Bid Tabulations for the Letting of 10/15/2025 LA DOTD Headquarters

Proposal:H.016137.6
Parish:Lafourche, Terrebonne
Routes:LA 3185
Description:LA 3185: LA 1 - LA 20
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,942,090.15
Rank License BidderConstruction Bid
162139Huey P. Stockstill, LLC$2,741,956.75
200046Barber Bros. Contracting Co., L.L.C$3,196,577.81
306276Barriere Construction Co., LLC$3,357,222.00
446747Triumph Construction, LLC$4,134,647.21


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Huey P. Stockstill, LLC
- 2 -
Barber Bros. Contracting Co., L.L.C
- 3 -
Barriere Construction Co., LLC
- 4 -
Triumph Construction, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-14500Removal of Guard Rail 909.5   LNFT9.508,640.2510.009,095.0010.009,095.0011.0010,004.50
0002202-02-38240Removal of Signs and Supports 51     EACH10.00510.0010.50535.5026.001,326.0076.003,876.00
0003203-03-00100Embankment 34.4   CUYD65.002,236.00150.005,160.00102.003,508.8031.001,066.40
0004203-07-00100Borrow (Vehicular Measurement) 490     CUYD35.0017,150.0060.0029,400.0020.009,800.0070.0034,300.00
0005502-01-00100Asphalt Concrete 11,553.2   TON110.001,270,852.00120.001,386,384.00131.001,513,469.20174.002,010,256.80
0006502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 1,135     TON225.00255,375.00185.00209,975.00235.00266,725.00174.00197,490.00
0007509-01-00100Milling Asphalt Pavement 110,438     SQYD1.00110,438.004.00441,752.003.75414,142.507.00773,066.00
0008509-02-00100Contractor Retained Reclaimed Asphalt Pavement -6,136     CUYD0.01-61.360.000.004.00-24,544.000.06-368.16
0009510-01-00260Pavement Patching (16 inch Minimum Thickness) 2,700     SQYD108.00291,600.00165.00445,500.00152.00410,400.0044.00118,800.00
0010701-10-01060Reinforced Concrete Pipe (Extension) (24") 42     LNFT475.0019,950.00370.0015,540.00475.0019,950.0083.003,486.00
0011701-15-00100Concrete Collar 3     EACH4,000.0012,000.003,000.009,000.006,400.0019,200.00187.00561.00
0012704-01-01000Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 269.1   LNFT55.0014,800.5057.0015,338.7057.0015,338.7084.0022,604.40
0013704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 342     LNFT130.0044,460.00132.5045,315.00135.0046,170.00191.0065,322.00
0014704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 331.3   LNFT30.009,939.0031.0010,270.3031.0010,270.3035.0011,595.50
0015704-10-00105Guard Rail End Treatment (Flared, 12' - 6" Length) 8     EACH1,800.0014,400.002,000.0016,000.001,900.0015,200.004,615.0036,920.00
0016704-10-00204Guard Rail End Treatment, MASH, (TL-2 Tangent) 2     EACH4,350.008,700.004,500.009,000.004,600.009,200.003,290.006,580.00
0017704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 6     EACH4,500.0027,000.004,800.0028,800.004,800.0028,800.003,924.0023,544.00
0018713-01-00100Temporary Signs and Barricades 1     LUMP95,000.0095,000.0095,000.0095,000.00155,000.00155,000.0026,520.0026,520.00
0019713-02-00300Temporary Pavement Markings (8" Width) 660     LNFT0.1599.000.20132.000.1599.002.001,320.00
0020713-02-00500Temporary Pavement Markings (24" Width) 282     LNFT0.2570.500.2570.500.2570.504.001,128.00
0021713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 8.292 MILE165.001,368.18600.004,975.20660.005,472.72671.005,563.93
0022713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 8.292 MILE600.004,975.20650.005,389.80600.004,975.20786.006,517.51
0023713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 29.112 MILE900.0026,200.80900.0026,200.80900.0026,200.80835.0024,308.52
0024713-05-00190Temporary Pavement Legends & Symbols (Arrow - Straight) 4     EACH25.00100.0035.00140.0025.00100.00235.00940.00
0025713-05-00220Temporary Pavement Legends & Symbols (Arrow - Left Turn) 4     EACH25.00100.0035.00140.0025.00100.00235.00940.00
0026713-05-00230Temporary Pavement Legends & Symbols (Arrow - Right Turn) 8     EACH25.00200.0035.00280.0025.00200.00138.001,104.00
0027716-01-00100Mulch (Vegetative) 2.5   TON1,750.004,375.001,750.004,375.001,800.004,500.002,016.005,040.00
0028717-01-00100Seeding 75     LB5.00375.0011.50862.5011.50862.5014.001,050.00
0029718-01-00100Fertilizer 1,250     LB0.75937.501.001,250.001.051,312.502.002,500.00
0030724-01-00100Rumble Strips (Centerline) 5.24  MILE650.003,406.00300.001,572.00290.001,519.60567.002,971.08
0031724-02-00100Rumble Strips (Shoulder/Edge) 10.48  MILE505.005,292.40300.003,144.00290.003,039.20445.004,663.60
0032726-01-00100Bedding Material 9.2   CUYD210.001,932.00135.001,242.00415.003,818.0068.00625.60
0033727-01-00100Mobilization 1     LUMP270,000.00270,000.00135,000.00135,000.00165,000.00165,000.00380,920.00380,920.00
0034729-01-00102Sign (Type A)(Furnish and Install) 110     SQFT20.002,200.0021.002,310.0026.002,860.0041.004,510.00
0035729-16-00300Object Marker Assembly (Type 3) 45     EACH100.004,500.00105.004,725.00105.004,725.0099.004,455.00
0036729-22-00100Square Tubing Post with 2-1/4" Anchor 16     EACH150.002,400.00160.002,560.00155.002,480.00203.003,248.00
0037731-02-00100Reflectorized Raised Pavement Markers 3,393     EACH4.5015,268.504.7516,116.754.7516,116.755.0016,965.00
0038732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 330     LNFT4.001,320.004.001,320.004.151,369.506.001,980.00
0039732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 141     LNFT16.002,256.0016.252,291.2516.502,326.5020.002,820.00
0040732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 14.556 MILE4,300.0062,590.804,305.0062,663.584,450.0064,774.205,821.0084,730.48
0041732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 4.146 MILE1,200.004,975.201,205.004,995.931,250.005,182.501,918.007,952.03
0042732-03-02030Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) 0.072 MILE9,240.00665.289,250.00666.0010,000.00720.0011,667.00840.02
0043732-04-01020Plastic Pavement Legends and Symbols (Arrow - Straight) 2     EACH350.00700.00375.00750.00355.00710.00675.001,350.00
0044732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) 2     EACH350.00700.00375.00750.00355.00710.00705.001,410.00
0045732-04-01100Plastic Pavement Legends and Symbols (Arrow - Right Turn) 4     EACH350.001,400.00375.001,500.00355.001,420.00510.002,040.00
0046732-04-15020Plastic Pavement Legends and Symbols (ONLY) 4     EACH450.001,800.00475.001,900.00465.001,860.00540.002,160.00
0047735-01-00100Mailboxes 46     EACH50.002,300.0055.002,530.001.0046.0024.001,104.00
0048735-02-00100Mailbox Supports (Single) 46     EACH150.006,900.00165.007,590.00210.009,660.00289.0013,294.00
0049740-01-00100Construction Layout 1     LUMP8,250.008,250.0012,500.0012,500.005,286.035,286.0311,540.0011,540.00
0050NS-500-00220Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay 15,820     LNFT1.5023,730.002.2535,595.001.9530,849.003.0047,460.00
0051NS-500-00240Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay 6,650     LNFT1.5510,307.502.5016,625.002.0013,300.003.0019,950.00
0052NS-500-00260Sawcuts in Asphalt Concrete Lifts 22,450     LNFT1.0523,572.501.0022,450.000.9020,205.002.0044,900.00
0053NS-830-00100Concrete Bridge Railing Repair and Rehabilitation 38     LNFT1,150.0043,700.001,050.0039,900.00850.0032,300.002,019.0076,722.00
             
  CONTRACTOR TOTAL   2,741,956.75 3,196,577.81 3,357,222.00 4,134,647.21