,500.00 | 1,100.00 | 5,500.00 | 850.00 | 4,250.00 | | 0022 | 717-01-00100 | Seeding | 90 | LB | 20.00 | 1,800.00 | 14.00 | 1,260.00 | 12.50 | 1,125.00 | 25.00 | 2,250.00 | | 0023 | 718-01-00100 | Fertilizer | 4,500 | LB | 1.00 | 4,500.00 | 1.10 | 4,950.00 | 1.10 | 4,950.00 | 0.85 | 3,825.00 | | 0024 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 12.374 | MILE | 350.00 | 4,330.90 | 550.00 | 6,805.70 | 325.00 | 4,021.55 | 1,000.00 | 12,374.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 700,000.00 | 700,000.00 | 700,000.00 | 700,000.00 | 759,000.00 | 759,000.00 | 820,000.00 | 820,000.00 | | 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,933 | EACH | 5.00 | 9,665.00 | 8.60 | 16,623.80 | 6.00 | 11,598.00 | 5.50 | 10,631.50 | | 0027 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 143 | LNFT | 5.00 | 715.00 | 6.50 | 929.50 | 2.75 | 393.25 | 2.50 | 357.50 | | 0028 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 571 | LNFT | 15.00 | 8,565.00 | 21.00 | 11,991.00 | 12.00 | 6,852.00 | 11.00 | 6,281.00 | | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.106 | MILE | 5,500.00 | 77,583.00 | 5,400.00 | 76,172.40 | 4,250.00 | 59,950.50 | 4,000.00 | 56,424.00 | | 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.175 | MILE | 1,700.00 | 10,497.50 | 2,160.00 | 13,338.00 | 1,400.00 | 8,645.00 | 1,250.00 | 7,718.75 | | 0031 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.203 | MILE | 5,000.00 | 1,015.00 | 10,800.00 | 2,192.40 | 5,500.00 | 1,116.50 | 5,000.00 | 1,015.00 | | 0032 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 1.142 | MILE | 11,000.00 | 12,562.00 | 3,780.00 | 4,316.76 | 11,000.00 | 12,562.00 | 10,000.00 | 11,420.00 | | 0033 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 19 | EACH | 300.00 | 5,700.00 | 540.00 | 10,260.00 | 305.00 | 5,795.00 | 275.00 | 5,225.00 | | 0034 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 300.00 | 900.00 | 540.00 | 1,620.00 | 305.00 | 915.00 | 275.00 | 825.00 | | 0035 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 15 | EACH | 300.00 | 4,500.00 | 648.00 | 9,720.00 | 305.00 | 4,575.00 | 250.00 | 3,750.00 | | 0036 | 732-05-00100 | Removal of Existing Markings | 5.377 | MILE | 3,300.00 | 17,744.10 | 12,744.00 | 68,524.49 | 6,000.00 | 32,262.00 | 5,000.00 | 26,885.00 | | 0037 | 735-01-00100 | Mailboxes | 54 | EACH | 150.00 | 8,100.00 | 108.00 | 5,832.00 | 1.10 | 59.40 | 25.00 | 1,350.00 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 46 | EACH | 75.00 | 3,450.00 | 270.00 | 12,420.00 | 245.00 | 11,270.00 | 250.00 | 11,500.00 | | 0039 | 735-03-00100 | Mailbox Supports (Double) | 4 | EACH | 150.00 | 600.00 | 378.00 | 1,512.00 | 350.00 | 1,400.00 | 275.00 | 1,100.00 | | 0040 | 736-09-00100 | Loop Detector | 302 | LNFT | 45.00 | 13,590.00 | 44.00 | 13,288.00 | 42.00 | 12,684.00 | 39.65 | 11,974.30 | | 0041 | 736-10-00200 | Underground Junction Box (Type E) | 2 | EACH | 1,500.00 | 3,000.00 | 1,700.00 | 3,400.00 | 1,500.00 | 3,000.00 | 1,379.68 | 2,759.36 | | 0042 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 10 | LNFT | 25.00 | 250.00 | 20.00 | 200.00 | 15.00 | 150.00 | 13.88 | 138.80 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 83,255.71 | 83,255.71 | 41,000.00 | 41,000.00 | | 0044 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 35,258 | LNFT | 2.00 | 70,516.00 | 2.00 | 70,516.00 | 2.25 | 79,330.50 | 1.60 | 56,412.80 | | 0045 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 40,075 | LNFT | 2.00 | 80,150.00 | 2.00 | 80,150.00 | 2.25 | 90,168.75 | 1.60 | 64,120.00 | | 0046 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 69,757 | LNFT | 1.00 | 69,757.00 | 2.00 | 139,514.00 | 1.00 | 69,757.00 | 1.15 | 80,220.55 | | 0047 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 3,101 | INLF | 0.75 | 2,325.75 | 2.00 | 6,202.00 | 0.85 | 2,635.85 | 2.00 | 6,202.00 | | 0048 | NS-602-00001 | Milling Concrete Pavement | 1,885.5 | SQYD | 20.00 | 37,710.00 | 20.00 | 37,710.00 | 16.00 | 30,168.00 | 18.50 | 34,881.75 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 7,175,265.00 | | 7,233,745.55 | | 7,812,222.00 | | 8,250,113.63 |
|