Proposal:H.015805.6
Parish:Terrebonne
Routes:LA 315
Description:LA 315: THERIOT WATER TWR - TOMMY DARCEY BR
Type Construction:GRADING, PAVEMENT PATCHING, MILLING ASPHALT CONCRETE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,206,211.30
| Rank | License | Bidder | Construction Bid |
| 1 | 62139 | Huey P. Stockstill, LLC | $1,724,470.21 |
| 2 | 06276 | Barriere Construction Co., LLC | $2,059,829.53 |
| 3 | 46747 | Triumph Construction, LLC | $3,095,635.23 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Huey P. Stockstill, LLC | - 2 - Barriere Construction Co., LLC | - 3 - Triumph Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.058 | LUMP | 10,000.00 | 10,000.00 | 7,200.00 | 7,200.00 | 15,580.00 | 15,580.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 420 | LNFT | 10.00 | 4,200.00 | 15.00 | 6,300.00 | 17.00 | 7,140.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 36" RCP | 8 | LNFT | 400.00 | 3,200.00 | 284.00 | 2,272.00 | 154.00 | 1,232.00 | | 0004 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 3,500.00 | 3,500.00 | 6,500.00 | 6,500.00 | 710.00 | 710.00 | | 0005 | 202-02-38200 | Removal of Signs | 8 | EACH | 50.00 | 400.00 | 27.00 | 216.00 | 30.00 | 240.00 | | 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 38 | EACH | 50.00 | 1,900.00 | 54.00 | 2,052.00 | 58.00 | 2,204.00 | | 0007 | 203-03-00100 | Embankment | 110 | CUYD | 25.00 | 2,750.00 | 88.00 | 9,680.00 | 56.00 | 6,160.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 132.6 | CUYD | 75.00 | 9,945.00 | 20.00 | 2,652.00 | 97.00 | 12,862.20 | | 0009 | 502-01-00100 | Asphalt Concrete | 6,284 | TON | 110.00 | 691,240.00 | 130.00 | 816,920.00 | 220.00 | 1,382,480.00 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 664 | TON | 245.00 | 162,680.00 | 276.00 | 183,264.00 | 224.00 | 148,736.00 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 62,014 | SQYD | 1.00 | 62,014.00 | 3.00 | 186,042.00 | 9.00 | 558,126.00 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,445 | CUYD | 0.01 | -34.45 | 14.00 | -48,230.00 | 0.06 | -206.70 | | 0013 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,022 | SQYD | 125.00 | 127,750.00 | 120.00 | 122,640.00 | 159.00 | 162,498.00 | | 0014 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 8 | LNFT | 500.00 | 4,000.00 | 700.00 | 5,600.00 | 268.00 | 2,144.00 | | 0015 | 701-15-00100 | Concrete Collar | 1 | EACH | 6,000.00 | 6,000.00 | 7,000.00 | 7,000.00 | 180.00 | 180.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 6 | LNFT | 175.00 | 1,050.00 | 240.00 | 1,440.00 | 1,232.00 | 7,392.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 162.5 | LNFT | 30.00 | 4,875.00 | 37.00 | 6,012.50 | 41.00 | 6,662.50 | | 0018 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 75 | LNFT | 50.00 | 3,750.00 | 53.00 | 3,975.00 | 58.00 | 4,350.00 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 100.00 | 10,000.00 | 134.00 | 13,400.00 | 145.00 | 14,500.00 | | 0020 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 3,750.00 | 7,500.00 | 3,700.00 | 7,400.00 | 4,040.00 | 8,080.00 | | 0021 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 3,750.00 | 7,500.00 | 3,200.00 | 6,400.00 | 3,465.00 | 6,930.00 | | 0022 | 707-01-00100 | Concrete Curb | 42 | LNFT | 65.00 | 2,730.00 | 220.00 | 9,240.00 | 107.00 | 4,494.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 76,000.00 | 76,000.00 | 170,000.00 | 170,000.00 | 7,520.00 | 7,520.00 | | 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 64 | LNFT | 0.40 | 25.60 | 0.50 | 32.00 | 15.00 | 960.00 | | 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.136 | MILE | 160.00 | 1,301.76 | 20.00 | 162.72 | 576.00 | 4,686.34 | | 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.849 | MILE | 500.00 | 2,924.50 | 640.00 | 3,743.36 | 736.00 | 4,304.86 | | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 25.252 | MILE | 600.00 | 15,151.20 | 1,000.00 | 25,252.00 | 730.00 | 18,433.96 | | 0028 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 4 | EACH | 100.00 | 400.00 | 53.00 | 212.00 | 348.00 | 1,392.00 | | 0029 | 716-01-00100 | Mulch (Vegetative) | 4 | TON | 850.00 | 3,400.00 | 1,300.00 | 5,200.00 | 1,418.00 | 5,672.00 | | 0030 | 717-01-00100 | Seeding | 120 | LB | 10.00 | 1,200.00 | 13.00 | 1,560.00 | 14.00 | 1,680.00 | | 0031 | 718-01-00100 | Fertilizer | 1,900 | LB | 1.00 | 1,900.00 | 1.00 | 1,900.00 | 2.00 | 3,800.00 | | 0032 | 726-01-00100 | Bedding Material | 10.7 | CUYD | 210.00 | 2,247.00 | 415.00 | 4,440.50 | 167.00 | 1,786.90 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 172,000.00 | 172,000.00 | 110,000.00 | 110,000.00 | 281,590.00 | 281,590.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 46 | EACH | 150.00 | 6,900.00 | 100.00 | 4,600.00 | 110.00 | 5,060.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 688 | EACH | 4.00 | 2,752.00 | 5.00 | 3,440.00 | 6.00 | 4,128.00 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 32 | LNFT | 12.00 | 384.00 | 21.00 | 672.00 | 43.00 | 1,376.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.626 | MILE | 4,500.00 | 56,817.00 | 4,500.00 | 56,817.00 | 5,265.00 | 66,475.89 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.925 | MILE | 1,200.00 | 3,510.00 | 1,250.00 | 3,656.25 | 1,703.00 | 4,981.28 | | 0039 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL) | 2 | EACH | 750.00 | 1,500.00 | 1,000.00 | 2,000.00 | 1,330.00 | 2,660.00 | | 0040 | 735-01-00100 | Mailboxes | 82 | EACH | 25.00 | 2,050.00 | 1.00 | 82.00 | 2.00 | 164.00 | | 0041 | 735-02-00100 | Mailbox Supports (Single) | 78 | EACH | 125.00 | 9,750.00 | 210.00 | 16,380.00 | 243.00 | 18,954.00 | | 0042 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 250.00 | 500.00 | 330.00 | 660.00 | 360.00 | 720.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,960.00 | 10,960.00 | | 0044 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 64,281 | LNFT | 1.35 | 86,779.35 | 2.00 | 128,562.00 | 2.00 | 128,562.00 | | 0045 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 34,331 | LNFT | 1.35 | 46,346.85 | 2.00 | 68,662.00 | 2.00 | 68,662.00 | | 0046 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 98,612 | LNFT | 0.95 | 93,681.40 | 0.85 | 83,820.20 | 1.00 | 98,612.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,724,470.21 | | 2,059,829.53 | | 3,095,635.23 |
|