Proposal:H.015880.6
Parish:Calcasieu
Routes:US 90
Description:US 90: LA 397 - JEFFERSON DAVIS P/L
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, REINFORCING PAVING MAT, AND RELATED WORK.
Estimated Construction Cost:$8,697,980.50
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $8,333,197.99 |
| 2 | 00183 | R. E. Heidt Construction Co., LLC | $8,624,603.64 |
| 3 | 12312 | Gilchrist Construction Company, LLC | $12,195,365.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - R. E. Heidt Construction Co., LLC | - 3 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions Remove existing asphalt, signs, and guardrail W-beam used at double 48" cross drain. | 1 | LUMP | 3,000.00 | 3,000.00 | 3,787.50 | 3,787.50 | 25,000.00 | 25,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 3,409 | LNFT | 13.50 | 46,021.50 | 5.60 | 19,090.40 | 6.00 | 20,454.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) 48" pipe segments at Sta. 347+19 & Sta. 347+25. | 10 | LNFT | 30.00 | 300.00 | 101.00 | 1,010.00 | 400.00 | 4,000.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) Pipe segment at Sta. 85+ 54 and driveway culvert at Sta. 111+72. | 44 | LNFT | 20.00 | 880.00 | 101.00 | 4,444.00 | 100.00 | 4,400.00 | | 0005 | 203-01-00100 | General Excavation | 1 | CUYD | 650.00 | 650.00 | 151.50 | 151.50 | 20,000.00 | 20,000.00 | | 0006 | 203-03-00100 | Embankment | 62 | CUYD | 45.00 | 2,790.00 | 75.75 | 4,696.50 | 150.00 | 9,300.00 | | 0007 | 203-04-00300 | Nonplastic Embankment (Stone) | 25 | CUYD | 175.00 | 4,375.00 | 303.00 | 7,575.00 | 200.00 | 5,000.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) For superelevation and foreslope tie-ins. | 230 | CUYD | 60.00 | 13,800.00 | 225.00 | 51,750.00 | 350.00 | 80,500.00 | | 0009 | 203-08-00100 | Geotextile Fabric | 59 | SQYD | 6.00 | 354.00 | 30.30 | 1,787.70 | 100.00 | 5,900.00 | | 0010 | 203-10-00100 | Cleaning Existing Ditches Required south of US 90 at Sta. 348+20 cross drain extension. | 20 | LNFT | 80.00 | 1,600.00 | 202.00 | 4,040.00 | 300.00 | 6,000.00 | | 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 185.00 | 1,480.00 | 146.45 | 1,171.60 | 200.00 | 1,600.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 3,628 | LNFT | 2.00 | 7,256.00 | 1.92 | 6,965.76 | 2.50 | 9,070.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 40,674.5 | TON | 116.50 | 4,738,579.25 | 118.00 | 4,799,591.00 | 160.00 | 6,507,920.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,793 | TON | 185.00 | 331,705.00 | 175.00 | 313,775.00 | 160.00 | 286,880.00 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 162,441 | SQYD | 3.50 | 568,543.50 | 2.95 | 479,200.95 | 6.00 | 974,646.00 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -7,705 | CUYD | 0.01 | -77.05 | 0.01 | -77.05 | 1.00 | -7,705.00 | | 0017 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 3,071 | SQYD | 175.00 | 537,425.00 | 145.00 | 445,295.00 | 225.00 | 690,975.00 | | 0018 | 701-05-01066 | Side Drain Pipe (24" RCP) | 48 | LNFT | 325.00 | 15,600.00 | 383.80 | 18,422.40 | 500.00 | 24,000.00 | | 0019 | 701-10-01140 | Reinforced Concrete Pipe (Extension) (48") | 12 | LNFT | 800.00 | 9,600.00 | 909.00 | 10,908.00 | 1,200.00 | 14,400.00 | | 0020 | 701-15-00100 | Concrete Collar | 3 | EACH | 3,000.00 | 9,000.00 | 3,434.00 | 10,302.00 | 7,000.00 | 21,000.00 | | 0021 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 450 | LNFT | 90.00 | 40,500.00 | 62.62 | 28,179.00 | 63.00 | 28,350.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 2,368.8 | LNFT | 35.00 | 82,908.00 | 29.55 | 69,998.04 | 31.00 | 73,432.80 | | 0023 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 135.00 | 27,000.00 | 117.16 | 23,432.00 | 120.00 | 24,000.00 | | 0024 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,650.00 | 3,650.00 | 2,676.50 | 2,676.50 | 2,800.00 | 2,800.00 | | 0025 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 21 | EACH | 4,050.00 | 85,050.00 | 3,358.25 | 70,523.25 | 3,500.00 | 73,500.00 | | 0026 | 710-01-00100 | Flowable Fill | 4.4 | CUYD | 285.00 | 1,254.00 | 555.50 | 2,444.20 | 2,000.00 | 8,800.00 | | 0027 | 711-03-00300 | Riprap (30 lb) | 70 | TON | 155.00 | 10,850.00 | 252.50 | 17,675.00 | 300.00 | 21,000.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 100,000.00 | 100,000.00 | 225,000.00 | 225,000.00 | | 0029 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,062 | LNFT | 0.01 | 10.62 | 0.51 | 541.62 | 0.60 | 637.20 | | 0030 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 402 | LNFT | 0.01 | 4.02 | 0.51 | 205.02 | 0.60 | 241.20 | | 0031 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 17.208 | MILE | 5,000.00 | 86,040.00 | 800.00 | 13,766.40 | 300.00 | 5,162.40 | | 0032 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 17.713 | MILE | 1.00 | 17.71 | 656.50 | 11,628.58 | 700.00 | 12,399.10 | | 0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 64.801 | MILE | 1.00 | 64.80 | 1,035.25 | 67,085.24 | 1,100.00 | 71,281.10 | | 0034 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 6 | EACH | 1.00 | 6.00 | 50.50 | 303.00 | 50.00 | 300.00 | | 0035 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 9 | EACH | 1.00 | 9.00 | 50.50 | 454.50 | 50.00 | 450.00 | | 0036 | 714-01-00600 | Slab Sodding (St. Augustine) | 20 | SQYD | 75.00 | 1,500.00 | 25.25 | 505.00 | 50.00 | 1,000.00 | | 0037 | 724-01-00100 | Rumble Strips (Centerline) | 7.774 | MILE | 1,000.00 | 7,774.00 | 1,010.00 | 7,851.74 | 1,200.00 | 9,328.80 | | 0038 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 15.813 | MILE | 1,000.00 | 15,813.00 | 1,010.00 | 15,971.13 | 1,200.00 | 18,975.60 | | 0039 | 726-01-00100 | Bedding Material | 5.3 | CUYD | 160.00 | 848.00 | 262.60 | 1,391.78 | 200.00 | 1,060.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 450,000.00 | 450,000.00 | 685,000.00 | 685,000.00 | 1,200,000.00 | 1,200,000.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 22 | EACH | 135.00 | 2,970.00 | 85.85 | 1,888.70 | 90.00 | 1,980.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,488 | EACH | 5.00 | 7,440.00 | 5.05 | 7,514.40 | 6.00 | 8,928.00 | | 0043 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 354 | LNFT | 3.00 | 1,062.00 | 3.03 | 1,072.62 | 4.00 | 1,416.00 | | 0044 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 360 | LNFT | 11.00 | 3,960.00 | 11.11 | 3,999.60 | 12.00 | 4,320.00 | | 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 14 | LNFT | 11.00 | 154.00 | 11.11 | 155.54 | 12.00 | 168.00 | | 0046 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 1,000 | LNFT | 0.75 | 750.00 | 0.76 | 760.00 | 1.00 | 1,000.00 | | 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 21.601 | MILE | 5,850.00 | 126,365.85 | 5,908.50 | 127,629.51 | 6,000.00 | 129,606.00 | | 0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.904 | MILE | 1,500.00 | 8,856.00 | 1,515.00 | 8,944.56 | 1,600.00 | 9,446.40 | | 0049 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.068 | MILE | 9,500.00 | 646.00 | 9,595.00 | 652.46 | 9,000.00 | 612.00 | | 0050 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 300.00 | 600.00 | 303.00 | 606.00 | 400.00 | 800.00 | | 0051 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 300.00 | 900.00 | 303.00 | 909.00 | 400.00 | 1,200.00 | | 0052 | 732-05-00100 | Removal of Existing Markings For PCC bridge decks | 0.05 | MILE | 5,500.00 | 275.00 | 5,555.00 | 277.75 | 100,000.00 | 5,000.00 | | 0053 | 735-01-00100 | Mailboxes | 97 | EACH | 35.00 | 3,395.00 | 1.01 | 97.97 | 30.00 | 2,910.00 | | 0054 | 735-02-00100 | Mailbox Supports (Single) | 67 | EACH | 250.00 | 16,750.00 | 282.80 | 18,947.60 | 210.00 | 14,070.00 | | 0055 | 735-03-00100 | Mailbox Supports (Double) | 15 | EACH | 400.00 | 6,000.00 | 282.80 | 4,242.00 | 360.00 | 5,400.00 | | 0056 | 739-01-00100 | Hydro-Seeding | 0.09 | ACRE | 30,000.00 | 2,700.00 | 10,100.00 | 909.00 | 35,000.00 | 3,150.00 | | 0057 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 150,000.00 | 150,000.00 | | 0058 | 805-01-00500 | Class A1 Concrete (Footing) | 0.44 | CUYD | 17,500.00 | 7,700.00 | 8,938.50 | 3,932.94 | 25,000.00 | 11,000.00 | | 0059 | 806-01-00100 | Deformed Reinforcing Steel | 22.097 | LB | 12.00 | 265.16 | 10.10 | 223.18 | 100.00 | 2,209.70 | | 0060 | NS-401-00100 | Hot-Mix Asphalt Aggregate Surface Course Slope protection at 48" RCP cross drains at Sta. 347+20 | 70 | TON | 300.00 | 21,000.00 | 320.00 | 22,400.00 | 220.00 | 15,400.00 | | 0061 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 108,098 | SQYD | 4.25 | 459,416.50 | 4.30 | 464,821.40 | 6.00 | 648,588.00 | | 0062 | NS-502-04210 | Asphalt Tack Coat | 25,943.5 | GAL | 4.75 | 123,231.63 | 4.80 | 124,528.80 | 8.00 | 207,548.00 | | 0063 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 44,505 | SQYD | 5.90 | 262,579.50 | 11.27 | 501,571.35 | 11.00 | 489,555.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,333,197.99 | | 8,624,603.64 | | 12,195,365.30 |
|