Proposal:H.014217.6
Parish:Bossier
Routes:LA 537
Description:LA 537: BRIDGES NEAR PLAIN DEALING
Type Construction:CLEARING AND GRUBBING, REMOVAL OF PRECAST CONCRETE SLAB BRIDGES, GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, PRECAST CONCRETE BOX CULVERT, CONCRETE SLAB SPAN BRIDGES, AND RELATED WORK.
Estimated Construction Cost:$6,201,735.20
| Rank | License | Bidder | Construction Bid |
| 1 | 27239 | Apeck Construction, LLC | $5,929,094.47 |
| 2 | 39613 | Baker Pile Driving and Site Work, LLC | $6,172,624.20 |
| 3 | 49239 | WL Bass Construction Inc. | $6,494,183.10 |
| 4 | 71454 | Chief Bridge & Concrete LLC | $6,697,894.05 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $6,827,957.72 |
| 6 | 12487 | Diamond B Construction Co., L.L.C. | $7,345,208.30 |
| 7 | 67770 | Reliant Industrial Solutions L.L.C. | $7,348,357.67 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Apeck Construction, LLC | - 2 - Baker Pile Driving and Site Work, LLC | - 3 - WL Bass Construction Inc. | - 4 - Chief Bridge & Concrete LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.1 | LUMP | 391,451.48 | 391,451.48 | 44,800.00 | 44,800.00 | 244,000.00 | 244,000.00 | 32,000.00 | 32,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,138.00 | 12,138.00 | 16,800.00 | 16,800.00 | 26,500.00 | 26,500.00 | 12,000.00 | 12,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 15 | SQYD | 110.36 | 1,655.40 | 112.00 | 1,680.00 | 50.00 | 750.00 | 67.00 | 1,005.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 4,728.7 | SQYD | 17.62 | 83,319.69 | 12.00 | 56,744.40 | 15.00 | 70,930.50 | 6.00 | 28,372.20 | | 0005 | 202-02-04501 | Removal of Bridge (Sta. 105+45.91; 133’x28’ Precast Concrete Slab Bridge) | 4,123 | LUMP | 62,878.25 | 62,878.25 | 22,400.00 | 22,400.00 | 100,000.00 | 100,000.00 | 275,000.00 | 275,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (Sta. 205+40.22; 57’x28’ Precast Concrete Slab Bridge) | 1,767 | LUMP | 22,290.37 | 22,290.37 | 22,400.00 | 22,400.00 | 50,000.00 | 50,000.00 | 225,000.00 | 225,000.00 | | 0007 | 202-02-04501 | Removal of Bridge (Sta. 305+43.45; 57’x28’ Precast Concrete Slab Bridge) | 1,767 | LUMP | 22,290.37 | 22,290.37 | 22,400.00 | 22,400.00 | 50,000.00 | 50,000.00 | 225,000.00 | 225,000.00 | | 0008 | 202-02-12000 | Removal of Fence | 2,530 | LNFT | 7.15 | 18,089.50 | 5.60 | 14,168.00 | 3.00 | 7,590.00 | 6.00 | 15,180.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 601.8 | LNFT | 15.82 | 9,520.48 | 11.20 | 6,740.16 | 20.00 | 12,036.00 | 40.00 | 24,072.00 | | 0010 | 203-02-00100 | Drainage Excavation | 1,296 | CUYD | 41.94 | 54,354.24 | 28.00 | 36,288.00 | 25.00 | 32,400.00 | 20.00 | 25,920.00 | | 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 222,830.90 | 222,830.90 | 204,960.00 | 204,960.00 | 250,000.00 | 250,000.00 | 350,000.00 | 350,000.00 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 16 | EACH | 238.37 | 3,813.92 | 168.00 | 2,688.00 | 150.00 | 2,400.00 | 200.00 | 3,200.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 5,121 | LNFT | 3.87 | 19,818.27 | 2.24 | 11,471.04 | 4.00 | 20,484.00 | 4.25 | 21,764.25 | | 0014 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 7,652.2 | SQYD | 58.35 | 446,505.87 | 66.40 | 508,106.08 | 44.00 | 336,696.80 | 42.00 | 321,392.40 | | 0015 | 302-03-00100 | Base Drain Outlet | 21 | EACH | 2,555.76 | 53,670.96 | 1,232.00 | 25,872.00 | 2,500.00 | 52,500.00 | 850.00 | 17,850.00 | | 0016 | 304-01-00100 | Lime | 43.85 | TON | 427.18 | 18,731.84 | 431.20 | 18,908.12 | 400.00 | 17,540.00 | 400.00 | 17,540.00 | | 0017 | 304-05-00100 | Lime Treatment (Type E) | 3,094 | SQYD | 14.63 | 45,265.22 | 6.72 | 20,791.68 | 5.00 | 15,470.00 | 5.00 | 15,470.00 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 73 | CUYD | 179.89 | 13,131.97 | 112.00 | 8,176.00 | 150.00 | 10,950.00 | 185.00 | 13,505.00 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 146 | CUYD | 181.16 | 26,449.36 | 112.00 | 16,352.00 | 100.00 | 14,600.00 | 185.00 | 27,010.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 1,393.4 | TON | 233.26 | 325,024.48 | 308.00 | 429,167.20 | 280.00 | 390,152.00 | 205.00 | 285,647.00 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 186.8 | TON | 292.61 | 54,659.55 | 369.60 | 69,041.28 | 340.00 | 63,512.00 | 225.00 | 42,030.00 | | 0022 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 152 | SQYD | 260.53 | 39,600.56 | 268.80 | 40,857.60 | 350.00 | 53,200.00 | 230.00 | 34,960.00 | | 0023 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 76 | LNFT | 160.90 | 12,228.40 | 156.80 | 11,916.80 | 100.00 | 7,600.00 | 88.00 | 6,688.00 | | 0024 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 90 | LNFT | 178.78 | 16,090.20 | 190.40 | 17,136.00 | 150.00 | 13,500.00 | 116.00 | 10,440.00 | | 0025 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 48 | LNFT | 269.36 | 12,929.28 | 224.00 | 10,752.00 | 160.00 | 7,680.00 | 150.00 | 7,200.00 | | 0026 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 62 | LNFT | 264.59 | 16,404.58 | 279.78 | 17,346.36 | 180.00 | 11,160.00 | 160.00 | 9,920.00 | | 0027 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 120 | LNFT | 153.75 | 18,450.00 | 320.73 | 38,487.60 | 130.00 | 15,600.00 | 105.00 | 12,600.00 | | 0028 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 74 | LNFT | 224.07 | 16,581.18 | 392.00 | 29,008.00 | 150.00 | 11,100.00 | 130.00 | 9,620.00 | | 0029 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 56 | LNFT | 357.55 | 20,022.80 | 140.00 | 7,840.00 | 210.00 | 11,760.00 | 145.00 | 8,120.00 | | 0030 | 701-05-01067 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 64 | LNFT | 170.43 | 10,907.52 | 162.40 | 10,393.60 | 150.00 | 9,600.00 | 116.00 | 7,424.00 | | 0031 | 701-05-01068 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) | 74 | LNFT | 164.48 | 12,171.52 | 162.40 | 12,017.60 | 150.00 | 11,100.00 | 116.00 | 8,584.00 | | 0032 | 701-05-01105 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 54 | LNFT | 259.82 | 14,030.28 | 196.00 | 10,584.00 | 180.00 | 9,720.00 | 170.00 | 9,180.00 | | 0033 | 701-05-02066 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW/CMP) | 100 | LNFT | 165.67 | 16,567.00 | 140.00 | 14,000.00 | 135.00 | 13,500.00 | 115.00 | 11,500.00 | | 0034 | 701-05-02067 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW) | 60 | LNFT | 182.35 | 10,941.00 | 140.00 | 8,400.00 | 135.00 | 8,100.00 | 120.00 | 7,200.00 | | 0035 | 701-05-02087 | Side Drain Pipe (Erosion) (30" RPVCP/CPEPDW/CPPPDW/CPPPTW) | 120 | LNFT | 199.04 | 23,884.80 | 168.00 | 20,160.00 | 150.00 | 18,000.00 | 130.00 | 15,600.00 | | 0036 | 701-05-02104 | Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 152 | LNFT | 195.46 | 29,709.92 | 190.40 | 28,940.80 | 170.00 | 25,840.00 | 160.00 | 24,320.00 | | 0037 | 701-05-02105 | Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CPPPDW/CPPPTW) | 100 | LNFT | 219.30 | 21,930.00 | 190.40 | 19,040.00 | 170.00 | 17,000.00 | 160.00 | 16,000.00 | | 0038 | 701-06-00080 | Side Drain Pipe Arch (36" Equiv. RCPA) | 78 | LNFT | 332.53 | 25,937.34 | 252.00 | 19,656.00 | 220.00 | 17,160.00 | 191.00 | 14,898.00 | | 0039 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 6,921.07 | 48,447.49 | 5,600.00 | 39,200.00 | 5,000.00 | 35,000.00 | 7,500.00 | 52,500.00 | | 0040 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 14,392.77 | 14,392.77 | 9,520.00 | 9,520.00 | 8,000.00 | 8,000.00 | 8,600.00 | 8,600.00 | | 0041 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 14,183.01 | 14,183.01 | 2,800.00 | 2,800.00 | 8,000.00 | 8,000.00 | 4,500.00 | 4,500.00 | | 0042 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 643.9 | LNFT | 44.10 | 28,395.99 | 35.00 | 22,536.50 | 37.00 | 23,824.30 | 45.00 | 28,975.50 | | 0043 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 175 | LNFT | 160.90 | 28,157.50 | 140.00 | 24,500.00 | 135.00 | 23,625.00 | 125.00 | 21,875.00 | | 0044 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 1 | EACH | 4,469.44 | 4,469.44 | 4,004.00 | 4,004.00 | 3,750.00 | 3,750.00 | 3,900.00 | 3,900.00 | | 0045 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 10 | EACH | 4,946.18 | 49,461.80 | 4,004.00 | 40,040.00 | 4,150.00 | 41,500.00 | 3,900.00 | 39,000.00 | | 0046 | 705-01-00100 | Barbed Wire Fence | 2,368 | LNFT | 17.58 | 41,629.44 | 13.44 | 31,825.92 | 12.00 | 28,416.00 | 12.50 | 29,600.00 | | 0047 | 705-05-00100 | Double Swinging Driveway Gates | 5 | DBGT | 1,013.07 | 5,065.35 | 2,352.00 | 11,760.00 | 2,100.00 | 10,500.00 | 900.00 | 4,500.00 | | 0048 | 708-01-00100 | Right-of-Way Monument | 34 | EACH | 774.70 | 26,339.80 | 672.00 | 22,848.00 | 200.00 | 6,800.00 | 600.00 | 20,400.00 | | 0049 | 708-02-00100 | Right-of-Way Monument Witness Post | 30 | EACH | 357.56 | 10,726.80 | 224.00 | 6,720.00 | 600.00 | 18,000.00 | 200.00 | 6,000.00 | | 0050 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,909 | SQYD | 107.83 | 205,847.47 | 114.24 | 218,084.16 | 130.00 | 248,170.00 | 148.00 | 282,532.00 | | 0051 | 711-04-00100 | Geotextile Fabric | 1,909 | SQYD | 5.07 | 9,678.63 | 4.48 | 8,552.32 | 5.00 | 9,545.00 | 4.00 | 7,636.00 | | 0052 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 94,725.61 | 94,725.61 | 60,107.56 | 60,107.56 | 250,000.00 | 250,000.00 | 75,000.00 | 75,000.00 | | 0053 | 716-01-00100 | Mulch (Vegetative) | 6.1 | TON | 1,191.85 | 7,270.29 | 896.00 | 5,465.60 | 800.00 | 4,880.00 | 1,200.00 | 7,320.00 | | 0054 | 717-01-00100 | Seeding | 123 | LB | 17.58 | 2,162.34 | 28.00 | 3,444.00 | 25.00 | 3,075.00 | 25.00 | 3,075.00 | | 0055 | 718-01-00100 | Fertilizer | 4,100 | LB | 1.19 | 4,879.00 | 1.12 | 4,592.00 | 1.00 | 4,100.00 | 1.00 | 4,100.00 | | 0056 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,653 | SQYD | 2.98 | 7,905.94 | 2.24 | 5,942.72 | 2.00 | 5,306.00 | 3.10 | 8,224.30 | | 0057 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 409 | SQYD | 2.98 | 1,218.82 | 3.36 | 1,374.24 | 3.00 | 1,227.00 | 3.10 | 1,267.90 | | 0058 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 93,560.18 | 93,560.18 | 16,800.00 | 16,800.00 | 18,000.00 | 18,000.00 | 18,000.00 | 18,000.00 | | 0059 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.686 | MILE | 599.40 | 411.19 | 6,440.00 | 4,417.84 | 500.00 | 343.00 | 10,000.00 | 6,860.00 | | 0060 | 726-01-00100 | Bedding Material | 151.9 | CUYD | 119.18 | 18,103.44 | 112.00 | 17,012.80 | 210.00 | 31,899.00 | 165.00 | 25,063.50 | | 0061 | 727-01-00100 | Mobilization | 1 | LUMP | 197,530.50 | 197,530.50 | 482,373.86 | 482,373.86 | 649,000.00 | 649,000.00 | 700,000.00 | 700,000.00 | | 0062 | 729-01-00100 | Sign (Type A) | 6.3 | SQFT | 119.19 | 750.90 | 72.80 | 458.64 | 50.00 | 315.00 | 100.00 | 630.00 | | 0063 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 160.90 | 1,930.80 | 140.00 | 1,680.00 | 135.00 | 1,620.00 | 125.00 | 1,500.00 | | 0064 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 1 | EACH | 595.92 | 595.92 | 224.00 | 224.00 | 150.00 | 150.00 | 500.00 | 500.00 | | 0065 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 516 | EACH | 29.80 | 15,376.80 | 28.00 | 14,448.00 | 25.00 | 12,900.00 | 22.00 | 11,352.00 | | 0066 | 731-02-00100 | Reflectorized Raised Pavement Markers | 69 | EACH | 29.80 | 2,056.20 | 28.00 | 1,932.00 | 25.00 | 1,725.00 | 20.00 | 1,380.00 | | 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 41 | LNFT | 59.59 | 2,443.19 | 92.96 | 3,811.36 | 50.00 | 2,050.00 | 50.00 | 2,050.00 | | 0068 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 118 | LNFT | 29.80 | 3,516.40 | 28.00 | 3,304.00 | 25.00 | 2,950.00 | 5.00 | 590.00 | | 0069 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.996 | MILE | 17,949.54 | 17,877.74 | 16,800.00 | 16,732.80 | 15,000.00 | 14,940.00 | 10,000.00 | 9,960.00 | | 0070 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.41 | MILE | 17,877.73 | 7,329.87 | 16,800.00 | 6,888.00 | 15,000.00 | 6,150.00 | 10,000.00 | 4,100.00 | | 0071 | 740-01-00100 | Construction Layout | 1 | LUMP | 34,094.09 | 34,094.09 | 129,727.64 | 129,727.64 | 250,000.00 | 250,000.00 | 75,000.00 | 75,000.00 | | 0072 | 804-01-00400 | Precast Concrete Piles (18") | 4,520 | LNFT | 162.95 | 736,534.00 | 190.63 | 861,647.60 | 210.00 | 949,200.00 | 225.00 | 1,017,000.00 | | 0073 | 805-01-00100 | Class A1 Concrete (Slab Span) | 331.75 | CUYD | 2,052.97 | 681,072.80 | 2,046.00 | 678,760.50 | 350.00 | 116,112.50 | 1,700.00 | 563,975.00 | | 0074 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 102.22 | CUYD | 2,980.79 | 304,696.35 | 3,545.00 | 362,369.90 | 350.00 | 35,777.00 | 2,500.00 | 255,550.00 | | 0075 | 805-15-01200 | Reinforced Concrete Box Culverts (Precast) (6' x 6') | 192 | LNFT | 1,009.05 | 193,737.60 | 1,746.80 | 335,385.60 | 2,000.00 | 384,000.00 | 1,800.00 | 345,600.00 | | 0076 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 4 – 6’ X 6’ 90° RCB, 11.86 CUYD, 725 LBS | 2 | EACH | 30,935.05 | 61,870.10 | 73,360.00 | 146,720.00 | 100,000.00 | 200,000.00 | 75,000.00 | 150,000.00 | | 0077 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 3,034 | SQFT | 6.01 | 18,234.34 | 10.92 | 33,131.28 | 2.00 | 6,068.00 | 3.00 | 9,102.00 | | 0078 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,034 | SQFT | 6.01 | 18,234.34 | 11.16 | 33,859.44 | 3.00 | 9,102.00 | 3.00 | 9,102.00 | | 0079 | 806-01-00100 | Deformed Reinforcing Steel | 84,454 | LB | 1.28 | 108,101.12 | 1.23 | 103,878.42 | 3.00 | 253,362.00 | 2.00 | 168,908.00 | | 0080 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 440 | LNFT | 586.17 | 257,914.80 | 348.10 | 153,164.00 | 350.00 | 154,000.00 | 240.00 | 105,600.00 | | 0081 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,400 | SQFT | 95.35 | 228,840.00 | 115.06 | 276,144.00 | 225.00 | 540,000.00 | 135.00 | 324,000.00 | | 0082 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 264 | SFIN | 112.86 | 29,795.04 | 139.17 | 36,740.88 | 150.00 | 39,600.00 | 120.00 | 31,680.00 | | 0083 | 815-03-00300 | Joint Seal (Poured) | 438 | LNFT | 16.66 | 7,297.08 | 38.71 | 16,954.98 | 40.00 | 17,520.00 | 20.00 | 8,760.00 | | 0084 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 366 | LNFT | 11.91 | 4,359.06 | 13.89 | 5,083.74 | 20.00 | 7,320.00 | 15.00 | 5,490.00 | | 0085 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 488 | LNFT | 11.91 | 5,812.08 | 6.03 | 2,942.64 | 1.00 | 488.00 | 5.00 | 2,440.00 | | 0086 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 742 | INLF | 11.91 | 8,837.22 | 4.23 | 3,138.66 | 1.00 | 742.00 | 2.00 | 1,484.00 | | 0087 | NS-700-00860 | Impact Attenuator (Low Maintenance, Test Level 3) | 1 | EACH | 36,947.33 | 36,947.33 | 23,084.28 | 23,084.28 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,929,094.47 | | 6,172,624.20 | | 6,494,183.10 | | 6,697,894.05 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | - 6 - Diamond B Construction Co., L.L.C. | - 7 - Reliant Industrial Solutions L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.1 | LUMP | 600,000.00 | 600,000.00 | 95,000.00 | 95,000.00 | 85,000.00 | 85,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 75,000.00 | 75,000.00 | 4,500.00 | 4,500.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 15 | SQYD | 100.00 | 1,500.00 | 500.00 | 7,500.00 | 72.00 | 1,080.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 4,728.7 | SQYD | 8.00 | 37,829.60 | 10.00 | 47,287.00 | 17.00 | 80,387.90 | | 0005 | 202-02-04501 | Removal of Bridge (Sta. 105+45.91; 133’x28’ Precast Concrete Slab Bridge) | 4,123 | LUMP | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | 90,000.00 | 90,000.00 | | 0006 | 202-02-04501 | Removal of Bridge (Sta. 205+40.22; 57’x28’ Precast Concrete Slab Bridge) | 1,767 | LUMP | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 27,000.00 | 27,000.00 | | 0007 | 202-02-04501 | Removal of Bridge (Sta. 305+43.45; 57’x28’ Precast Concrete Slab Bridge) | 1,767 | LUMP | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 27,000.00 | 27,000.00 | | 0008 | 202-02-12000 | Removal of Fence | 2,530 | LNFT | 5.00 | 12,650.00 | 3.00 | 7,590.00 | 1.95 | 4,933.50 | | 0009 | 202-02-14500 | Removal of Guard Rail | 601.8 | LNFT | 10.00 | 6,018.00 | 23.00 | 13,841.40 | 13.75 | 8,274.75 | | 0010 | 203-02-00100 | Drainage Excavation | 1,296 | CUYD | 25.00 | 32,400.00 | 40.00 | 51,840.00 | 39.50 | 51,192.00 | | 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 183,000.00 | 183,000.00 | 300,000.00 | 300,000.00 | 255,000.00 | 255,000.00 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 16 | EACH | 150.00 | 2,400.00 | 210.00 | 3,360.00 | 180.00 | 2,880.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 5,121 | LNFT | 5.00 | 25,605.00 | 3.00 | 15,363.00 | 2.40 | 12,290.40 | | 0014 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 7,652.2 | SQYD | 58.00 | 443,827.60 | 35.00 | 267,827.00 | 46.00 | 352,001.20 | | 0015 | 302-03-00100 | Base Drain Outlet | 21 | EACH | 1,700.00 | 35,700.00 | 800.00 | 16,800.00 | 769.00 | 16,149.00 | | 0016 | 304-01-00100 | Lime | 43.85 | TON | 385.00 | 16,882.25 | 485.00 | 21,267.25 | 500.00 | 21,925.00 | | 0017 | 304-05-00100 | Lime Treatment (Type E) | 3,094 | SQYD | 6.00 | 18,564.00 | 16.00 | 49,504.00 | 27.10 | 83,847.40 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 73 | CUYD | 300.00 | 21,900.00 | 190.00 | 13,870.00 | 223.00 | 16,279.00 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 146 | CUYD | 100.00 | 14,600.00 | 154.00 | 22,484.00 | 198.00 | 28,908.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 1,393.4 | TON | 275.00 | 383,185.00 | 220.00 | 306,548.00 | 329.80 | 459,543.32 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 186.8 | TON | 330.00 | 61,644.00 | 500.00 | 93,400.00 | 396.00 | 73,972.80 | | 0022 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 152 | SQYD | 240.00 | 36,480.00 | 250.00 | 38,000.00 | 326.00 | 49,552.00 | | 0023 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 76 | LNFT | 150.00 | 11,400.00 | 175.00 | 13,300.00 | 144.25 | 10,963.00 | | 0024 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 90 | LNFT | 180.00 | 16,200.00 | 175.00 | 15,750.00 | 159.00 | 14,310.00 | | 0025 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 48 | LNFT | 200.00 | 9,600.00 | 275.00 | 13,200.00 | 205.00 | 9,840.00 | | 0026 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 62 | LNFT | 315.00 | 19,530.00 | 255.00 | 15,810.00 | 215.50 | 13,361.00 | | 0027 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 120 | LNFT | 150.00 | 18,000.00 | 200.00 | 24,000.00 | 159.60 | 19,152.00 | | 0028 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 74 | LNFT | 200.00 | 14,800.00 | 225.00 | 16,650.00 | 192.75 | 14,263.50 | | 0029 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 56 | LNFT | 230.00 | 12,880.00 | 250.00 | 14,000.00 | 169.50 | 9,492.00 | | 0030 | 701-05-01067 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 64 | LNFT | 180.00 | 11,520.00 | 195.00 | 12,480.00 | 134.00 | 8,576.00 | | 0031 | 701-05-01068 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) | 74 | LNFT | 180.00 | 13,320.00 | 185.00 | 13,690.00 | 173.00 | 12,802.00 | | 0032 | 701-05-01105 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 54 | LNFT | 315.00 | 17,010.00 | 255.00 | 13,770.00 | 221.75 | 11,974.50 | | 0033 | 701-05-02066 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW/CMP) | 100 | LNFT | 165.00 | 16,500.00 | 155.00 | 15,500.00 | 145.25 | 14,525.00 | | 0034 | 701-05-02067 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW) | 60 | LNFT | 165.00 | 9,900.00 | 195.00 | 11,700.00 | 144.50 | 8,670.00 | | 0035 | 701-05-02087 | Side Drain Pipe (Erosion) (30" RPVCP/CPEPDW/CPPPDW/CPPPTW) | 120 | LNFT | 160.00 | 19,200.00 | 225.00 | 27,000.00 | 174.50 | 20,940.00 | | 0036 | 701-05-02104 | Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 152 | LNFT | 250.00 | 38,000.00 | 225.00 | 34,200.00 | 205.50 | 31,236.00 | | 0037 | 701-05-02105 | Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CPPPDW/CPPPTW) | 100 | LNFT | 250.00 | 25,000.00 | 195.00 | 19,500.00 | 231.00 | 23,100.00 | | 0038 | 701-06-00080 | Side Drain Pipe Arch (36" Equiv. RCPA) | 78 | LNFT | 325.00 | 25,350.00 | 275.00 | 21,450.00 | 270.50 | 21,099.00 | | 0039 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 7,000.00 | 49,000.00 | 6,000.00 | 42,000.00 | 9,250.00 | 64,750.00 | | 0040 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 12,350.00 | 12,350.00 | | 0041 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 10,000.00 | 10,000.00 | 5,800.00 | 5,800.00 | 10,000.00 | 10,000.00 | | 0042 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 643.9 | LNFT | 31.00 | 19,960.90 | 37.00 | 23,824.30 | 54.00 | 34,770.60 | | 0043 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 175 | LNFT | 125.00 | 21,875.00 | 135.00 | 23,625.00 | 150.00 | 26,250.00 | | 0044 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 1 | EACH | 3,575.00 | 3,575.00 | 3,750.00 | 3,750.00 | 4,700.00 | 4,700.00 | | 0045 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 10 | EACH | 3,575.00 | 35,750.00 | 4,200.00 | 42,000.00 | 4,700.00 | 47,000.00 | | 0046 | 705-01-00100 | Barbed Wire Fence | 2,368 | LNFT | 12.00 | 28,416.00 | 15.00 | 35,520.00 | 14.40 | 34,099.20 | | 0047 | 705-05-00100 | Double Swinging Driveway Gates | 5 | DBGT | 2,100.00 | 10,500.00 | 900.00 | 4,500.00 | 2,500.00 | 12,500.00 | | 0048 | 708-01-00100 | Right-of-Way Monument | 34 | EACH | 600.00 | 20,400.00 | 600.00 | 20,400.00 | 235.00 | 7,990.00 | | 0049 | 708-02-00100 | Right-of-Way Monument Witness Post | 30 | EACH | 200.00 | 6,000.00 | 200.00 | 6,000.00 | 100.00 | 3,000.00 | | 0050 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,909 | SQYD | 129.00 | 246,261.00 | 125.00 | 238,625.00 | 159.50 | 304,485.50 | | 0051 | 711-04-00100 | Geotextile Fabric | 1,909 | SQYD | 3.00 | 5,727.00 | 1.00 | 1,909.00 | 4.00 | 7,636.00 | | 0052 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 120,000.00 | 120,000.00 | 435,000.00 | 435,000.00 | 120,000.00 | 120,000.00 | | 0053 | 716-01-00100 | Mulch (Vegetative) | 6.1 | TON | 800.00 | 4,880.00 | 1,000.00 | 6,100.00 | 961.50 | 5,865.15 | | 0054 | 717-01-00100 | Seeding | 123 | LB | 25.00 | 3,075.00 | 14.75 | 1,814.25 | 30.00 | 3,690.00 | | 0055 | 718-01-00100 | Fertilizer | 4,100 | LB | 1.00 | 4,100.00 | 1.00 | 4,100.00 | 1.20 | 4,920.00 | | 0056 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 2,653 | SQYD | 2.00 | 5,306.00 | 2.50 | 6,632.50 | 2.40 | 6,367.20 | | 0057 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 409 | SQYD | 3.00 | 1,227.00 | 2.50 | 1,022.50 | 3.60 | 1,472.40 | | 0058 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,000.00 | 15,000.00 | 150,000.00 | 150,000.00 | 53,250.00 | 53,250.00 | | 0059 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.686 | MILE | 495.00 | 339.57 | 1,600.00 | 1,097.60 | 19,500.00 | 13,377.00 | | 0060 | 726-01-00100 | Bedding Material | 151.9 | CUYD | 215.00 | 32,658.50 | 155.00 | 23,544.50 | 308.00 | 46,785.20 | | 0061 | 727-01-00100 | Mobilization | 1 | LUMP | 680,000.00 | 680,000.00 | 720,000.00 | 720,000.00 | 730,000.00 | 730,000.00 | | 0062 | 729-01-00100 | Sign (Type A) | 6.3 | SQFT | 55.00 | 346.50 | 55.00 | 346.50 | 625.00 | 3,937.50 | | 0063 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 90.00 | 1,080.00 | 135.00 | 1,620.00 | 162.00 | 1,944.00 | | 0064 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 1 | EACH | 160.00 | 160.00 | 155.00 | 155.00 | 1,000.00 | 1,000.00 | | 0065 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 516 | EACH | 25.00 | 12,900.00 | 25.00 | 12,900.00 | 30.00 | 15,480.00 | | 0066 | 731-02-00100 | Reflectorized Raised Pavement Markers | 69 | EACH | 25.00 | 1,725.00 | 25.00 | 1,725.00 | 30.00 | 2,070.00 | | 0067 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 41 | LNFT | 50.00 | 2,050.00 | 50.00 | 2,050.00 | 60.00 | 2,460.00 | | 0068 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 118 | LNFT | 25.00 | 2,950.00 | 25.00 | 2,950.00 | 30.00 | 3,540.00 | | 0069 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.996 | MILE | 14,900.00 | 14,840.40 | 15,000.00 | 14,940.00 | 18,000.00 | 17,928.00 | | 0070 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.41 | MILE | 15,000.00 | 6,150.00 | 15,000.00 | 6,150.00 | 18,000.00 | 7,380.00 | | 0071 | 740-01-00100 | Construction Layout | 1 | LUMP | 130,000.00 | 130,000.00 | 95,000.00 | 95,000.00 | 100,000.00 | 100,000.00 | | 0072 | 804-01-00400 | Precast Concrete Piles (18") | 4,520 | LNFT | 175.00 | 791,000.00 | 240.00 | 1,084,800.00 | 175.00 | 791,000.00 | | 0073 | 805-01-00100 | Class A1 Concrete (Slab Span) | 331.75 | CUYD | 2,500.00 | 829,375.00 | 2,100.00 | 696,675.00 | 3,735.00 | 1,239,086.25 | | 0074 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 102.22 | CUYD | 3,500.00 | 357,770.00 | 3,800.00 | 388,436.00 | 4,575.00 | 467,656.50 | | 0075 | 805-15-01200 | Reinforced Concrete Box Culverts (Precast) (6' x 6') | 192 | LNFT | 1,250.00 | 240,000.00 | 1,850.00 | 355,200.00 | 1,470.00 | 282,240.00 | | 0076 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall 4 – 6’ X 6’ 90° RCB, 11.86 CUYD, 725 LBS | 2 | EACH | 60,000.00 | 120,000.00 | 130,000.00 | 260,000.00 | 63,000.00 | 126,000.00 | | 0077 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 3,034 | SQFT | 1.50 | 4,551.00 | 7.00 | 21,238.00 | 2.25 | 6,826.50 | | 0078 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 3,034 | SQFT | 2.50 | 7,585.00 | 14.00 | 42,476.00 | 6.60 | 20,024.40 | | 0079 | 806-01-00100 | Deformed Reinforcing Steel | 84,454 | LB | 1.60 | 135,126.40 | 1.75 | 147,794.50 | 1.40 | 118,235.60 | | 0080 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 440 | LNFT | 240.00 | 105,600.00 | 225.00 | 99,000.00 | 338.25 | 148,830.00 | | 0081 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,400 | SQFT | 145.00 | 348,000.00 | 110.00 | 264,000.00 | 124.50 | 298,800.00 | | 0082 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 264 | SFIN | 88.00 | 23,232.00 | 200.00 | 52,800.00 | 265.00 | 69,960.00 | | 0083 | 815-03-00300 | Joint Seal (Poured) | 438 | LNFT | 25.00 | 10,950.00 | 15.00 | 6,570.00 | 12.10 | 5,299.80 | | 0084 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 366 | LNFT | 10.00 | 3,660.00 | 11.00 | 4,026.00 | 12.10 | 4,428.60 | | 0085 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 488 | LNFT | 2.00 | 976.00 | 11.00 | 5,368.00 | 2.40 | 1,171.20 | | 0086 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 742 | INLF | 2.00 | 1,484.00 | 1.00 | 742.00 | 2.40 | 1,780.80 | | 0087 | NS-700-00860 | Impact Attenuator (Low Maintenance, Test Level 3) | 1 | EACH | 55,000.00 | 55,000.00 | 62,500.00 | 62,500.00 | 60,000.00 | 60,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,827,957.72 | | 7,345,208.30 | | 7,348,357.67 |
|