Proposal:H.015806.6
Parish:Orleans
Routes:LA 3139
Description:LA 3139: EARHART APPROACH - MONROE ST
Type Construction:CONCRETE PAVEMENT PATCHING, CONCRETE WALKS AND RAMPS, LOOP DETECOTRS, AND RELATED WORK.
Estimated Construction Cost:$425,434.84
| Rank | License | Bidder | Construction Bid |
| 1 | 76669 | Alonso LLC | $415,996.70 |
| 2 | 28190 | Buck Town Contractors & Co. | $485,855.13 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $505,550.00 |
| 4 | 68424 | Procivil, LLC | $523,144.00 |
| 5 | 48896 | Command Construction Industries LLC | $589,792.20 |
| 6 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $634,752.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Alonso LLC | - 2 - Buck Town Contractors & Co. | - 3 - Boh Bros. Construction Co., LLC. | - 4 - Procivil, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 52 | SQYD | 45.00 | 2,340.00 | 32.00 | 1,664.00 | 39.00 | 2,028.00 | 35.00 | 1,820.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 86 | LNFT | 21.00 | 1,806.00 | 18.00 | 1,548.00 | 15.00 | 1,290.00 | 25.00 | 2,150.00 | | 0003 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 9,300 | LNFT | 4.50 | 41,850.00 | 4.30 | 39,990.00 | 5.00 | 46,500.00 | 4.00 | 37,200.00 | | 0004 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 10,207 | LNFT | 4.50 | 45,931.50 | 4.30 | 43,890.10 | 5.00 | 51,035.00 | 4.00 | 40,828.00 | | 0005 | 602-03-00100 | Cleaning and Sealing Random Cracks | 80 | LNFT | 60.00 | 4,800.00 | 7.00 | 560.00 | 10.00 | 800.00 | 40.00 | 3,200.00 | | 0006 | 602-06-00100 | Partial Depth Patching of Jointed Concrete Pavement | 11 | SQYD | 1,500.00 | 16,500.00 | 686.00 | 7,546.00 | 880.00 | 9,680.00 | 600.00 | 6,600.00 | | 0007 | 602-16-00101 | High Early Strength (HES) Concrete Pavement Full Depth Patching | 296.4 | SQYD | 400.00 | 118,560.00 | 334.00 | 98,997.60 | 450.00 | 133,380.00 | 500.00 | 148,200.00 | | 0008 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 5,000.00 | 5,000.00 | 2,800.00 | 2,800.00 | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | | 0009 | 706-01-00100 | Concrete Walk (4" Thick) | 38.8 | SQYD | 200.00 | 7,760.00 | 78.00 | 3,026.40 | 130.00 | 5,044.00 | 150.00 | 5,820.00 | | 0010 | 706-01-00300 | Concrete Walk (6" Thick) | 6.1 | SQYD | 300.00 | 1,830.00 | 115.00 | 701.50 | 160.00 | 976.00 | 150.00 | 915.00 | | 0011 | 706-04-00110 | Curb Ramps TYPE 1 | 25.6 | SQYD | 300.00 | 7,680.00 | 285.00 | 7,296.00 | 325.00 | 8,320.00 | 250.00 | 6,400.00 | | 0012 | 706-04-00110 | Curb Ramps TYPE 4 | 53.7 | SQYD | 260.00 | 13,962.00 | 220.00 | 11,814.00 | 220.00 | 11,814.00 | 250.00 | 13,425.00 | | 0013 | 706-04-00110 | Curb Ramps TYPE 5 | 57.3 | SQYD | 220.00 | 12,606.00 | 220.00 | 12,606.00 | 205.00 | 11,746.50 | 250.00 | 14,325.00 | | 0014 | 706-04-00110 | Curb Ramps TYPE 8 | 93 | SQYD | 260.00 | 24,180.00 | 274.00 | 25,482.00 | 265.00 | 24,645.00 | 250.00 | 23,250.00 | | 0015 | 707-01-00100 | Concrete Curb | 206 | LNFT | 50.00 | 10,300.00 | 33.00 | 6,798.00 | 80.00 | 16,480.00 | 50.00 | 10,300.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 77,500.00 | 77,500.00 | 63,000.00 | 63,000.00 | 65,000.00 | 65,000.00 | | 0017 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 200.00 | 20.00 | 28,000.00 | 2,800.00 | 27,915.00 | 2,791.50 | 1,000.00 | 100.00 | | 0018 | 717-01-00100 | Seeding | 1 | LB | 100.00 | 100.00 | 30.00 | 30.00 | 28.00 | 28.00 | 500.00 | 500.00 | | 0019 | 718-01-00100 | Fertilizer | 14 | LB | 20.00 | 280.00 | 2.00 | 28.00 | 2.00 | 28.00 | 50.00 | 700.00 | | 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 20,000.00 | 20,000.00 | 48,000.00 | 48,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | | 0021 | 731-02-00100 | Reflectorized Raised Pavement Markers | 257 | EACH | 7.00 | 1,799.00 | 6.00 | 1,542.00 | 6.00 | 1,542.00 | 10.00 | 2,570.00 | | 0022 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 175 | LNFT | 6.00 | 1,050.00 | 4.00 | 700.00 | 4.00 | 700.00 | 5.00 | 875.00 | | 0023 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,844 | LNFT | 6.00 | 11,064.00 | 4.00 | 7,376.00 | 4.00 | 7,376.00 | 5.00 | 9,220.00 | | 0024 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 271 | LNFT | 18.00 | 4,878.00 | 18.00 | 4,878.00 | 17.00 | 4,607.00 | 20.00 | 5,420.00 | | 0025 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 299 | LNFT | 5.00 | 1,495.00 | 3.00 | 897.00 | 3.00 | 897.00 | 6.00 | 1,794.00 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.492 | MILE | 10,000.00 | 14,920.00 | 6,659.00 | 9,935.23 | 6,000.00 | 8,952.00 | 10,000.00 | 14,920.00 | | 0027 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 0.746 | MILE | 10,200.00 | 7,609.20 | 11,500.00 | 8,579.00 | 11,000.00 | 8,206.00 | 20,000.00 | 14,920.00 | | 0028 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 400.00 | 400.00 | 345.00 | 345.00 | 345.00 | 345.00 | 700.00 | 700.00 | | 0029 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 400.00 | 800.00 | 345.00 | 690.00 | 345.00 | 690.00 | 700.00 | 1,400.00 | | 0030 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 400.00 | 1,200.00 | 345.00 | 1,035.00 | 345.00 | 1,035.00 | 700.00 | 2,100.00 | | 0031 | 732-05-00100 | Removal of Existing Markings | 0.746 | MILE | 6,000.00 | 4,476.00 | 3,550.00 | 2,648.30 | 3,500.00 | 2,611.00 | 12,000.00 | 8,952.00 | | 0032 | 736-01-00100 | Trenching and Backfilling | 20 | LNFT | 30.00 | 600.00 | 15.00 | 300.00 | 14.00 | 280.00 | 15.00 | 300.00 | | 0033 | 736-09-00100 | Loop Detector | 324 | LNFT | 30.00 | 9,720.00 | 46.00 | 14,904.00 | 45.00 | 14,580.00 | 50.00 | 16,200.00 | | 0034 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 20 | LNFT | 12.00 | 240.00 | 11.00 | 220.00 | 11.00 | 220.00 | 12.00 | 240.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 38,000.00 | 38,000.00 | 10,223.00 | 10,223.00 | 5,000.00 | 5,000.00 | | 0036 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 560 | INLF | 4.00 | 2,240.00 | 1.30 | 728.00 | 1.25 | 700.00 | 5.00 | 2,800.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 415,996.70 | | 485,855.13 | | 505,550.00 | | 523,144.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Command Construction Industries LLC | - 6 - KORT's CONSTRUCTION SERVICES, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 52 | SQYD | 50.00 | 2,600.00 | 50.00 | 2,600.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 86 | LNFT | 25.00 | 2,150.00 | 10.00 | 860.00 | | 0003 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 9,300 | LNFT | 4.00 | 37,200.00 | 3.50 | 32,550.00 | | 0004 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 10,207 | LNFT | 4.00 | 40,828.00 | 4.00 | 40,828.00 | | 0005 | 602-03-00100 | Cleaning and Sealing Random Cracks | 80 | LNFT | 6.00 | 480.00 | 40.00 | 3,200.00 | | 0006 | 602-06-00100 | Partial Depth Patching of Jointed Concrete Pavement | 11 | SQYD | 500.00 | 5,500.00 | 1,700.00 | 18,700.00 | | 0007 | 602-16-00101 | High Early Strength (HES) Concrete Pavement Full Depth Patching | 296.4 | SQYD | 400.00 | 118,560.00 | 670.00 | 198,588.00 | | 0008 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 2,000.00 | 2,000.00 | 3,000.00 | 3,000.00 | | 0009 | 706-01-00100 | Concrete Walk (4" Thick) | 38.8 | SQYD | 100.00 | 3,880.00 | 75.00 | 2,910.00 | | 0010 | 706-01-00300 | Concrete Walk (6" Thick) | 6.1 | SQYD | 150.00 | 915.00 | 120.00 | 732.00 | | 0011 | 706-04-00110 | Curb Ramps TYPE 1 | 25.6 | SQYD | 250.00 | 6,400.00 | 230.00 | 5,888.00 | | 0012 | 706-04-00110 | Curb Ramps TYPE 4 | 53.7 | SQYD | 250.00 | 13,425.00 | 185.00 | 9,934.50 | | 0013 | 706-04-00110 | Curb Ramps TYPE 5 | 57.3 | SQYD | 250.00 | 14,325.00 | 175.00 | 10,027.50 | | 0014 | 706-04-00110 | Curb Ramps TYPE 8 | 93 | SQYD | 250.00 | 23,250.00 | 195.00 | 18,135.00 | | 0015 | 707-01-00100 | Concrete Curb | 206 | LNFT | 30.00 | 6,180.00 | 28.00 | 5,768.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 175,000.00 | 175,000.00 | 110,000.00 | 110,000.00 | | 0017 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 25,000.00 | 2,500.00 | 30,000.00 | 3,000.00 | | 0018 | 717-01-00100 | Seeding | 1 | LB | 25.00 | 25.00 | 31.00 | 31.00 | | 0019 | 718-01-00100 | Fertilizer | 14 | LB | 2.00 | 28.00 | 2.00 | 28.00 | | 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 55,000.00 | 55,000.00 | 60,000.00 | 60,000.00 | | 0021 | 731-02-00100 | Reflectorized Raised Pavement Markers | 257 | EACH | 6.00 | 1,542.00 | 1.00 | 257.00 | | 0022 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 175 | LNFT | 4.00 | 700.00 | 4.00 | 700.00 | | 0023 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,844 | LNFT | 4.00 | 7,376.00 | 7.00 | 12,908.00 | | 0024 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 271 | LNFT | 20.00 | 5,420.00 | 19.00 | 5,149.00 | | 0025 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 299 | LNFT | 3.00 | 897.00 | 4.00 | 1,196.00 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.492 | MILE | 600.00 | 895.20 | 7,500.00 | 11,190.00 | | 0027 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 0.746 | MILE | 12,500.00 | 9,325.00 | 12,500.00 | 9,325.00 | | 0028 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 400.00 | 400.00 | 380.00 | 380.00 | | 0029 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 400.00 | 800.00 | 380.00 | 760.00 | | 0030 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 400.00 | 1,200.00 | 380.00 | 1,140.00 | | 0031 | 732-05-00100 | Removal of Existing Markings | 0.746 | MILE | 3,500.00 | 2,611.00 | 9,500.00 | 7,087.00 | | 0032 | 736-01-00100 | Trenching and Backfilling | 20 | LNFT | 15.00 | 300.00 | 16.00 | 320.00 | | 0033 | 736-09-00100 | Loop Detector | 324 | LNFT | 50.00 | 16,200.00 | 50.00 | 16,200.00 | | 0034 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 20 | LNFT | 10.00 | 200.00 | 12.00 | 240.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | | 0036 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 560 | INLF | 3.00 | 1,680.00 | 2.00 | 1,120.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 589,792.20 | | 634,752.00 |
|