Bid Tabulations for the Letting of 10/15/2025 LA DOTD Headquarters

Proposal:H.016123.6
Parish:LaSalle
Routes:LA 771
Description:LA 771: LA 503 - END OF MAINTENANCE
Type Construction:CLEARING AND GRUBBING, BORROW, MILLING ASPHALT PAVEMENT, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,129,909.92
Rank License BidderConstruction Bid
112487Diamond B Construction Co., L.L.C.$3,115,342.10
212312Gilchrist Construction Company, LLC$3,704,512.00
305789D & J CONSTRUCTION CO., LLC$4,100,163.90


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
Gilchrist Construction Company, LLC
- 3 -
D & J CONSTRUCTION CO., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00200Clearing and Grubbing (Selective) 2.821 Acres2.821 LUMP62,000.0062,000.00100,000.00100,000.0050,000.0050,000.00
0002202-02-00020Removal of CONCRETE SLAB1     SQYD300.00300.005,000.005,000.001,500.001,500.00
0003202-02-14500Removal of Guard Rail 280     LNFT14.003,920.0016.004,480.0030.008,400.00
0004203-07-00100Borrow (Vehicular Measurement) 756     CUYD22.0016,632.0060.0045,360.0050.0037,800.00
0005203-10-00100Cleaning Existing Ditches 50     LNFT25.001,250.0010.00500.0030.001,500.00
0006204-06-00100Temporary Silt Fencing 130     LNFT10.001,300.0012.001,560.007.00910.00
0007303-02-00100Removal of Existing Patches 500     SQYD6.503,250.0025.0012,500.0030.0015,000.00
0008303-03-00400In-Place Cement Treated Base Course (12" Thick) 54,048.5   SQYD13.75743,166.8817.00918,824.5016.00864,776.00
0009401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,595     CUYD49.0078,155.0080.00127,600.00100.00159,500.00
0010502-01-00100Asphalt Concrete 10,116.7   TON142.001,436,571.40150.001,517,505.00195.001,972,756.50
0011502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 334.3   TON350.00117,005.00150.0050,145.00300.00100,290.00
0012509-01-00100Milling Asphalt Pavement 51,783     SQYD2.25116,511.753.00155,349.005.00258,915.00
0013509-02-00100Contractor Retained Reclaimed Asphalt Pavement -1,084     CUYD1.00-1,084.001.00-1,084.001.00-1,084.00
0014701-08-00100Relaying Pipe 24" RCP24     LNFT270.006,480.00700.0016,800.00375.009,000.00
0015701-08-00100Relaying Pipe 30" RCP4     LNFT280.001,120.00725.002,900.00400.001,600.00
0016701-08-00100Relaying Pipe 36" RCP8     LNFT300.002,400.00750.006,000.00425.003,400.00
0017701-15-00100Concrete Collar 9     EACH2,100.0018,900.003,000.0027,000.002,600.0023,400.00
0018704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 240     LNFT88.0021,120.0050.0012,000.00120.0028,800.00
0019704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 175     LNFT35.006,125.0035.006,125.0040.007,000.00
0020704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT235.0023,500.00125.0012,500.00145.0014,500.00
0021704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 4     EACH4,200.0016,800.003,500.0014,000.005,500.0022,000.00
0022713-01-00100Temporary Signs and Barricades 1     LUMP40,000.0040,000.00100,000.00100,000.0050,000.0050,000.00
0023713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 9.028 MILE140.001,263.92300.002,708.40250.002,257.00
0024713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 3.9   MILE600.002,340.00600.002,340.00800.003,120.00
0025713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 31.006 MILE900.0027,905.40800.0024,804.80900.0027,905.40
0026720-01-01000Erosion Control System (Slope Protection) (Type A) 480     SQYD10.004,800.004.001,920.004.001,920.00
0027722-02-00100Project Site Laboratory (Equipped) 1     EACH12,000.0012,000.0018,000.0018,000.005,000.005,000.00
0028726-01-00100Bedding Material 22.3   CUYD225.005,017.50225.005,017.50150.003,345.00
0029727-01-00100Mobilization 1     LUMP243,000.00243,000.00370,000.00370,000.00260,000.00260,000.00
0030729-16-00200Object Marker Assembly (Type 2) 14     EACH125.001,750.00130.001,820.00130.001,820.00
0031729-16-00300Object Marker Assembly (Type 3) 4     EACH135.00540.0090.00360.00140.00560.00
0032731-02-00100Reflectorized Raised Pavement Markers 935     EACH5.004,675.007.006,545.008.007,480.00
0033732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 15.503 MILE4,350.0067,438.055,600.0086,816.806,000.0093,018.00
0034732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.95  MILE1,200.002,340.002,800.005,460.002,000.003,900.00
0035732-05-00100Removal of Existing Markings STRIPING ON BRIDGES ONLY0.106 MILE8,100.00858.605,000.00530.0020,000.002,120.00
0036735-01-00100Mailboxes 15     EACH25.00375.0030.00450.0040.00600.00
0037735-02-00100Mailbox Supports (Single) 15     EACH296.044,440.60300.004,500.00350.005,250.00
0038739-01-00100Hydro-Seeding 0.127 ACRE25,000.003,175.0025,000.003,175.0015,000.001,905.00
0039740-01-00100Construction Layout 1     LUMP18,000.0018,000.0035,000.0035,000.0050,000.0050,000.00
           
  CONTRACTOR TOTAL   3,115,342.10 3,704,512.00 4,100,163.90