Proposal:H.012167.6
Parish:Catahoula
Routes:US 84
Description:US 84: LA 3037 - LA 124
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, DRAINAGE STRUCTURES, ASPHALT CONCRETE OVERLAY, ASPHALT SURFACE TREATMENT, AND RELATED WORK.
Estimated Construction Cost:$1,676,449.84
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,789,301.85 |
| 2 | 12312 | Gilchrist Construction Company, LLC | $2,008,680.70 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $2,204,078.95 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Gilchrist Construction Company, LLC | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-32120 | Removal of Pipe (Side Drain) 18" RCP | 30 | LNFT | 50.00 | 1,500.00 | 60.00 | 1,800.00 | 50.00 | 1,500.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 48.00 | 4,800.00 | 50.00 | 5,000.00 | 40.00 | 4,000.00 | | 0003 | 204-06-00100 | Temporary Silt Fencing | 100 | LNFT | 30.00 | 3,000.00 | 40.00 | 4,000.00 | 7.00 | 700.00 | | 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 111 | CUYD | 155.00 | 17,205.00 | 200.00 | 22,200.00 | 125.00 | 13,875.00 | | 0005 | 502-01-00100 | Asphalt Concrete | 5,221.2 | TON | 160.00 | 835,392.00 | 175.00 | 913,710.00 | 200.00 | 1,044,240.00 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 601.9 | TON | 375.00 | 225,712.50 | 175.00 | 105,332.50 | 225.00 | 135,427.50 | | 0007 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 18,856 | GAL | 4.25 | 80,138.00 | 5.00 | 94,280.00 | 5.00 | 94,280.00 | | 0008 | 507-02-00300 | Aggregate (S3) | 60,828 | SQYD | 1.55 | 94,283.40 | 1.75 | 106,449.00 | 3.00 | 182,484.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 48,487 | SQYD | 3.55 | 172,128.85 | 5.00 | 242,435.00 | 6.00 | 290,922.00 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,019 | CUYD | 1.00 | -2,019.00 | 1.00 | -2,019.00 | 1.00 | -2,019.00 | | 0011 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 150 | SQYD | 325.00 | 48,750.00 | 400.00 | 60,000.00 | 600.00 | 90,000.00 | | 0012 | 701-03-01004 | Storm Drain Pipe (15" RCP/RPVCP/CPPPDW) | 4 | LNFT | 165.00 | 660.00 | 200.00 | 800.00 | 300.00 | 1,200.00 | | 0013 | 701-05-01045 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW) | 80 | LNFT | 80.00 | 6,400.00 | 100.00 | 8,000.00 | 100.00 | 8,000.00 | | 0014 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 5,800.00 | 5,800.00 | 8,000.00 | 8,000.00 | 6,000.00 | 6,000.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 38,000.00 | 38,000.00 | 100,000.00 | 100,000.00 | 70,000.00 | 70,000.00 | | 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.535 | MILE | 140.00 | 494.90 | 500.00 | 1,767.50 | 250.00 | 883.75 | | 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.386 | MILE | 600.00 | 3,231.60 | 700.00 | 3,770.20 | 800.00 | 4,308.80 | | 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.056 | MILE | 900.00 | 16,250.40 | 1,000.00 | 18,056.00 | 900.00 | 16,250.40 | | 0019 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 10 | EACH | 25.00 | 250.00 | 25.00 | 250.00 | 25.00 | 250.00 | | 0020 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 10 | EACH | 25.00 | 250.00 | 25.00 | 250.00 | 25.00 | 250.00 | | 0021 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 935 | EACH | 2.50 | 2,337.50 | 3.00 | 2,805.00 | 3.50 | 3,272.50 | | 0022 | 716-01-00100 | Mulch (Vegetative) | 0.1 | TON | 25,000.00 | 2,500.00 | 35,000.00 | 3,500.00 | 5,000.00 | 500.00 | | 0023 | 717-01-00100 | Seeding | 2 | LB | 131.00 | 262.00 | 17.00 | 34.00 | 50.00 | 100.00 | | 0024 | 718-01-00100 | Fertilizer | 40 | LB | 5.00 | 200.00 | 1.00 | 40.00 | 5.00 | 200.00 | | 0025 | 726-01-00100 | Bedding Material | 11.4 | CUYD | 205.00 | 2,337.00 | 250.00 | 2,850.00 | 200.00 | 2,280.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 170,000.00 | 170,000.00 | 200,000.00 | 200,000.00 | 150,000.00 | 150,000.00 | | 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 581 | EACH | 5.00 | 2,905.00 | 7.00 | 4,067.00 | 8.00 | 4,648.00 | | 0028 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 450 | LNFT | 15.00 | 6,750.00 | 17.00 | 7,650.00 | 20.00 | 9,000.00 | | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.028 | MILE | 4,300.00 | 38,820.40 | 5,700.00 | 51,459.60 | 5,000.00 | 45,140.00 | | 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.693 | MILE | 1,100.00 | 2,962.30 | 2,300.00 | 6,193.90 | 2,000.00 | 5,386.00 | | 0031 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 350.00 | 1,750.00 | 400.00 | 2,000.00 | 600.00 | 3,000.00 | | 0032 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 5 | EACH | 350.00 | 1,750.00 | 400.00 | 2,000.00 | 600.00 | 3,000.00 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,500.00 | 4,500.00 | 32,000.00 | 32,000.00 | 15,000.00 | 15,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,789,301.85 | | 2,008,680.70 | | 2,204,078.95 |
|