Proposal:H.015875.6
Parish:Bienville, Claiborne
Routes:LA 9
Description:LA 9: I-20 TO LA 518
Type Construction:BORROW, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$12,456,868.09
| Rank | License | Bidder | Construction Bid |
| 1 | 08584 | Madden Contracting Co., LLC | $11,325,914.81 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | | Unit Price | Total Amount | | 0001 | 202-02-04560 | Removal of Bridge Joint Joint Removal | 2,193 | LNFT | 14.18 | 31,096.74 | | 0002 | 202-02-14500 | Removal of Guard Rail | 1,239 | LNFT | 13.00 | 16,107.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 39,069 | CUYD | 5.00 | 195,345.00 | | 0004 | 204-06-00100 | Temporary Silt Fencing | 2,134 | LNFT | 4.00 | 8,536.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4 | CUYD | 100.00 | 400.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 50,504.4 | TON | 147.75 | 7,462,025.10 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 823.3 | TON | 105.50 | 86,858.15 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 182,674 | SQYD | 5.55 | 1,013,840.70 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -8,634 | CUYD | 0.10 | -863.40 | | 0010 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 1,250 | SQYD | 156.50 | 195,625.00 | | 0011 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 962.8 | LNFT | 36.00 | 34,660.80 | | 0012 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 135.00 | 40,500.00 | | 0013 | 704-09-00100 | Guard Rail Anchor Block | 12 | EACH | 8,500.00 | 102,000.00 | | 0014 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 12 | EACH | 3,700.00 | 44,400.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 752,500.00 | 752,500.00 | | 0016 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,056 | LNFT | 0.50 | 528.00 | | 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 22.776 | MILE | 350.00 | 7,971.60 | | 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.187 | MILE | 600.00 | 2,512.20 | | 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 58.19 | MILE | 950.00 | 55,280.50 | | 0020 | 716-01-00100 | Mulch (Vegetative) | 38 | TON | 950.00 | 36,100.00 | | 0021 | 717-01-00100 | Seeding | 832 | LB | 20.00 | 16,640.00 | | 0022 | 718-01-00100 | Fertilizer | 18,400 | LB | 0.85 | 15,640.00 | | 0023 | 724-01-00100 | Rumble Strips (Centerline) | 7.492 | MILE | 1,000.00 | 7,492.00 | | 0024 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 14.984 | MILE | 1,000.00 | 14,984.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 752,500.00 | 752,500.00 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 130.00 | 1,560.00 | | 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,865 | EACH | 5.50 | 10,257.50 | | 0028 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 528 | LNFT | 11.00 | 5,808.00 | | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 29.054 | MILE | 5,900.00 | 171,418.60 | | 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.094 | MILE | 2,150.00 | 4,502.10 | | 0031 | 735-01-00100 | Mailboxes | 26 | EACH | 20.00 | 520.00 | | 0032 | 735-02-00100 | Mailbox Supports (Single) | 26 | EACH | 305.00 | 7,930.00 | | 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | | 0034 | 815-03-00300 | Joint Seal (Poured) | 2,193 | LNFT | 29.04 | 63,684.72 | | 0035 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 1,083 | LNFT | 4.50 | 4,873.50 | | 0036 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,110 | LNFT | 4.50 | 4,995.00 | | 0037 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 2,193 | LNFT | 2.00 | 4,386.00 | | 0038 | NS-830-00100 | Concrete Bridge Railing Repair and Rehabilitation | 722 | LNFT | 150.00 | 108,300.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 11,325,914.81 |
|