Proposal:H.016375.6
Parish:LaSalle
Routes:US 84
Description:US 84: JCT. US 165 - OLLA FIELD RD.
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,680,839.76
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $4,043,722.06 |
| 2 | 12312 | Gilchrist Construction Company, LLC | $4,246,439.00 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $5,300,874.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Gilchrist Construction Company, LLC | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) APPROX. 0.610 ACRES | 0.61 | LUMP | 50,000.00 | 50,000.00 | 125,000.00 | 125,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement GUARD RAIL PADS | 646.6 | SQYD | 45.00 | 29,097.00 | 16.00 | 10,345.60 | 15.00 | 9,699.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 814 | LNFT | 14.00 | 11,396.00 | 10.00 | 8,140.00 | 25.00 | 20,350.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 8 | CUYD | 18.00 | 144.00 | 250.00 | 2,000.00 | 100.00 | 800.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 168 | CUYD | 200.00 | 33,600.00 | 135.00 | 22,680.00 | 100.00 | 16,800.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 15,853.2 | TON | 140.00 | 2,219,448.00 | 130.00 | 2,060,916.00 | 185.00 | 2,932,842.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 514.5 | TON | 249.00 | 128,110.50 | 130.00 | 66,885.00 | 285.00 | 146,632.50 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 160,133 | SQYD | 3.00 | 480,399.00 | 2.50 | 400,332.50 | 4.00 | 640,532.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,364 | CUYD | 1.00 | -3,364.00 | 1.00 | -3,364.00 | 1.00 | -3,364.00 | | 0010 | 510-01-00001 | Pavement Patching 9" MINIMUM THICKNESS | 350 | SQYD | 170.00 | 59,500.00 | 145.00 | 50,750.00 | 220.00 | 77,000.00 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 800 | SQYD | 170.00 | 136,000.00 | 155.00 | 124,000.00 | 280.00 | 224,000.00 | | 0012 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 250 | LNFT | 37.00 | 9,250.00 | 31.00 | 7,750.00 | 40.00 | 10,000.00 | | 0013 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 78.00 | 7,800.00 | 67.00 | 6,700.00 | 100.00 | 10,000.00 | | 0014 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 135.00 | 27,000.00 | 116.00 | 23,200.00 | 150.00 | 30,000.00 | | 0015 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 3,800.00 | 30,400.00 | 3,100.00 | 24,800.00 | 5,000.00 | 40,000.00 | | 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 92,000.00 | 92,000.00 | 114,000.00 | 114,000.00 | 100,000.00 | 100,000.00 | | 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.762 | MILE | 155.00 | 2,133.11 | 300.00 | 4,128.60 | 300.00 | 4,128.60 | | 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.975 | MILE | 650.00 | 5,833.75 | 600.00 | 5,385.00 | 600.00 | 5,385.00 | | 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 42.404 | MILE | 850.00 | 36,043.40 | 1,000.00 | 42,404.00 | 800.00 | 33,923.20 | | 0020 | 724-01-00100 | Rumble Strips (Centerline) | 6.824 | MILE | 1,000.00 | 6,824.00 | 1,000.00 | 6,824.00 | 1,200.00 | 8,188.80 | | 0021 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 13.648 | MILE | 1,000.00 | 13,648.00 | 1,000.00 | 13,648.00 | 1,200.00 | 16,377.60 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 210,000.00 | 210,000.00 | 420,000.00 | 420,000.00 | 250,000.00 | 250,000.00 | | 0023 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 130.00 | 1,040.00 | 100.00 | 800.00 | 135.00 | 1,080.00 | | 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,225 | EACH | 5.00 | 6,125.00 | 6.00 | 7,350.00 | 6.00 | 7,350.00 | | 0025 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 21.202 | MILE | 4,300.00 | 91,168.60 | 6,000.00 | 127,212.00 | 5,500.00 | 116,611.00 | | 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.487 | MILE | 1,500.00 | 6,730.50 | 1,900.00 | 8,525.30 | 2,000.00 | 8,974.00 | | 0027 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.131 | MILE | 6,500.00 | 851.50 | 3,000.00 | 393.00 | 7,500.00 | 982.50 | | 0028 | 732-05-00100 | Removal of Existing Markings | 0.057 | MILE | 9,300.00 | 530.10 | 100,000.00 | 5,700.00 | 25,000.00 | 1,425.00 | | 0029 | 735-01-00100 | Mailboxes | 7 | EACH | 50.00 | 350.00 | 50.00 | 350.00 | 50.00 | 350.00 | | 0030 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 350.00 | 2,450.00 | 360.00 | 2,520.00 | 500.00 | 3,500.00 | | 0031 | 739-01-00100 | Hydro-Seeding | 0.02 | ACRE | 25,000.00 | 500.00 | 100,000.00 | 2,000.00 | 25,000.00 | 500.00 | | 0032 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 100,000.00 | 100,000.00 | 25,000.00 | 25,000.00 | | 0033 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 108,090 | LNFT | 1.45 | 156,730.50 | 2.00 | 216,180.00 | 2.00 | 216,180.00 | | 0034 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 43,598 | LNFT | 1.45 | 63,217.10 | 2.00 | 87,196.00 | 2.25 | 98,095.50 | | 0035 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 151,688 | LNFT | 0.75 | 113,766.00 | 1.00 | 151,688.00 | 1.50 | 227,532.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,043,722.06 | | 4,246,439.00 | | 5,300,874.70 |
|