Proposal:H.012711.6
Parish:Lincoln, Union
Routes:LA 151
Description:LA 151: LA 145 - LA 33
Type Construction:CLEARING AND GRUBBING, BORROW, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,870,303.18
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $4,123,261.31 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $5,102,316.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.092 | LUMP | 7,500.00 | 7,500.00 | 50,000.00 | 50,000.00 | | 0002 | 201-01-00200 | Clearing and Grubbing (Selective) | 11.821 | LUMP | 52,000.00 | 52,000.00 | 250,000.00 | 250,000.00 | | 0003 | 202-01-00100 | Removal of Structures and Obstructions (CROSS DRAINS) | 1 | LUMP | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 88 | SQYD | 25.00 | 2,200.00 | 25.00 | 2,200.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 555 | LNFT | 13.00 | 7,215.00 | 30.00 | 16,650.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,376 | CUYD | 10.00 | 33,760.00 | 40.00 | 135,040.00 | | 0007 | 203-10-00100 | Cleaning Existing Ditches | 750 | LNFT | 10.00 | 7,500.00 | 35.00 | 26,250.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,615 | LNFT | 4.00 | 6,460.00 | 7.00 | 11,305.00 | | 0009 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 57,405 | SQYD | 16.00 | 918,480.00 | 18.00 | 1,033,290.00 | | 0010 | 303-02-00100 | Removal of Existing Patches | 333 | SQYD | 10.00 | 3,330.00 | 25.00 | 8,325.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,234 | CUYD | 200.00 | 246,800.00 | 195.00 | 240,630.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 147 | CUYD | 65.00 | 9,555.00 | 200.00 | 29,400.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 10,630.4 | TON | 154.00 | 1,637,081.60 | 210.00 | 2,232,384.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 529 | TON | 325.00 | 171,925.00 | 245.00 | 129,605.00 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 4,666 | SQYD | 5.50 | 25,663.00 | 5.00 | 23,330.00 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -194 | CUYD | 1.00 | -194.00 | 1.00 | -194.00 | | 0017 | 701-01-02008 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW or 30" CMP) | 136 | LNFT | 295.00 | 40,120.00 | 400.00 | 54,400.00 | | 0018 | 701-01-02044 | Cross Drain Pipe (30" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW or 36" CMP) | 104 | LNFT | 355.00 | 36,920.00 | 425.00 | 44,200.00 | | 0019 | 701-01-02084 | Cross Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW or 42" CMP) | 48 | LNFT | 385.00 | 18,480.00 | 500.00 | 24,000.00 | | 0020 | 701-01-02122 | Cross Drain Pipe (42" RCP/RPVCP or 48" CMP) | 96 | LNFT | 400.00 | 38,400.00 | 600.00 | 57,600.00 | | 0021 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 24 | LNFT | 295.00 | 7,080.00 | 325.00 | 7,800.00 | | 0022 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 16 | LNFT | 300.00 | 4,800.00 | 350.00 | 5,600.00 | | 0023 | 701-14-00100 | Cleaning Existing Pipes . | 40 | LNFT | 40.00 | 1,600.00 | 40.00 | 1,600.00 | | 0024 | 701-15-00100 | Concrete Collar | 23 | EACH | 2,200.00 | 50,600.00 | 2,000.00 | 46,000.00 | | 0025 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 328 | LNFT | 10.00 | 3,280.00 | 7.00 | 2,296.00 | | 0026 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 45.00 | 1,408.50 | 50.00 | 1,565.00 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 262.5 | LNFT | 35.00 | 9,187.50 | 40.00 | 10,500.00 | | 0028 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 175.00 | 1,102.50 | 185.00 | 1,165.50 | | 0029 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 135.00 | 13,500.00 | 150.00 | 15,000.00 | | 0030 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,800.00 | 11,400.00 | 7,500.00 | 22,500.00 | | 0031 | 706-02-00200 | Concrete Drive (6" Thick) | 88.4 | SQYD | 175.00 | 15,470.00 | 250.00 | 22,100.00 | | 0032 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 100 | SQYD | 175.00 | 17,500.00 | 300.00 | 30,000.00 | | 0033 | 711-04-00100 | Geotextile Fabric | 100 | SQYD | 8.00 | 800.00 | 10.00 | 1,000.00 | | 0034 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.428 | MILE | 154.00 | 1,451.91 | 250.00 | 2,357.00 | | 0036 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 37.712 | MILE | 900.00 | 33,940.80 | 900.00 | 33,940.80 | | 0037 | 716-01-00100 | Mulch (Vegetative) | 7.7 | TON | 875.00 | 6,737.50 | 1,000.00 | 7,700.00 | | 0038 | 717-01-00100 | Seeding | 231 | LB | 14.00 | 3,234.00 | 20.00 | 4,620.00 | | 0039 | 718-01-00100 | Fertilizer | 3,865 | LB | 1.00 | 3,865.00 | 1.00 | 3,865.00 | | 0040 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 16,000.00 | 16,000.00 | 15,000.00 | 15,000.00 | | 0041 | 726-01-00100 | Bedding Material | 183 | CUYD | 175.00 | 32,025.00 | 150.00 | 27,450.00 | | 0042 | 727-01-00100 | Mobilization | 1 | LUMP | 385,000.00 | 385,000.00 | 225,000.00 | 225,000.00 | | 0043 | 729-16-00200 | Object Marker Assembly (Type 2) | 28 | EACH | 120.00 | 3,360.00 | 150.00 | 4,200.00 | | 0044 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 136.00 | 1,088.00 | 160.00 | 1,280.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,244 | EACH | 5.00 | 6,220.00 | 8.00 | 9,952.00 | | 0046 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.856 | MILE | 4,500.00 | 84,852.00 | 5,000.00 | 94,280.00 | | 0047 | 732-05-00100 | Removal of Existing Markings | 0.011 | MILE | 25,000.00 | 275.00 | 25,000.00 | 275.00 | | 0048 | 735-01-00100 | Mailboxes | 21 | EACH | 20.00 | 420.00 | 30.00 | 630.00 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 15 | EACH | 500.00 | 7,500.00 | 325.00 | 4,875.00 | | 0050 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 456.00 | 1,368.00 | 450.00 | 1,350.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 35,000.00 | 35,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,123,261.31 | | 5,102,316.30 |
|