Proposal:H.015543.6
Parish:Avoyelles
Routes:LA 452
Description:LA 452: DRAINAGE AT CALDWELL STREET
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE, AND RELATED WORK.
Estimated Construction Cost:$701,565.00
| Rank | License | Bidder | Construction Bid |
| 1 | 55505 | MERRICK, LLC | $856,628.50 |
| 2 | 46716 | BRUDD CONSTRUCTION CO., LLC | $1,126,041.65 |
| 3 | 54928 | Womack And Sons Constr. Group LLC | $1,517,275.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - MERRICK, LLC | - 2 - BRUDD CONSTRUCTION CO., LLC | - 3 - Womack And Sons Constr. Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.4 | LUMP | 15,000.00 | 15,000.00 | 18,040.00 | 18,040.00 | 120,000.00 | 120,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 15,998.00 | 15,998.00 | 17,900.00 | 17,900.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 31 | SQYD | 30.00 | 930.00 | 23.32 | 722.92 | 99.00 | 3,069.00 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 1,000.00 | 2,000.00 | 722.00 | 1,444.00 | 1,980.00 | 3,960.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 327 | SQYD | 20.00 | 6,540.00 | 16.31 | 5,333.37 | 23.00 | 7,521.00 | | 0006 | 202-02-12000 | Removal of Fence | 378 | LNFT | 9.00 | 3,402.00 | 14.11 | 5,333.58 | 4.50 | 1,701.00 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" RCP | 69 | LNFT | 30.00 | 2,070.00 | 23.19 | 1,600.11 | 57.50 | 3,967.50 | | 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) 30" RCP | 6 | LNFT | 30.00 | 180.00 | 44.44 | 266.64 | 388.00 | 2,328.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) 60" RCP | 38 | LNFT | 30.00 | 1,140.00 | 14.03 | 533.14 | 123.00 | 4,674.00 | | 0010 | 203-10-00100 | Cleaning Existing Ditches | 50 | LNFT | 20.00 | 1,000.00 | 35.14 | 1,757.00 | 62.00 | 3,100.00 | | 0011 | 204-02-00100 | Temporary Hay Bales | 64 | EACH | 20.00 | 1,280.00 | 41.30 | 2,643.20 | 30.00 | 1,920.00 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 250.00 | 750.00 | 177.00 | 531.00 | 296.00 | 888.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 985 | LNFT | 3.00 | 2,955.00 | 2.36 | 2,324.60 | 6.00 | 5,910.00 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 75 | CUYD | 120.00 | 9,000.00 | 139.45 | 10,458.75 | 166.00 | 12,450.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 9.2 | TON | 650.00 | 5,980.00 | 1,180.00 | 10,856.00 | 2,400.00 | 22,080.00 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 19.9 | TON | 650.00 | 12,935.00 | 615.00 | 12,238.50 | 1,270.00 | 25,273.00 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 112 | SQYD | 30.00 | 3,360.00 | 33.75 | 3,780.00 | 82.00 | 9,184.00 | | 0018 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 112 | SQYD | 200.00 | 22,400.00 | 195.00 | 21,840.00 | 370.00 | 41,440.00 | | 0019 | 701-03-01160 | Storm Drain Pipe (72" RCP) | 524 | LNFT | 500.00 | 262,000.00 | 775.21 | 406,210.04 | 805.00 | 421,820.00 | | 0020 | 701-03-02200 | Storm Drain Pipe (Outfall) (84" CMP) | 20 | LNFT | 720.00 | 14,400.00 | 1,242.00 | 24,840.00 | 960.00 | 19,200.00 | | 0021 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 63 | LNFT | 175.00 | 11,025.00 | 216.00 | 13,608.00 | 295.00 | 18,585.00 | | 0022 | 701-04-01160 | Storm Drain Pipe Arch (60" Equiv. RCPA) | 32 | LNFT | 750.00 | 24,000.00 | 972.00 | 31,104.00 | 790.00 | 25,280.00 | | 0023 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 576 | LNFT | 20.00 | 11,520.00 | 30.52 | 17,579.52 | 17.65 | 10,166.40 | | 0024 | 701-18-00100 | Special Shoring and Bracing (Depth >5 feet) | 1,350 | SQFT | 20.00 | 27,000.00 | 28.77 | 38,839.50 | 82.00 | 110,700.00 | | 0025 | 702-02-00100 | Manholes (MH-06) | 3 | EACH | 12,000.00 | 36,000.00 | 12,355.63 | 37,066.89 | 12,000.00 | 36,000.00 | | 0026 | 702-03-00010 | Catch Basins (Modified Conflict Box) | 1 | EACH | 55,000.00 | 55,000.00 | 56,183.30 | 56,183.30 | 139,900.00 | 139,900.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 5,500.00 | 5,500.00 | 6,222.69 | 6,222.69 | 9,200.00 | 9,200.00 | | 0028 | 702-03-01100 | Catch Basins (CB-SD02) | 1 | EACH | 30,000.00 | 30,000.00 | 25,745.00 | 25,745.00 | 53,230.00 | 53,230.00 | | 0029 | 702-05-01140 | Cross Drain End Treatment (1 Barrel, 72" RCP or 84" CMP) | 1 | EACH | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | 56,200.00 | 56,200.00 | | 0030 | 702-07-00200 | Cross Drain Safety End (Type 2) | 1 | EACH | 15,000.00 | 15,000.00 | 12,000.00 | 12,000.00 | 7,500.00 | 7,500.00 | | 0031 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 223 | LNFT | 22.00 | 4,906.00 | 24.78 | 5,525.94 | 48.00 | 10,704.00 | | 0032 | 706-01-00100 | Concrete Walk (4" Thick) | 19.2 | SQYD | 90.00 | 1,728.00 | 273.00 | 5,241.60 | 648.00 | 12,441.60 | | 0033 | 706-01-00300 | Concrete Walk (6" Thick) | 82.8 | SQYD | 95.00 | 7,866.00 | 126.69 | 10,489.93 | 230.00 | 19,044.00 | | 0034 | 706-02-00200 | Concrete Drive (6" Thick) | 231.8 | SQYD | 100.00 | 23,180.00 | 101.20 | 23,458.16 | 220.00 | 50,996.00 | | 0035 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 55.7 | SQYD | 200.00 | 11,140.00 | 118.13 | 6,579.84 | 340.00 | 18,938.00 | | 0036 | 710-01-00120 | Flowable Fill (Non-Excavatable) | 45 | CUYD | 150.00 | 6,750.00 | 227.09 | 10,219.05 | 490.00 | 22,050.00 | | 0037 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 47 | SQYD | 110.00 | 5,170.00 | 85.57 | 4,021.79 | 267.00 | 12,549.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 42,168.78 | 42,168.78 | 36,100.00 | 36,100.00 | | 0039 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 1,000.00 | 1,000.00 | 6,500.00 | 6,500.00 | 8,900.00 | 8,900.00 | | 0040 | 726-01-00100 | Bedding Material | 267.5 | CUYD | 145.00 | 38,787.50 | 165.18 | 44,185.65 | 208.00 | 55,640.00 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 85,000.00 | 85,000.00 | 160,000.00 | 160,000.00 | 34,700.00 | 34,700.00 | | 0042 | 729-16-00200 | Object Marker Assembly (Type 2) | 1 | EACH | 100.00 | 100.00 | 118.00 | 118.00 | 112.00 | 112.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 13 | EACH | 100.00 | 1,300.00 | 29.50 | 383.50 | 320.00 | 4,160.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.182 | MILE | 35,000.00 | 6,370.00 | 11,300.00 | 2,056.60 | 35,200.00 | 6,406.40 | | 0045 | 739-01-00100 | Hydro-Seeding | 0.4 | ACRE | 7,000.00 | 2,800.00 | 7,550.00 | 3,020.00 | 13,350.00 | 5,340.00 | | 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 6,500.00 | 6,500.00 | 11,500.00 | 11,500.00 | | 0047 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 121 | INLF | 4.00 | 484.00 | 1.18 | 142.78 | 3.70 | 447.70 | | 0048 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 768 | INLF | 4.00 | 3,072.00 | 1.18 | 906.24 | 5.00 | 3,840.00 | | 0049 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,652 | INLF | 4.00 | 6,608.00 | 1.77 | 2,924.04 | 5.00 | 8,260.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 856,628.50 | | 1,126,041.65 | | 1,517,275.60 |
|