Proposal:H.016362.6
Parish:Caddo
Routes:LA 525
Description:LA 525: SPRING RIDGE TO US 171
Type Construction:DRAINAGE STRUCTURES, GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$10,420,168.10
| Rank | License | Bidder | Construction Bid |
| 1 | 67822 | Earnest Contracting LLC | $9,231,396.90 |
| 2 | 17464 | Benton & Brown, LLC. | $11,479,948.84 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Earnest Contracting LLC | - 2 - Benton & Brown, LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 40,000.00 | 40,000.00 | 25,500.00 | 25,500.00 | | 0002 | 202-02-04560 | Removal of Bridge Joint Poured Silicone | 2,036.4 | LNFT | 5.00 | 10,182.00 | 11.00 | 22,400.40 | | 0003 | 202-02-14500 | Removal of Guard Rail | 3,461 | LNFT | 12.00 | 41,532.00 | 13.20 | 45,685.20 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,508 | CUYD | 25.00 | 37,700.00 | 44.00 | 66,352.00 | | 0005 | 203-10-00100 | Cleaning Existing Ditches | 300 | LNFT | 20.00 | 6,000.00 | 22.00 | 6,600.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 5,510 | LNFT | 5.00 | 27,550.00 | 3.60 | 19,836.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 22 | CUYD | 100.00 | 2,200.00 | 165.00 | 3,630.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 37,590.8 | TON | 145.50 | 5,469,461.40 | 165.00 | 6,202,482.00 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,518.8 | TON | 153.00 | 232,376.40 | 450.00 | 683,460.00 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 144,596 | SQYD | 5.50 | 795,278.00 | 5.50 | 795,278.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,864 | CUYD | 0.10 | -586.40 | 0.01 | -58.64 | | 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,902.1 | SQYD | 130.00 | 507,273.00 | 175.00 | 682,867.50 | | 0013 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 27,536 | LNFT | 5.00 | 137,680.00 | 6.00 | 165,216.00 | | 0014 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 22,016 | LNFT | 5.00 | 110,080.00 | 6.00 | 132,096.00 | | 0015 | 602-05-01200 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10" Thick) | 50 | SQYD | 300.00 | 15,000.00 | 440.00 | 22,000.00 | | 0016 | 602-05-02200 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10" Thick) | 50 | SQYD | 300.00 | 15,000.00 | 440.00 | 22,000.00 | | 0017 | 602-05-03200 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10" Thick) | 50 | SQYD | 300.00 | 15,000.00 | 440.00 | 22,000.00 | | 0018 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 8 | LNFT | 185.00 | 1,480.00 | 550.00 | 4,400.00 | | 0019 | 701-01-01042 | Cross Drain Pipe (36" RCP/RPVCP/CPEPDW) | 48 | LNFT | 285.00 | 13,680.00 | 300.00 | 14,400.00 | | 0020 | 701-08-00100 | Relaying Pipe 30" RCP | 16 | LNFT | 150.00 | 2,400.00 | 330.00 | 5,280.00 | | 0021 | 701-15-00100 | Concrete Collar | 1 | EACH | 750.00 | 750.00 | 4,000.00 | 4,000.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 41 | LNFT | 100.00 | 4,100.00 | 1.10 | 45.10 | | 0023 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 500 | LNFT | 76.00 | 38,000.00 | 84.00 | 42,000.00 | | 0024 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 1,050 | LNFT | 170.00 | 178,500.00 | 187.00 | 196,350.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 2,370 | LNFT | 38.00 | 90,060.00 | 42.00 | 99,540.00 | | 0026 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 80.00 | 4,000.00 | 88.00 | 4,400.00 | | 0027 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 125.00 | 12,500.00 | 137.50 | 13,750.00 | | 0028 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,800.00 | 3,800.00 | 4,200.00 | 4,200.00 | | 0029 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 23 | EACH | 3,900.00 | 89,700.00 | 4,300.00 | 98,900.00 | | 0030 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,900.00 | 15,600.00 | 4,300.00 | 17,200.00 | | 0031 | 707-01-00100 | Concrete Curb | 42 | LNFT | 20.00 | 840.00 | 38.50 | 1,617.00 | | 0032 | 707-04-00100 | Asphalt Curb | 210 | LNFT | 75.00 | 15,750.00 | 19.00 | 3,990.00 | | 0033 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 268 | SQYD | 150.00 | 40,200.00 | 110.00 | 29,480.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 250,000.00 | 250,000.00 | | 0035 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,500 | LNFT | 0.25 | 375.00 | 0.30 | 450.00 | | 0036 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 684 | LNFT | 1.00 | 684.00 | 1.10 | 752.40 | | 0037 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 29.763 | MILE | 500.00 | 14,881.50 | 825.00 | 24,554.48 | | 0038 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.514 | MILE | 500.00 | 7,257.00 | 550.00 | 7,982.70 | | 0039 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 117.795 | MILE | 1,000.00 | 117,795.00 | 1,100.00 | 129,574.50 | | 0040 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 90 | EACH | 50.00 | 4,500.00 | 55.00 | 4,950.00 | | 0041 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 21 | EACH | 50.00 | 1,050.00 | 55.00 | 1,155.00 | | 0042 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 12 | EACH | 50.00 | 600.00 | 55.00 | 660.00 | | 0043 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 50.00 | 300.00 | 55.00 | 330.00 | | 0044 | 716-01-00100 | Mulch (Vegetative) | 41.2 | TON | 1,500.00 | 61,800.00 | 1,045.00 | 43,054.00 | | 0045 | 717-01-00100 | Seeding | 1,236 | LB | 21.00 | 25,956.00 | 20.00 | 24,720.00 | | 0046 | 718-01-00100 | Fertilizer | 20,600 | LB | 0.95 | 19,570.00 | 0.83 | 17,098.00 | | 0047 | 724-01-00100 | Rumble Strips (Centerline) | 8.553 | MILE | 3,000.00 | 25,659.00 | 3,300.00 | 28,224.90 | | 0048 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 17.106 | MILE | 2,300.00 | 39,343.80 | 2,550.00 | 43,620.30 | | 0049 | 726-01-00100 | Bedding Material | 6.9 | CUYD | 250.00 | 1,725.00 | 770.00 | 5,313.00 | | 0050 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 730,000.00 | 730,000.00 | | 0051 | 729-16-00200 | Object Marker Assembly (Type 2) | 13 | EACH | 80.00 | 1,040.00 | 88.00 | 1,144.00 | | 0052 | 729-16-00300 | Object Marker Assembly (Type 3) | 28 | EACH | 125.00 | 3,500.00 | 137.50 | 3,850.00 | | 0053 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,222 | EACH | 8.00 | 25,776.00 | 8.80 | 28,353.60 | | 0054 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 500 | LNFT | 5.00 | 2,500.00 | 5.50 | 2,750.00 | | 0055 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 228 | LNFT | 30.00 | 6,840.00 | 33.00 | 7,524.00 | | 0056 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 340 | LNFT | 7.00 | 2,380.00 | 7.70 | 2,618.00 | | 0057 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 39.265 | MILE | 8,000.00 | 314,120.00 | 8,800.00 | 345,532.00 | | 0058 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.838 | MILE | 3,000.00 | 14,514.00 | 3,300.00 | 15,965.40 | | 0059 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 30 | EACH | 650.00 | 19,500.00 | 715.00 | 21,450.00 | | 0060 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 7 | EACH | 500.00 | 3,500.00 | 550.00 | 3,850.00 | | 0061 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 500.00 | 2,500.00 | 550.00 | 2,750.00 | | 0062 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 7 | EACH | 600.00 | 4,200.00 | 660.00 | 4,620.00 | | 0063 | 732-05-00100 | Removal of Existing Markings | 1.276 | MILE | 10,000.00 | 12,760.00 | 11,000.00 | 14,036.00 | | 0064 | 735-01-00100 | Mailboxes | 198 | EACH | 1.00 | 198.00 | 1.10 | 217.80 | | 0065 | 735-02-00100 | Mailbox Supports (Single) | 198 | EACH | 248.00 | 49,104.00 | 275.00 | 54,450.00 | | 0066 | 737-05-00002 | Painted Curbs | 60 | LNFT | 50.00 | 3,000.00 | 55.00 | 3,300.00 | | 0067 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | | 0068 | 815-03-00300 | Joint Seal (Poured) | 2,036.4 | LNFT | 5.00 | 10,182.00 | 44.00 | 89,601.60 | | 0069 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 1,424 | LNFT | 4.00 | 5,696.00 | 8.25 | 11,748.00 | | 0070 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 612.4 | LNFT | 4.00 | 2,449.60 | 8.25 | 5,052.30 | | 0071 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 2,036.4 | LNFT | 1.50 | 3,054.60 | 8.25 | 16,800.30 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,231,396.90 | | 11,479,948.84 |
|