Proposal:H.014937.6
Parish:Jefferson
Description:SONIAT GREENWAY
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS I BASE COURSE, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, SIDEWALKS, LIGHTING, TREATED TIMBER PILES, PREFABRICATED PEDESTRIAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$3,707,334.50
| Rank | License | Bidder | Construction Bid |
| 1 | 24901 | Hard Rock Construction LLC | $3,329,077.10 |
| 2 | 06276 | Barriere Construction Co., LLC | $3,694,298.90 |
| 3 | 28190 | Buck Town Contractors & Co. | $3,999,978.89 |
| 4 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $4,044,343.80 |
| 5 | 14914 | Kass Bros. Inc. | $4,075,348.60 |
| 6 | 36961 | Cycle Construction Co. L.L.C. | $4,311,788.05 |
| 7 | 48896 | Command Construction Industries LLC | $4,343,434.00 |
| 8 | 44187 | RNGD Infrastructure LLC | $4,442,222.00 |
| 9 | 34263 | LA Contracting Enterprise, L.L.C. | $4,635,000.00 |
| 10 | 39613 | Baker Pile Driving and Site Work, LLC | $5,631,512.41 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Hard Rock Construction LLC | - 2 - Barriere Construction Co., LLC | - 3 - Buck Town Contractors & Co. | - 4 - KORT's CONSTRUCTION SERVICES, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 35,600.00 | 35,600.00 | 500.00 | 500.00 | 21,300.00 | 21,300.00 | 20,000.00 | 20,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,000.00 | 3,000.00 | 500.00 | 500.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 132.3 | SQYD | 18.00 | 2,381.40 | 27.00 | 3,572.10 | 16.00 | 2,116.80 | 10.00 | 1,323.00 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 300.00 | 600.00 | 530.00 | 1,060.00 | 925.00 | 1,850.00 | 1,000.00 | 2,000.00 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 60.2 | LNFT | 27.00 | 1,625.40 | 13.00 | 782.60 | 18.00 | 1,083.60 | 12.00 | 722.40 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 19 | SQYD | 33.00 | 627.00 | 44.00 | 836.00 | 28.00 | 532.00 | 13.00 | 247.00 | | 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 6 | LNFT | 32.00 | 192.00 | 44.00 | 264.00 | 10.00 | 60.00 | 9.00 | 54.00 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 278 | LNFT | 12.00 | 3,336.00 | 9.10 | 2,529.80 | 7.00 | 1,946.00 | 5.00 | 1,390.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" RCP | 68 | LNFT | 15.00 | 1,020.00 | 38.00 | 2,584.00 | 27.00 | 1,836.00 | 9.00 | 612.00 | | 0010 | 203-01-00100 | General Excavation | 6,957 | CUYD | 20.00 | 139,140.00 | 20.00 | 139,140.00 | 27.00 | 187,839.00 | 27.50 | 191,317.50 | | 0011 | 203-03-00100 | Embankment | 687 | CUYD | 25.00 | 17,175.00 | 76.00 | 52,212.00 | 48.00 | 32,976.00 | 55.00 | 37,785.00 | | 0012 | 203-08-00100 | Geotextile Fabric | 7,966 | SQYD | 3.00 | 23,898.00 | 1.90 | 15,135.40 | 2.50 | 19,915.00 | 1.50 | 11,949.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 3,280 | LNFT | 2.20 | 7,216.00 | 2.00 | 6,560.00 | 1.00 | 3,280.00 | 2.00 | 6,560.00 | | 0014 | 301-01-00100 | Class I Base Course | 3,580.1 | CUYD | 65.00 | 232,706.50 | 79.00 | 282,827.90 | 145.00 | 519,114.50 | 125.00 | 447,512.50 | | 0015 | 302-02-06000 | Class II Base Course (6" Thick) | 5,042.6 | SQYD | 19.00 | 95,809.40 | 19.00 | 95,809.40 | 32.00 | 161,363.20 | 19.00 | 95,809.40 | | 0016 | 502-01-00100 | Asphalt Concrete | 3,245.2 | TON | 124.00 | 402,404.80 | 160.00 | 519,232.00 | 192.00 | 623,078.40 | 190.00 | 616,588.00 | | 0017 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 66.7 | SQYD | 125.00 | 8,337.50 | 150.00 | 10,005.00 | 150.00 | 10,005.00 | 90.00 | 6,003.00 | | 0018 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 40 | LNFT | 186.00 | 7,440.00 | 120.00 | 4,800.00 | 200.00 | 8,000.00 | 98.00 | 3,920.00 | | 0019 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 123 | LNFT | 145.00 | 17,835.00 | 130.00 | 15,990.00 | 240.00 | 29,520.00 | 110.00 | 13,530.00 | | 0020 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 16 | LNFT | 186.00 | 2,976.00 | 120.00 | 1,920.00 | 200.00 | 3,200.00 | 70.00 | 1,120.00 | | 0021 | 702-03-00100 | Catch Basins (CB-01) (Type C) | 5 | EACH | 3,200.00 | 16,000.00 | 3,500.00 | 17,500.00 | 4,400.00 | 22,000.00 | 3,600.00 | 18,000.00 | | 0022 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 3,381 | LNFT | 20.00 | 67,620.00 | 29.00 | 98,049.00 | 25.00 | 84,525.00 | 22.00 | 74,382.00 | | 0023 | 706-01-00100 | Concrete Walk (4" Thick) | 354.1 | SQYD | 80.00 | 28,328.00 | 74.00 | 26,203.40 | 77.00 | 27,265.70 | 65.00 | 23,016.50 | | 0024 | 706-02-00300 | Concrete Drive (8" Thick) | 65.6 | SQYD | 156.00 | 10,233.60 | 110.00 | 7,216.00 | 118.00 | 7,740.80 | 90.00 | 5,904.00 | | 0025 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 95.4 | SQYD | 116.00 | 11,066.40 | 75.00 | 7,155.00 | 100.00 | 9,540.00 | 65.00 | 6,201.00 | | 0026 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 56 | SQYD | 202.00 | 11,312.00 | 85.00 | 4,760.00 | 260.00 | 14,560.00 | 80.00 | 4,480.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 18,000.00 | 18,000.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0028 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 2,843 | SQYD | 12.00 | 34,116.00 | 9.70 | 27,577.10 | 10.50 | 29,851.50 | 9.00 | 25,587.00 | | 0029 | 723-01-00100 | Granular Material (Net Section) 4" THICK | 81 | CUYD | 26.00 | 2,106.00 | 36.00 | 2,916.00 | 98.00 | 7,938.00 | 30.00 | 2,430.00 | | 0030 | 723-01-00100 | Granular Material (Net Section) 6" THICK | 11 | CUYD | 26.00 | 286.00 | 48.00 | 528.00 | 70.00 | 770.00 | 32.00 | 352.00 | | 0031 | 726-01-00100 | Bedding Material | 18.2 | CUYD | 97.00 | 1,765.40 | 55.00 | 1,001.00 | 153.00 | 2,784.60 | 80.00 | 1,456.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 356,000.00 | 356,000.00 | 308,250.00 | 308,250.00 | 149,000.00 | 149,000.00 | 175,000.00 | 175,000.00 | | 0033 | 729-19-00400 | Dead End Road Installations (Type D) | 2 | EACH | 1,300.00 | 2,600.00 | 1,280.00 | 2,560.00 | 1,150.00 | 2,300.00 | 1,400.00 | 2,800.00 | | 0034 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 288 | LNFT | 2.10 | 604.80 | 2.10 | 604.80 | 3.00 | 864.00 | 5.00 | 1,440.00 | | 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 82 | LNFT | 16.00 | 1,312.00 | 16.00 | 1,312.00 | 17.00 | 1,394.00 | 22.00 | 1,804.00 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.605 | MILE | 1,600.00 | 968.00 | 1,600.00 | 968.00 | 1,750.00 | 1,058.75 | 2,500.00 | 1,512.50 | | 0037 | 732-04-08000 | Plastic Pavement Legends and Symbols (Handicap Markings) (4" Width - Blue) | 90 | LNFT | 11.00 | 990.00 | 11.00 | 990.00 | 12.00 | 1,080.00 | 9.00 | 810.00 | | 0038 | 732-04-08020 | Plastic Pavement Legends and Symbols (Handicap Markings) (6" Width - Blue) | 65 | LNFT | 16.00 | 1,040.00 | 16.00 | 1,040.00 | 17.00 | 1,105.00 | 14.00 | 910.00 | | 0039 | 732-04-08040 | Plastic Pavement Legends and Symbols (Handicap Parking) | 2 | EACH | 532.00 | 1,064.00 | 530.00 | 1,060.00 | 580.00 | 1,160.00 | 475.00 | 950.00 | | 0040 | 739-01-00100 | Hydro-Seeding | 5.2 | ACRE | 4,047.00 | 21,044.40 | 3,380.00 | 17,576.00 | 3,370.00 | 17,524.00 | 3,500.00 | 18,200.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | 40,800.00 | 40,800.00 | 25,000.00 | 25,000.00 | | 0042 | 802-01-00100 | Structural Excavation (Bents) | 8 | CUYD | 303.00 | 2,424.00 | 170.00 | 1,360.00 | 100.00 | 800.00 | 230.00 | 1,840.00 | | 0043 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) (Class B) | 960 | LNFT | 37.00 | 35,520.00 | 37.00 | 35,520.00 | 32.50 | 31,200.00 | 40.00 | 38,400.00 | | 0044 | 804-09-01200 | Static Load Test (Treated Timber Piles (Coastal Treatment)) | 1 | EACH | 10,650.00 | 10,650.00 | 10,700.00 | 10,700.00 | 23,250.00 | 23,250.00 | 11,000.00 | 11,000.00 | | 0047 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 8,400.00 | 8,400.00 | 29,300.00 | 29,300.00 | 7,700.00 | 7,700.00 | 23,000.00 | 23,000.00 | | 0048 | 804-18-00100 | Vibration Monitoring | 2 | DAY | 745.00 | 1,490.00 | 750.00 | 1,500.00 | 800.00 | 1,600.00 | 900.00 | 1,800.00 | | 0049 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 19.08 | CUYD | 2,000.00 | 38,160.00 | 1,980.00 | 37,778.40 | 3,228.00 | 61,590.24 | 2,600.00 | 49,608.00 | | 0050 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 410 | SQFT | 6.00 | 2,460.00 | 7.40 | 3,034.00 | 1.00 | 410.00 | 9.00 | 3,690.00 | | 0051 | 806-01-00100 | Deformed Reinforcing Steel | 2,314 | LB | 1.50 | 3,471.00 | 2.90 | 6,710.60 | 1.50 | 3,471.00 | 3.00 | 6,942.00 | | 0052 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 1 | LUMP | 3,200.00 | 3,200.00 | 890.00 | 890.00 | 10,300.00 | 10,300.00 | 1,500.00 | 1,500.00 | | 0053 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 3 | EACH | 4,700.00 | 14,100.00 | 2,220.00 | 6,660.00 | 525.00 | 1,575.00 | 600.00 | 1,800.00 | | 0054 | NS-502-05125 | Shared-Use Path (Asphalt Concrete) (5" Thick) | 4,330 | SQYD | 37.00 | 160,210.00 | 47.00 | 203,510.00 | 52.33 | 226,588.90 | 58.00 | 251,140.00 | | 0055 | NS-706-00440 | Shared-Use Path (Portland Cement Concrete) (6" Thick) | 258 | SQYD | 100.00 | 25,800.00 | 71.00 | 18,318.00 | 107.00 | 27,606.00 | 80.00 | 20,640.00 | | 0056 | NS-736-00210 | Rectangular Rapid Flashing Beacon Assembly Pair (Double Sided) | 2 | EACH | 21,300.00 | 42,600.00 | 19,700.00 | 39,400.00 | 15,100.00 | 30,200.00 | 13,000.00 | 26,000.00 | | 0057 | TS-700-00010 | Benches (Park) (6' Metal) | 8 | EACH | 3,050.00 | 24,400.00 | 2,310.00 | 18,480.00 | 2,800.00 | 22,400.00 | 2,500.00 | 20,000.00 | | 0058 | TS-700-02080 | Bollard (6") | 4 | EACH | 2,000.00 | 8,000.00 | 2,260.00 | 9,040.00 | 1,300.00 | 5,200.00 | 1,200.00 | 4,800.00 | | 0059 | TS-705-00005 | Wood Fence (10' HEIGHT) | 80 | LF | 80.00 | 6,400.00 | 290.00 | 23,200.00 | 100.00 | 8,000.00 | 85.00 | 6,800.00 | | 0060 | TS-707-23060 | Wheel Stops | 20 | EACH | 330.00 | 6,600.00 | 110.00 | 2,200.00 | 270.00 | 5,400.00 | 75.00 | 1,500.00 | | 0061 | TS-800-00100 | Pedestrian Bridge (12' WIDE) (PREFABRICATED) | 1 | LUMP | 252,000.00 | 252,000.00 | 237,000.00 | 237,000.00 | 312,900.00 | 312,900.00 | 370,000.00 | 370,000.00 | | 0062 | TS-800-00150 | Aluminum Pedestrian Ramp (12' Wide) (Prefabricated) | 2 | EACH | 76,600.00 | 153,200.00 | 78,600.00 | 157,200.00 | 93,300.00 | 186,600.00 | 105,000.00 | 210,000.00 | | 0063 | TS-822-09105 | Trenching and Backfilling | 6,027 | LNFT | 7.00 | 42,189.00 | 21.00 | 126,567.00 | 7.25 | 43,695.75 | 7.00 | 42,189.00 | | 0064 | TS-822-09118 | Conduit (PVC/HDPE) (2" Schedule 40) | 5,547 | LNFT | 7.50 | 41,602.50 | 7.20 | 39,938.40 | 8.00 | 44,376.00 | 8.00 | 44,376.00 | | 0065 | TS-822-09118 | Conduit (PVC/HDPE) (2" Schedule 80) | 794 | LNFT | 42.00 | 33,348.00 | 7.60 | 6,034.40 | 45.00 | 35,730.00 | 45.00 | 35,730.00 | | 0066 | TS-822-09119 | Conductors (2 #12, 1 #8 GRD THWN) | 1,589 | LNFT | 4.00 | 6,356.00 | 7.60 | 12,076.40 | 4.20 | 6,673.80 | 4.00 | 6,356.00 | | 0067 | TS-822-09119 | Conductors (2 #2, 1 #8 GND THWM) | 2,861 | LNFT | 10.00 | 28,610.00 | 15.00 | 42,915.00 | 10.15 | 29,039.15 | 10.00 | 28,610.00 | | 0068 | TS-822-09119 | Conductors (2 #8, 1 #8 GND THWN) | 2,173 | LNFT | 5.00 | 10,865.00 | 8.40 | 18,253.20 | 5.40 | 11,734.20 | 5.00 | 10,865.00 | | 0069 | TS-822-09134 | Light Pole (Type A - 14') (Alum) (Banner Arms) | 39 | EACH | 11,200.00 | 436,800.00 | 13,400.00 | 522,600.00 | 12,064.00 | 470,496.00 | 14,400.00 | 561,600.00 | | 0070 | TS-822-09134 | Light Pole (Type B - 16') (Alum) (Banner Arms) | 14 | EACH | 11,200.00 | 156,800.00 | 13,600.00 | 190,400.00 | 11,990.00 | 167,860.00 | 14,950.00 | 209,300.00 | | 0071 | TS-822-09158 | Luminaire (LED) (4K) (IES Type V Distr.) (Acorn) | 53 | EACH | 1,200.00 | 63,600.00 | 1,840.00 | 97,520.00 | 1,290.00 | 68,370.00 | 1,300.00 | 68,900.00 | | 0072 | TS-822-09160 | Electrical Service Point (Structure) | 1 | EACH | 16,000.00 | 16,000.00 | 17,600.00 | 17,600.00 | 13,200.00 | 13,200.00 | 20,000.00 | 20,000.00 | | 0073 | TS-822-09164 | Underground Junction Box (11" x 18") | 7 | EACH | 2,000.00 | 14,000.00 | 1,650.00 | 11,550.00 | 1,745.00 | 12,215.00 | 1,300.00 | 9,100.00 | | 0074 | TS-822-09172 | Modular Breakaway Cable System | 20 | EACH | 825.00 | 16,500.00 | 190.00 | 3,800.00 | 900.00 | 18,000.00 | 900.00 | 18,000.00 | | 0075 | TS-822-09174 | Disconnect (Service) | 1 | EACH | 4,100.00 | 4,100.00 | 14,100.00 | 14,100.00 | 4,475.00 | 4,475.00 | 4,500.00 | 4,500.00 | | 0076 | TS-822-09176 | Duct Marker (Concrete) | 20 | EACH | 780.00 | 15,600.00 | 220.00 | 4,400.00 | 525.00 | 10,500.00 | 500.00 | 10,000.00 | | 0077 | TS-822-09178 | Underground Marker Tape (6") (Detectable) | 5,670 | LNFT | 3.50 | 19,845.00 | 1.10 | 6,237.00 | 3.80 | 21,546.00 | 4.00 | 22,680.00 | | 0078 | TS-MSC-00300 | Bike Racks | 2 | EACH | 3,500.00 | 7,000.00 | 990.00 | 1,980.00 | 1,500.00 | 3,000.00 | 1,500.00 | 3,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,329,077.10 | | 3,694,298.90 | | 3,999,978.89 | | 4,044,343.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Kass Bros. Inc. | - 6 - Cycle Construction Co. L.L.C. | - 7 - Command Construction Industries LLC | - 8 - RNGD Infrastructure LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 10,000.00 | 10,000.00 | 34,800.00 | 34,800.00 | 100,000.00 | 100,000.00 | 5,000.00 | 5,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,000.00 | 6,000.00 | 6,000.00 | 6,000.00 | 100,147.00 | 100,147.00 | 5,000.00 | 5,000.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 132.3 | SQYD | 11.00 | 1,455.30 | 19.00 | 2,513.70 | 25.00 | 3,307.50 | 20.00 | 2,646.00 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 715.00 | 1,430.00 | 580.00 | 1,160.00 | 500.00 | 1,000.00 | 500.00 | 1,000.00 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 60.2 | LNFT | 25.00 | 1,505.00 | 17.00 | 1,023.40 | 10.00 | 602.00 | 10.00 | 602.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 19 | SQYD | 24.00 | 456.00 | 48.00 | 912.00 | 25.00 | 475.00 | 35.00 | 665.00 | | 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 6 | LNFT | 53.00 | 318.00 | 48.00 | 288.00 | 10.00 | 60.00 | 10.00 | 60.00 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 278 | LNFT | 15.00 | 4,170.00 | 13.00 | 3,614.00 | 10.00 | 2,780.00 | 5.00 | 1,390.00 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" RCP | 68 | LNFT | 40.00 | 2,720.00 | 43.00 | 2,924.00 | 25.00 | 1,700.00 | 50.00 | 3,400.00 | | 0010 | 203-01-00100 | General Excavation | 6,957 | CUYD | 30.00 | 208,710.00 | 27.60 | 192,013.20 | 15.00 | 104,355.00 | 35.00 | 243,495.00 | | 0011 | 203-03-00100 | Embankment | 687 | CUYD | 45.00 | 30,915.00 | 57.50 | 39,502.50 | 15.00 | 10,305.00 | 50.00 | 34,350.00 | | 0012 | 203-08-00100 | Geotextile Fabric | 7,966 | SQYD | 1.50 | 11,949.00 | 2.90 | 23,101.40 | 1.00 | 7,966.00 | 2.00 | 15,932.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 3,280 | LNFT | 1.00 | 3,280.00 | 4.30 | 14,104.00 | 5.00 | 16,400.00 | 5.00 | 16,400.00 | | 0014 | 301-01-00100 | Class I Base Course | 3,580.1 | CUYD | 89.00 | 318,628.90 | 80.00 | 286,408.00 | 75.00 | 268,507.50 | 130.00 | 465,413.00 | | 0015 | 302-02-06000 | Class II Base Course (6" Thick) | 5,042.6 | SQYD | 20.00 | 100,852.00 | 21.00 | 105,894.60 | 25.00 | 126,065.00 | 35.00 | 176,491.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 3,245.2 | TON | 185.00 | 600,362.00 | 191.00 | 619,833.20 | 180.00 | 584,136.00 | 200.00 | 649,040.00 | | 0017 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 66.7 | SQYD | 200.00 | 13,340.00 | 251.00 | 16,741.70 | 250.00 | 16,675.00 | 100.00 | 6,670.00 | | 0018 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 40 | LNFT | 215.00 | 8,600.00 | 254.00 | 10,160.00 | 150.00 | 6,000.00 | 175.00 | 7,000.00 | | 0019 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 123 | LNFT | 195.00 | 23,985.00 | 231.00 | 28,413.00 | 200.00 | 24,600.00 | 200.00 | 24,600.00 | | 0020 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 16 | LNFT | 400.00 | 6,400.00 | 296.00 | 4,736.00 | 150.00 | 2,400.00 | 250.00 | 4,000.00 | | 0021 | 702-03-00100 | Catch Basins (CB-01) (Type C) | 5 | EACH | 6,000.00 | 30,000.00 | 4,400.00 | 22,000.00 | 6,750.00 | 33,750.00 | 5,000.00 | 25,000.00 | | 0022 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 3,381 | LNFT | 25.00 | 84,525.00 | 22.00 | 74,382.00 | 35.00 | 118,335.00 | 28.00 | 94,668.00 | | 0023 | 706-01-00100 | Concrete Walk (4" Thick) | 354.1 | SQYD | 100.00 | 35,410.00 | 133.00 | 47,095.30 | 100.00 | 35,410.00 | 70.00 | 24,787.00 | | 0024 | 706-02-00300 | Concrete Drive (8" Thick) | 65.6 | SQYD | 180.00 | 11,808.00 | 155.00 | 10,168.00 | 150.00 | 9,840.00 | 120.00 | 7,872.00 | | 0025 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 95.4 | SQYD | 155.00 | 14,787.00 | 132.00 | 12,592.80 | 100.00 | 9,540.00 | 70.00 | 6,678.00 | | 0026 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 56 | SQYD | 225.00 | 12,600.00 | 192.00 | 10,752.00 | 150.00 | 8,400.00 | 120.00 | 6,720.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 85,000.00 | 85,000.00 | 100,000.00 | 100,000.00 | 25,000.00 | 25,000.00 | | 0028 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 2,843 | SQYD | 9.00 | 25,587.00 | 10.50 | 29,851.50 | 10.00 | 28,430.00 | 10.00 | 28,430.00 | | 0029 | 723-01-00100 | Granular Material (Net Section) 4" THICK | 81 | CUYD | 71.00 | 5,751.00 | 105.00 | 8,505.00 | 50.00 | 4,050.00 | 50.00 | 4,050.00 | | 0030 | 723-01-00100 | Granular Material (Net Section) 6" THICK | 11 | CUYD | 225.00 | 2,475.00 | 83.00 | 913.00 | 50.00 | 550.00 | 50.00 | 550.00 | | 0031 | 726-01-00100 | Bedding Material | 18.2 | CUYD | 97.00 | 1,765.40 | 110.00 | 2,002.00 | 250.00 | 4,550.00 | 70.00 | 1,274.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 350,000.00 | 350,000.00 | 430,000.00 | 430,000.00 | 500,000.00 | 500,000.00 | 440,000.00 | 440,000.00 | | 0033 | 729-19-00400 | Dead End Road Installations (Type D) | 2 | EACH | 1,400.00 | 2,800.00 | 1,200.00 | 2,400.00 | 1,500.00 | 3,000.00 | 1,000.00 | 2,000.00 | | 0034 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 288 | LNFT | 2.00 | 576.00 | 4.50 | 1,296.00 | 3.00 | 864.00 | 3.00 | 864.00 | | 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 82 | LNFT | 16.00 | 1,312.00 | 21.00 | 1,722.00 | 25.00 | 2,050.00 | 17.00 | 1,394.00 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.605 | MILE | 1,600.00 | 968.00 | 2,550.00 | 1,542.75 | 2,000.00 | 1,210.00 | 1,800.00 | 1,089.00 | | 0037 | 732-04-08000 | Plastic Pavement Legends and Symbols (Handicap Markings) (4" Width - Blue) | 90 | LNFT | 11.00 | 990.00 | 9.50 | 855.00 | 10.00 | 900.00 | 12.00 | 1,080.00 | | 0038 | 732-04-08020 | Plastic Pavement Legends and Symbols (Handicap Markings) (6" Width - Blue) | 65 | LNFT | 16.00 | 1,040.00 | 14.00 | 910.00 | 20.00 | 1,300.00 | 17.00 | 1,105.00 | | 0039 | 732-04-08040 | Plastic Pavement Legends and Symbols (Handicap Parking) | 2 | EACH | 550.00 | 1,100.00 | 465.00 | 930.00 | 1,000.00 | 2,000.00 | 550.00 | 1,100.00 | | 0040 | 739-01-00100 | Hydro-Seeding | 5.2 | ACRE | 3,400.00 | 17,680.00 | 3,400.00 | 17,680.00 | 3,500.00 | 18,200.00 | 5,000.00 | 26,000.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 55,000.00 | 55,000.00 | 62,000.00 | 62,000.00 | 150,000.00 | 150,000.00 | 50,000.00 | 50,000.00 | | 0042 | 802-01-00100 | Structural Excavation (Bents) | 8 | CUYD | 550.00 | 4,400.00 | 510.00 | 4,080.00 | 250.00 | 2,000.00 | 350.00 | 2,800.00 | | 0043 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) (Class B) | 960 | LNFT | 45.00 | 43,200.00 | 42.00 | 40,320.00 | 40.00 | 38,400.00 | 65.00 | 62,400.00 | | 0044 | 804-09-01200 | Static Load Test (Treated Timber Piles (Coastal Treatment)) | 1 | EACH | 12,500.00 | 12,500.00 | 11,585.00 | 11,585.00 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0047 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 3,200.00 | 3,200.00 | 26,650.00 | 26,650.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | | 0048 | 804-18-00100 | Vibration Monitoring | 2 | DAY | 850.00 | 1,700.00 | 810.00 | 1,620.00 | 1,000.00 | 2,000.00 | 1,500.00 | 3,000.00 | | 0049 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 19.08 | CUYD | 3,800.00 | 72,504.00 | 3,515.00 | 67,066.20 | 2,000.00 | 38,160.00 | 2,500.00 | 47,700.00 | | 0050 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 410 | SQFT | 4.00 | 1,640.00 | 3.65 | 1,496.50 | 5.00 | 2,050.00 | 7.00 | 2,870.00 | | 0051 | 806-01-00100 | Deformed Reinforcing Steel | 2,314 | LB | 2.00 | 4,628.00 | 1.75 | 4,049.50 | 2.00 | 4,628.00 | 4.00 | 9,256.00 | | 0052 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 1 | LUMP | 550.00 | 550.00 | 500.00 | 500.00 | 1,500.00 | 1,500.00 | 3,500.00 | 3,500.00 | | 0053 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 3 | EACH | 2,000.00 | 6,000.00 | 500.00 | 1,500.00 | 250.00 | 750.00 | 500.00 | 1,500.00 | | 0054 | NS-502-05125 | Shared-Use Path (Asphalt Concrete) (5" Thick) | 4,330 | SQYD | 73.00 | 316,090.00 | 55.60 | 240,748.00 | 70.00 | 303,100.00 | 62.00 | 268,460.00 | | 0055 | NS-706-00440 | Shared-Use Path (Portland Cement Concrete) (6" Thick) | 258 | SQYD | 160.00 | 41,280.00 | 145.00 | 37,410.00 | 75.00 | 19,350.00 | 80.00 | 20,640.00 | | 0056 | NS-736-00210 | Rectangular Rapid Flashing Beacon Assembly Pair (Double Sided) | 2 | EACH | 9,000.00 | 18,000.00 | 20,200.00 | 40,400.00 | 15,000.00 | 30,000.00 | 15,000.00 | 30,000.00 | | 0057 | TS-700-00010 | Benches (Park) (6' Metal) | 8 | EACH | 3,000.00 | 24,000.00 | 2,850.00 | 22,800.00 | 2,000.00 | 16,000.00 | 2,500.00 | 20,000.00 | | 0058 | TS-700-02080 | Bollard (6") | 4 | EACH | 600.00 | 2,400.00 | 1,500.00 | 6,000.00 | 1,000.00 | 4,000.00 | 1,200.00 | 4,800.00 | | 0059 | TS-705-00005 | Wood Fence (10' HEIGHT) | 80 | LF | 88.00 | 7,040.00 | 85.00 | 6,800.00 | 150.00 | 12,000.00 | 125.00 | 10,000.00 | | 0060 | TS-707-23060 | Wheel Stops | 20 | EACH | 120.00 | 2,400.00 | 175.00 | 3,500.00 | 125.00 | 2,500.00 | 250.00 | 5,000.00 | | 0061 | TS-800-00100 | Pedestrian Bridge (12' WIDE) (PREFABRICATED) | 1 | LUMP | 325,000.00 | 325,000.00 | 302,000.00 | 302,000.00 | 350,000.00 | 350,000.00 | 400,002.00 | 400,002.00 | | 0062 | TS-800-00150 | Aluminum Pedestrian Ramp (12' Wide) (Prefabricated) | 2 | EACH | 98,000.00 | 196,000.00 | 92,500.00 | 185,000.00 | 100,000.00 | 200,000.00 | 62,005.00 | 124,010.00 | | 0063 | TS-822-09105 | Trenching and Backfilling | 6,027 | LNFT | 7.00 | 42,189.00 | 22.00 | 132,594.00 | 7.00 | 42,189.00 | 20.00 | 120,540.00 | | 0064 | TS-822-09118 | Conduit (PVC/HDPE) (2" Schedule 40) | 5,547 | LNFT | 8.00 | 44,376.00 | 7.40 | 41,047.80 | 8.00 | 44,376.00 | 7.00 | 38,829.00 | | 0065 | TS-822-09118 | Conduit (PVC/HDPE) (2" Schedule 80) | 794 | LNFT | 45.00 | 35,730.00 | 8.00 | 6,352.00 | 45.00 | 35,730.00 | 7.00 | 5,558.00 | | 0066 | TS-822-09119 | Conductors (2 #12, 1 #8 GRD THWN) | 1,589 | LNFT | 4.00 | 6,356.00 | 8.00 | 12,712.00 | 4.00 | 6,356.00 | 7.00 | 11,123.00 | | 0067 | TS-822-09119 | Conductors (2 #2, 1 #8 GND THWM) | 2,861 | LNFT | 10.00 | 28,610.00 | 16.00 | 45,776.00 | 10.00 | 28,610.00 | 15.00 | 42,915.00 | | 0068 | TS-822-09119 | Conductors (2 #8, 1 #8 GND THWN) | 2,173 | LNFT | 5.00 | 10,865.00 | 8.50 | 18,470.50 | 5.00 | 10,865.00 | 8.00 | 17,384.00 | | 0069 | TS-822-09134 | Light Pole (Type A - 14') (Alum) (Banner Arms) | 39 | EACH | 11,700.00 | 456,300.00 | 12,550.00 | 489,450.00 | 10,000.00 | 390,000.00 | 10,000.00 | 390,000.00 | | 0070 | TS-822-09134 | Light Pole (Type B - 16') (Alum) (Banner Arms) | 14 | EACH | 12,000.00 | 168,000.00 | 12,800.00 | 179,200.00 | 10,000.00 | 140,000.00 | 12,000.00 | 168,000.00 | | 0071 | TS-822-09158 | Luminaire (LED) (4K) (IES Type V Distr.) (Acorn) | 53 | EACH | 1,500.00 | 79,500.00 | 1,900.00 | 100,700.00 | 1,250.00 | 66,250.00 | 1,650.00 | 87,450.00 | | 0072 | TS-822-09160 | Electrical Service Point (Structure) | 1 | EACH | 21,500.00 | 21,500.00 | 17,900.00 | 17,900.00 | 20,000.00 | 20,000.00 | 12,500.00 | 12,500.00 | | 0073 | TS-822-09164 | Underground Junction Box (11" x 18") | 7 | EACH | 1,500.00 | 10,500.00 | 1,700.00 | 11,900.00 | 1,250.00 | 8,750.00 | 1,500.00 | 10,500.00 | | 0074 | TS-822-09172 | Modular Breakaway Cable System | 20 | EACH | 1,000.00 | 20,000.00 | 200.00 | 4,000.00 | 1,000.00 | 20,000.00 | 200.00 | 4,000.00 | | 0075 | TS-822-09174 | Disconnect (Service) | 1 | EACH | 4,500.00 | 4,500.00 | 14,500.00 | 14,500.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | | 0076 | TS-822-09176 | Duct Marker (Concrete) | 20 | EACH | 500.00 | 10,000.00 | 230.00 | 4,600.00 | 400.00 | 8,000.00 | 200.00 | 4,000.00 | | 0077 | TS-822-09178 | Underground Marker Tape (6") (Detectable) | 5,670 | LNFT | 2.00 | 11,340.00 | 1.15 | 6,520.50 | 3.00 | 17,010.00 | 1.00 | 5,670.00 | | 0078 | TS-MSC-00300 | Bike Racks | 2 | EACH | 900.00 | 1,800.00 | 2,900.00 | 5,800.00 | 2,000.00 | 4,000.00 | 2,500.00 | 5,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,075,348.60 | | 4,311,788.05 | | 4,343,434.00 | | 4,442,222.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - LA Contracting Enterprise, L.L.C. | - 10 - Baker Pile Driving and Site Work, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 33,000.00 | 33,000.00 | 19,208.42 | 19,208.42 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 24,574.66 | 24,574.66 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 132.3 | SQYD | 25.00 | 3,307.50 | 51.00 | 6,747.30 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 1,350.00 | 2,700.00 | 2,043.69 | 4,087.38 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 60.2 | LNFT | 22.00 | 1,324.40 | 35.00 | 2,107.00 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 19 | SQYD | 115.00 | 2,185.00 | 88.77 | 1,686.63 | | 0007 | 202-02-06140 | Removal of Curbs (Concrete) | 6 | LNFT | 67.00 | 402.00 | 125.24 | 751.44 | | 0008 | 202-02-12020 | Removal of Fence (Chain Link) | 278 | LNFT | 7.00 | 1,946.00 | 18.98 | 5,276.44 | | 0009 | 202-02-32140 | Removal of Pipe (Storm Drain) 18" RCP | 68 | LNFT | 40.00 | 2,720.00 | 49.22 | 3,346.96 | | 0010 | 203-01-00100 | General Excavation | 6,957 | CUYD | 41.00 | 285,237.00 | 11.82 | 82,231.74 | | 0011 | 203-03-00100 | Embankment | 687 | CUYD | 36.00 | 24,732.00 | 40.50 | 27,823.50 | | 0012 | 203-08-00100 | Geotextile Fabric | 7,966 | SQYD | 2.00 | 15,932.00 | 1.90 | 15,135.40 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 3,280 | LNFT | 4.00 | 13,120.00 | 2.20 | 7,216.00 | | 0014 | 301-01-00100 | Class I Base Course | 3,580.1 | CUYD | 170.00 | 608,617.00 | 70.00 | 250,607.00 | | 0015 | 302-02-06000 | Class II Base Course (6" Thick) | 5,042.6 | SQYD | 36.00 | 181,533.60 | 33.00 | 166,405.80 | | 0016 | 502-01-00100 | Asphalt Concrete | 3,245.2 | TON | 238.00 | 772,357.60 | 605.00 | 1,963,346.00 | | 0017 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 66.7 | SQYD | 342.00 | 22,811.40 | 302.50 | 20,176.75 | | 0018 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 40 | LNFT | 127.00 | 5,080.00 | 102.36 | 4,094.40 | | 0019 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 123 | LNFT | 125.00 | 15,375.00 | 144.82 | 17,812.86 | | 0020 | 701-10-01020 | Reinforced Concrete Pipe (Extension) (15") | 16 | LNFT | 116.00 | 1,856.00 | 164.31 | 2,628.96 | | 0021 | 702-03-00100 | Catch Basins (CB-01) (Type C) | 5 | EACH | 4,700.00 | 23,500.00 | 6,001.31 | 30,006.55 | | 0022 | 705-06-00300 | Chain Link Fence (6-Foot Height) | 3,381 | LNFT | 43.00 | 145,383.00 | 22.53 | 76,173.93 | | 0023 | 706-01-00100 | Concrete Walk (4" Thick) | 354.1 | SQYD | 157.00 | 55,593.70 | 100.00 | 35,410.00 | | 0024 | 706-02-00300 | Concrete Drive (8" Thick) | 65.6 | SQYD | 358.00 | 23,484.80 | 130.00 | 8,528.00 | | 0025 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 95.4 | SQYD | 170.00 | 16,218.00 | 171.00 | 16,313.40 | | 0026 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 56 | SQYD | 363.00 | 20,328.00 | 151.57 | 8,487.92 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 2,530.00 | 2,530.00 | | 0028 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 2,843 | SQYD | 10.50 | 29,851.50 | 6.19 | 17,598.17 | | 0029 | 723-01-00100 | Granular Material (Net Section) 4" THICK | 81 | CUYD | 99.00 | 8,019.00 | 71.40 | 5,783.40 | | 0030 | 723-01-00100 | Granular Material (Net Section) 6" THICK | 11 | CUYD | 287.00 | 3,157.00 | 83.22 | 915.42 | | 0031 | 726-01-00100 | Bedding Material | 18.2 | CUYD | 165.00 | 3,003.00 | 231.00 | 4,204.20 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 324,176.00 | 324,176.00 | 476,782.90 | 476,782.90 | | 0033 | 729-19-00400 | Dead End Road Installations (Type D) | 2 | EACH | 1,200.00 | 2,400.00 | 1,100.00 | 2,200.00 | | 0034 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 288 | LNFT | 2.00 | 576.00 | 4.40 | 1,267.20 | | 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 82 | LNFT | 15.00 | 1,230.00 | 19.80 | 1,623.60 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.605 | MILE | 1,500.00 | 907.50 | 2,420.00 | 1,464.10 | | 0037 | 732-04-08000 | Plastic Pavement Legends and Symbols (Handicap Markings) (4" Width - Blue) | 90 | LNFT | 10.00 | 900.00 | 8.80 | 792.00 | | 0038 | 732-04-08020 | Plastic Pavement Legends and Symbols (Handicap Markings) (6" Width - Blue) | 65 | LNFT | 15.00 | 975.00 | 13.20 | 858.00 | | 0039 | 732-04-08040 | Plastic Pavement Legends and Symbols (Handicap Parking) | 2 | EACH | 500.00 | 1,000.00 | 440.00 | 880.00 | | 0040 | 739-01-00100 | Hydro-Seeding | 5.2 | ACRE | 2,000.00 | 10,400.00 | 3,080.00 | 16,016.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 126,929.00 | 126,929.00 | | 0042 | 802-01-00100 | Structural Excavation (Bents) | 8 | CUYD | 160.00 | 1,280.00 | 143.25 | 1,146.00 | | 0043 | 804-02-00200 | Treated Timber Piles (Coastal Treatment) (Class B) | 960 | LNFT | 40.00 | 38,400.00 | 35.32 | 33,907.20 | | 0044 | 804-09-01200 | Static Load Test (Treated Timber Piles (Coastal Treatment)) | 1 | EACH | 6,500.00 | 6,500.00 | 11,462.00 | 11,462.00 | | 0047 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 28,000.00 | 28,000.00 | 30,250.00 | 30,250.00 | | 0048 | 804-18-00100 | Vibration Monitoring | 2 | DAY | 1,600.00 | 3,200.00 | 660.00 | 1,320.00 | | 0049 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 19.08 | CUYD | 1,300.00 | 24,804.00 | 1,716.00 | 32,741.28 | | 0050 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 410 | SQFT | 27.00 | 11,070.00 | 6.08 | 2,492.80 | | 0051 | 806-01-00100 | Deformed Reinforcing Steel | 2,314 | LB | 5.00 | 11,570.00 | 2.35 | 5,437.90 | | 0052 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 1 | LUMP | 1,650.00 | 1,650.00 | 1,139.13 | 1,139.13 | | 0053 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 3 | EACH | 250.00 | 750.00 | 1,100.00 | 3,300.00 | | 0054 | NS-502-05125 | Shared-Use Path (Asphalt Concrete) (5" Thick) | 4,330 | SQYD | 60.00 | 259,800.00 | 130.67 | 565,801.10 | | 0055 | NS-706-00440 | Shared-Use Path (Portland Cement Concrete) (6" Thick) | 258 | SQYD | 160.00 | 41,280.00 | 99.73 | 25,730.34 | | 0056 | NS-736-00210 | Rectangular Rapid Flashing Beacon Assembly Pair (Double Sided) | 2 | EACH | 14,000.00 | 28,000.00 | 14,117.40 | 28,234.80 | | 0057 | TS-700-00010 | Benches (Park) (6' Metal) | 8 | EACH | 2,500.00 | 20,000.00 | 2,133.53 | 17,068.24 | | 0058 | TS-700-02080 | Bollard (6") | 4 | EACH | 1,500.00 | 6,000.00 | 550.00 | 2,200.00 | | 0059 | TS-705-00005 | Wood Fence (10' HEIGHT) | 80 | LF | 265.00 | 21,200.00 | 66.00 | 5,280.00 | | 0060 | TS-707-23060 | Wheel Stops | 20 | EACH | 110.00 | 2,200.00 | 148.10 | 2,962.00 | | 0061 | TS-800-00100 | Pedestrian Bridge (12' WIDE) (PREFABRICATED) | 1 | LUMP | 365,000.00 | 365,000.00 | 306,715.81 | 306,715.81 | | 0062 | TS-800-00150 | Aluminum Pedestrian Ramp (12' Wide) (Prefabricated) | 2 | EACH | 75,000.00 | 150,000.00 | 85,829.15 | 171,658.30 | | 0063 | TS-822-09105 | Trenching and Backfilling | 6,027 | LNFT | 7.00 | 42,189.00 | 11.55 | 69,611.85 | | 0064 | TS-822-09118 | Conduit (PVC/HDPE) (2" Schedule 40) | 5,547 | LNFT | 8.00 | 44,376.00 | 9.79 | 54,305.13 | | 0065 | TS-822-09118 | Conduit (PVC/HDPE) (2" Schedule 80) | 794 | LNFT | 39.00 | 30,966.00 | 13.26 | 10,528.44 | | 0066 | TS-822-09119 | Conductors (2 #12, 1 #8 GRD THWN) | 1,589 | LNFT | 4.00 | 6,356.00 | 1.49 | 2,367.61 | | 0067 | TS-822-09119 | Conductors (2 #2, 1 #8 GND THWM) | 2,861 | LNFT | 10.00 | 28,610.00 | 6.42 | 18,367.62 | | 0068 | TS-822-09119 | Conductors (2 #8, 1 #8 GND THWN) | 2,173 | LNFT | 5.00 | 10,865.00 | 2.45 | 5,323.85 | | 0069 | TS-822-09134 | Light Pole (Type A - 14') (Alum) (Banner Arms) | 39 | EACH | 10,000.00 | 390,000.00 | 10,312.50 | 402,187.50 | | 0070 | TS-822-09134 | Light Pole (Type B - 16') (Alum) (Banner Arms) | 14 | EACH | 9,500.00 | 133,000.00 | 10,522.91 | 147,320.74 | | 0071 | TS-822-09158 | Luminaire (LED) (4K) (IES Type V Distr.) (Acorn) | 53 | EACH | 1,250.00 | 66,250.00 | 2,151.60 | 114,034.80 | | 0072 | TS-822-09160 | Electrical Service Point (Structure) | 1 | EACH | 36,000.00 | 36,000.00 | 11,529.10 | 11,529.10 | | 0073 | TS-822-09164 | Underground Junction Box (11" x 18") | 7 | EACH | 1,250.00 | 8,750.00 | 1,720.40 | 12,042.80 | | 0074 | TS-822-09172 | Modular Breakaway Cable System | 20 | EACH | 800.00 | 16,000.00 | 2,884.20 | 57,684.00 | | 0075 | TS-822-09174 | Disconnect (Service) | 1 | EACH | 4,000.00 | 4,000.00 | 1,851.30 | 1,851.30 | | 0076 | TS-822-09176 | Duct Marker (Concrete) | 20 | EACH | 525.00 | 10,500.00 | 414.70 | 8,294.00 | | 0077 | TS-822-09178 | Underground Marker Tape (6") (Detectable) | 5,670 | LNFT | 3.50 | 19,845.00 | 0.87 | 4,932.90 | | 0078 | TS-MSC-00300 | Bike Racks | 2 | EACH | 625.00 | 1,250.00 | 1,127.72 | 2,255.44 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,635,000.00 | | 5,631,512.41 |
|