Proposal:H.014807.6
Parish:Jefferson Davis
Routes:LA 26
Description:LA 26: W RACCA RD - TRAILOR TOWN RD
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,029,009.29
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $5,756,224.42 |
| 2 | 00183 | R. E. Heidt Construction Co., LLC | $6,138,120.52 |
| 3 | 33663 | Glenn Lege Construction LLC | $7,777,182.33 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - R. E. Heidt Construction Co., LLC | - 3 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement Cross drain removal/replacement locations. | 245 | SQYD | 12.00 | 2,940.00 | 57.57 | 14,104.65 | 49.93 | 12,232.85 | | 0002 | 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS Cross drain removal/replacement locations. | 245 | SQYD | 12.00 | 2,940.00 | 57.57 | 14,104.65 | 49.93 | 12,232.85 | | 0003 | 202-02-06040 | Removal of Concrete Box Headwall Ex. headwall at 3 x 2 RCB at Sta. 76+75 | 1 | EACH | 1,500.00 | 1,500.00 | 12,625.00 | 12,625.00 | 11,423.10 | 11,423.10 | | 0004 | 202-02-14500 | Removal of Guard Rail | 1,129 | LNFT | 13.50 | 15,241.50 | 10.10 | 11,402.90 | 45.96 | 51,888.84 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 30" CMP | 50 | LNFT | 15.00 | 750.00 | 88.88 | 4,444.00 | 254.72 | 12,736.00 | | 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 48" CMP | 68 | LNFT | 15.00 | 1,020.00 | 88.88 | 6,043.84 | 190.39 | 12,946.52 | | 0007 | 203-03-00100 | Embankment | 15 | CUYD | 100.00 | 1,500.00 | 222.20 | 3,333.00 | 185.13 | 2,776.95 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 134 | CUYD | 90.00 | 12,060.00 | 150.00 | 20,100.00 | 217.11 | 29,092.74 | | 0009 | 203-10-00100 | Cleaning Existing Ditches | 120 | LNFT | 14.00 | 1,680.00 | 42.42 | 5,090.40 | 29.02 | 3,482.40 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 200.00 | 1,600.00 | 202.00 | 1,616.00 | 232.30 | 1,858.40 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 9,802 | LNFT | 0.82 | 8,037.64 | 1.84 | 18,035.68 | 2.32 | 22,740.64 | | 0012 | 502-01-00100 | Asphalt Concrete | 32,657.3 | TON | 123.00 | 4,016,847.90 | 120.00 | 3,918,876.00 | 157.26 | 5,135,687.00 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 604.9 | TON | 190.00 | 114,931.00 | 166.00 | 100,413.40 | 231.71 | 140,161.38 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 182,325 | SQYD | 2.97 | 541,505.25 | 3.55 | 647,253.75 | 1.87 | 340,947.75 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,854 | CUYD | 0.01 | -58.54 | 0.01 | -58.54 | 0.01 | -58.54 | | 0016 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 502 | SQYD | 190.00 | 95,380.00 | 158.00 | 79,316.00 | 192.78 | 96,775.56 | | 0017 | 701-02-01100 | Cross Drain Pipe Arch (54" Equiv. RCPA) | 144 | LNFT | 715.00 | 102,960.00 | 525.20 | 75,628.80 | 361.60 | 52,070.40 | | 0018 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 275 | LNFT | 155.00 | 42,625.00 | 85.85 | 23,608.75 | 180.03 | 49,508.25 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,350 | LNFT | 35.00 | 47,250.00 | 25.25 | 34,087.50 | 40.65 | 54,877.50 | | 0020 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 16 | EACH | 4,125.00 | 66,000.00 | 3,535.00 | 56,560.00 | 4,791.19 | 76,659.04 | | 0021 | 710-01-00120 | Flowable Fill (Non-Excavatable) | 281 | CUYD | 215.00 | 60,415.00 | 328.25 | 92,238.25 | 180.54 | 50,731.74 | | 0022 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 125 | SQYD | 156.00 | 19,500.00 | 181.80 | 22,725.00 | 140.49 | 17,561.25 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 85,000.00 | 85,000.00 | 132,000.00 | 132,000.00 | 357,768.87 | 357,768.87 | | 0024 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 450 | LNFT | 0.01 | 4.50 | 0.51 | 229.50 | 0.59 | 265.50 | | 0025 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 360 | LNFT | 0.01 | 3.60 | 0.51 | 183.60 | 0.59 | 212.40 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 21.852 | MILE | 650.00 | 14,203.80 | 600.00 | 13,111.20 | 787.80 | 17,215.01 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 19.875 | MILE | 1.00 | 19.88 | 505.00 | 10,036.88 | 580.75 | 11,542.41 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 49.444 | MILE | 1.00 | 49.44 | 808.00 | 39,950.75 | 929.20 | 45,943.36 | | 0029 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 24 | EACH | 1.00 | 24.00 | 20.20 | 484.80 | 23.23 | 557.52 | | 0030 | 724-01-00100 | Rumble Strips (Centerline) | 6.402 | MILE | 1,000.00 | 6,402.00 | 1,010.00 | 6,466.02 | 1,161.50 | 7,435.92 | | 0031 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 14.584 | MILE | 1,000.00 | 14,584.00 | 1,010.00 | 14,729.84 | 1,161.50 | 16,939.32 | | 0032 | 726-01-00100 | Bedding Material | 49.3 | CUYD | 129.00 | 6,359.70 | 277.75 | 13,693.08 | 118.17 | 5,825.78 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 435,000.00 | 435,000.00 | 363,481.73 | 363,481.73 | | 0034 | 729-16-00200 | Object Marker Assembly (Type 2) | 20 | EACH | 75.00 | 1,500.00 | 75.75 | 1,515.00 | 139.38 | 2,787.60 | | 0035 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 135.00 | 2,160.00 | 101.00 | 1,616.00 | 156.80 | 2,508.80 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,515 | EACH | 6.00 | 9,090.00 | 6.06 | 9,180.90 | 6.97 | 10,559.55 | | 0037 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 150 | LNFT | 3.00 | 450.00 | 3.03 | 454.50 | 3.48 | 522.00 | | 0038 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 480 | LNFT | 16.00 | 7,680.00 | 16.16 | 7,756.80 | 18.58 | 8,918.40 | | 0039 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 46 | LNFT | 17.00 | 782.00 | 17.17 | 789.82 | 19.75 | 908.50 | | 0040 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.482 | MILE | 5,500.00 | 90,651.00 | 5,555.00 | 91,557.51 | 6,388.25 | 105,291.14 | | 0041 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.625 | MILE | 2,750.00 | 18,218.75 | 2,777.50 | 18,400.94 | 3,194.13 | 21,161.11 | | 0042 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.367 | MILE | 11,000.00 | 4,037.00 | 11,110.00 | 4,077.37 | 12,776.50 | 4,688.98 | | 0043 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 350.00 | 2,800.00 | 353.50 | 2,828.00 | 406.53 | 3,252.24 | | 0044 | 739-01-00100 | Hydro-Seeding | 0.28 | ACRE | 13,500.00 | 3,780.00 | 3,888.50 | 1,088.78 | 9,292.00 | 2,601.76 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 12,500.00 | 12,500.00 | 408,780.23 | 408,780.23 | | 0046 | 805-16-02700 | Reinforced Concrete Box Culverts (Extension) 3 x 2 RCB at Sta. 76+75. | 4 | LNFT | 2,400.00 | 9,600.00 | 3,787.50 | 15,150.00 | 6,072.63 | 24,290.52 | | 0047 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 205.98 lbs. of reinforcement steel
2.5782 CY of concrete | 1 | EACH | 9,800.00 | 9,800.00 | 19,695.00 | 19,695.00 | 24,290.50 | 24,290.50 | | 0048 | 815-03-00200 | Joint Seal (Preformed Silicone) | 600 | LNFT | 155.00 | 93,000.00 | 156.55 | 93,930.00 | 207.91 | 124,746.00 | | 0049 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,920 | INLF | 2.50 | 4,800.00 | 1.75 | 3,360.00 | 1.31 | 2,515.20 | | 0050 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 136 | CUYD | 100.00 | 13,600.00 | 196.95 | 26,785.20 | 101.76 | 13,839.36 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,756,224.42 | | 6,138,120.52 | | 7,777,182.33 |
|