Search


Bid Tabulations for the Letting of 10/15/2025 LA DOTD Headquarters

Proposal:H.012711.6
Parish:Lincoln, Union
Routes:LA 151
Description:LA 151: LA 145 - LA 33
Type Construction:CLEARING AND GRUBBING, BORROW, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,870,303.18
Rank License BidderConstruction Bid
112487Diamond B Construction Co., L.L.C.$4,123,261.31
205789D & J CONSTRUCTION CO., LLC$5,102,316.30


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
D & J CONSTRUCTION CO., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 0.092 LUMP7,500.007,500.0050,000.0050,000.00
0002201-01-00200Clearing and Grubbing (Selective) 11.821 LUMP52,000.0052,000.00250,000.00250,000.00
0003202-01-00100Removal of Structures and Obstructions (CROSS DRAINS)1     LUMP15,000.0015,000.0020,000.0020,000.00
0004202-02-06100Removal of Concrete Walks and Drives 88     SQYD25.002,200.0025.002,200.00
0005202-02-14500Removal of Guard Rail 555     LNFT13.007,215.0030.0016,650.00
0006203-07-00100Borrow (Vehicular Measurement) 3,376     CUYD10.0033,760.0040.00135,040.00
0007203-10-00100Cleaning Existing Ditches 750     LNFT10.007,500.0035.0026,250.00
0008204-06-00100Temporary Silt Fencing 1,615     LNFT4.006,460.007.0011,305.00
0009303-01-00200In-Place Cement Stabilized Base Course (8-1/2" Thick) 57,405     SQYD16.00918,480.0018.001,033,290.00
0010303-02-00100Removal of Existing Patches 333     SQYD10.003,330.0025.008,325.00
0011401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 1,234     CUYD200.00246,800.00195.00240,630.00
0012402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 147     CUYD65.009,555.00200.0029,400.00
0013502-01-00100Asphalt Concrete 10,630.4   TON154.001,637,081.60210.002,232,384.00
0014502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 529     TON325.00171,925.00245.00129,605.00
0015509-01-00100Milling Asphalt Pavement 4,666     SQYD5.5025,663.005.0023,330.00
0016509-02-00100Contractor Retained Reclaimed Asphalt Pavement -194     CUYD1.00-194.001.00-194.00
0017701-01-02008Cross Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW or 30" CMP) 136     LNFT295.0040,120.00400.0054,400.00
0018701-01-02044Cross Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW or 36" CMP) 104     LNFT355.0036,920.00425.0044,200.00
0019701-01-02084Cross Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW or 42" CMP) 48     LNFT385.0018,480.00500.0024,000.00
0020701-01-02122Cross Drain Pipe (42" RCP/RPVCP or 48" CMP) 96     LNFT400.0038,400.00600.0057,600.00
0021701-10-01060Reinforced Concrete Pipe (Extension) (24") 24     LNFT295.007,080.00325.007,800.00
0022701-10-01080Reinforced Concrete Pipe (Extension) (30") 16     LNFT300.004,800.00350.005,600.00
0023701-14-00100Cleaning Existing Pipes .40     LNFT40.001,600.0040.001,600.00
0024701-15-00100Concrete Collar 23     EACH2,200.0050,600.002,000.0046,000.00
0025701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 328     LNFT10.003,280.007.002,296.00
0026704-03-00100Blocked Out Guard rail 31.3   LNFT45.001,408.5050.001,565.00
0027704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 262.5   LNFT35.009,187.5040.0010,500.00
0028704-05-00100Guard Rail Anchor Sections (Trailing End) 6.3   LNFT175.001,102.50185.001,165.50
0029704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT135.0013,500.00150.0015,000.00
0030704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 3     EACH3,800.0011,400.007,500.0022,500.00
0031706-02-00200Concrete Drive (6" Thick) 88.4   SQYD175.0015,470.00250.0022,100.00
0032711-01-04020Riprap (55 lb, 24" Thick) 100     SQYD175.0017,500.00300.0030,000.00
0033711-04-00100Geotextile Fabric 100     SQYD8.00800.0010.001,000.00
0034713-01-00100Temporary Signs and Barricades 1     LUMP75,000.0075,000.0075,000.0075,000.00
0035713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 9.428 MILE154.001,451.91250.002,357.00
0036713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 37.712 MILE900.0033,940.80900.0033,940.80
0037716-01-00100Mulch (Vegetative) 7.7   TON875.006,737.501,000.007,700.00
0038717-01-00100Seeding 231     LB14.003,234.0020.004,620.00
0039718-01-00100Fertilizer 3,865     LB1.003,865.001.003,865.00
0040722-02-00100Project Site Laboratory (Equipped) 1     EACH16,000.0016,000.0015,000.0015,000.00
0041726-01-00100Bedding Material 183     CUYD175.0032,025.00150.0027,450.00
0042727-01-00100Mobilization 1     LUMP385,000.00385,000.00225,000.00225,000.00
0043729-16-00200Object Marker Assembly (Type 2) 28     EACH120.003,360.00150.004,200.00
0044729-16-00300Object Marker Assembly (Type 3) 8     EACH136.001,088.00160.001,280.00
0045731-02-00100Reflectorized Raised Pavement Markers 1,244     EACH5.006,220.008.009,952.00
0046732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 18.856 MILE4,500.0084,852.005,000.0094,280.00
0047732-05-00100Removal of Existing Markings 0.011 MILE25,000.00275.0025,000.00275.00
0048735-01-00100Mailboxes 21     EACH20.00420.0030.00630.00
0049735-02-00100Mailbox Supports (Single) 15     EACH500.007,500.00325.004,875.00
0050735-03-00100Mailbox Supports (Double) 3     EACH456.001,368.00450.001,350.00
0051740-01-00100Construction Layout 1     LUMP45,000.0045,000.0035,000.0035,000.00
         
  CONTRACTOR TOTAL   4,123,261.31 5,102,316.30