Proposal:H.013918.6
Parish:Caldwell, Catahoula, LaSalle
Routes:LA 126
Description:LA 126: LA 124 - LA 849 S.
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,000,776.74
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $4,764,092.59 |
| 2 | 12312 | Gilchrist Construction Company, LLC | $5,058,208.00 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $5,900,531.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Gilchrist Construction Company, LLC | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 25.2 | LUMP | 145,250.00 | 145,250.00 | 200,000.00 | 200,000.00 | 250,000.00 | 250,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 1,436 | LNFT | 14.00 | 20,104.00 | 15.00 | 21,540.00 | 35.00 | 50,260.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 148 | LNFT | 25.00 | 3,700.00 | 50.00 | 7,400.00 | 50.00 | 7,400.00 | | 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP, 30" RCP | 60 | LNFT | 25.00 | 1,500.00 | 50.00 | 3,000.00 | 50.00 | 3,000.00 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 422 | CUYD | 35.00 | 14,770.00 | 50.00 | 21,100.00 | 50.00 | 21,100.00 | | 0006 | 203-08-00100 | Geotextile Fabric | 55 | SQYD | 5.00 | 275.00 | 3.00 | 165.00 | 10.00 | 550.00 | | 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,631 | CUYD | 110.00 | 289,410.00 | 80.00 | 210,480.00 | 95.00 | 249,945.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 14,501.3 | TON | 142.00 | 2,059,184.60 | 150.00 | 2,175,195.00 | 195.00 | 2,827,753.50 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,461.5 | TON | 275.00 | 401,912.50 | 150.00 | 219,225.00 | 195.00 | 284,992.50 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 130,276 | SQYD | 3.00 | 390,828.00 | 3.00 | 390,828.00 | 4.50 | 586,242.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,429 | CUYD | 1.00 | -5,429.00 | 1.00 | -5,429.00 | 1.00 | -5,429.00 | | 0012 | 510-01-00001 | Pavement Patching 20" MINIMUM THICKNESS | 1,235 | SQYD | 210.00 | 259,350.00 | 250.00 | 308,750.00 | 300.00 | 370,500.00 | | 0013 | 701-05-02064 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW) | 200 | LNFT | 125.00 | 25,000.00 | 150.00 | 30,000.00 | 150.00 | 30,000.00 | | 0014 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 200 | LNFT | 310.00 | 62,000.00 | 325.00 | 65,000.00 | 300.00 | 60,000.00 | | 0015 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 32 | LNFT | 355.00 | 11,360.00 | 325.00 | 10,400.00 | 325.00 | 10,400.00 | | 0016 | 701-14-00100 | Cleaning Existing Pipes . | 52 | LNFT | 40.00 | 2,080.00 | 12.00 | 624.00 | 15.00 | 780.00 | | 0017 | 701-15-00100 | Concrete Collar | 29 | EACH | 2,100.00 | 60,900.00 | 3,000.00 | 87,000.00 | 3,000.00 | 87,000.00 | | 0018 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 504 | LNFT | 155.00 | 78,120.00 | 160.00 | 80,640.00 | 165.00 | 83,160.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 475 | LNFT | 35.00 | 16,625.00 | 40.00 | 19,000.00 | 40.00 | 19,000.00 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 135.00 | 40,500.00 | 137.00 | 41,100.00 | 145.00 | 43,500.00 | | 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 12 | EACH | 4,200.00 | 50,400.00 | 4,200.00 | 50,400.00 | 6,000.00 | 72,000.00 | | 0022 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 3,800.00 | 30,400.00 | 3,800.00 | 30,400.00 | 5,500.00 | 44,000.00 | | 0023 | 707-04-00100 | Asphalt Curb | 162 | LNFT | 76.00 | 12,312.00 | 100.00 | 16,200.00 | 20.00 | 3,240.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 22 | SQYD | 230.00 | 5,060.00 | 160.00 | 3,520.00 | 200.00 | 4,400.00 | | 0025 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 33 | SQYD | 260.00 | 8,580.00 | 210.00 | 6,930.00 | 250.00 | 8,250.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 93,000.00 | 93,000.00 | 157,000.00 | 157,000.00 | 100,000.00 | 100,000.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 22.359 | MILE | 154.00 | 3,443.29 | 300.00 | 6,707.70 | 300.00 | 6,707.70 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.769 | MILE | 700.00 | 2,638.30 | 600.00 | 2,261.40 | 800.00 | 3,015.20 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 85.435 | MILE | 900.00 | 76,891.50 | 700.00 | 59,804.50 | 900.00 | 76,891.50 | | 0030 | 726-01-00100 | Bedding Material | 86.5 | CUYD | 180.00 | 15,570.00 | 200.00 | 17,300.00 | 175.00 | 15,137.50 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 340,000.00 | 340,000.00 | 500,000.00 | 500,000.00 | 250,000.00 | 250,000.00 | | 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 46 | EACH | 125.00 | 5,750.00 | 130.00 | 5,980.00 | 130.00 | 5,980.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 135.00 | 2,700.00 | 140.00 | 2,800.00 | 140.00 | 2,800.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,708 | EACH | 5.00 | 13,540.00 | 5.00 | 13,540.00 | 7.50 | 20,310.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 42.718 | MILE | 4,300.00 | 183,687.40 | 4,200.00 | 179,415.60 | 6,000.00 | 256,308.00 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.884 | MILE | 1,300.00 | 2,449.20 | 1,300.00 | 2,449.20 | 2,000.00 | 3,768.00 | | 0037 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.138 | MILE | 9,100.00 | 1,255.80 | 700.00 | 96.60 | 15,000.00 | 2,070.00 | | 0038 | 732-05-00100 | Removal of Existing Markings Bridge Decks and Approaches | 0.029 | MILE | 15,000.00 | 435.00 | 25,000.00 | 725.00 | 15,000.00 | 435.00 | | 0039 | 732-05-00100 | Removal of Existing Markings Bridge Locations | 0.048 | MILE | 15,000.00 | 720.00 | 25,000.00 | 1,200.00 | 15,000.00 | 720.00 | | 0040 | 735-01-00100 | Mailboxes | 39 | EACH | 30.00 | 1,170.00 | 40.00 | 1,560.00 | 30.00 | 1,170.00 | | 0041 | 735-02-00100 | Mailbox Supports (Single) | 31 | EACH | 250.00 | 7,750.00 | 300.00 | 9,300.00 | 325.00 | 10,075.00 | | 0042 | 735-03-00100 | Mailbox Supports (Double) | 4 | EACH | 350.00 | 1,400.00 | 400.00 | 1,600.00 | 400.00 | 1,600.00 | | 0043 | 739-01-00100 | Hydro-Seeding | 0.05 | ACRE | 50,000.00 | 2,500.00 | 60,000.00 | 3,000.00 | 30,000.00 | 1,500.00 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 | 30,000.00 | 30,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,764,092.59 | | 5,058,208.00 | | 5,900,531.90 |
|