Proposal:H.013821.6
Parish:Natchitoches
Routes:LA 6
Description:LA 6: YOUNGS BAYOU BRIDGES
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, SOIL NAIL WALL, AND RELATED WORK.
Estimated Construction Cost:$2,903,853.78
| Rank | License | Bidder | Construction Bid |
| 1 | 52306 | SIEMA CONSTRUCTION, LLC | $2,854,750.00 |
| 2 | 55505 | MERRICK, LLC | $2,990,009.85 |
| 3 | 27239 | Apeck Construction, LLC | $3,542,551.47 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SIEMA CONSTRUCTION, LLC | - 2 - MERRICK, LLC | - 3 - Apeck Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3 | LUMP | 49,999.69 | 49,999.69 | 20,000.00 | 20,000.00 | 17,046.36 | 17,046.36 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 29,504.26 | 29,504.26 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 280 | SQYD | 58.00 | 16,240.00 | 20.00 | 5,600.00 | 54.37 | 15,223.60 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 1,100.00 | 2,200.00 | 1,700.00 | 3,400.00 | 3,390.05 | 6,780.10 | | 0005 | 202-02-06140 | Removal of Curbs (Concrete) | 140.3 | LNFT | 38.00 | 5,331.40 | 6.00 | 841.80 | 20.40 | 2,862.12 | | 0006 | 202-02-14500 | Removal of Guard Rail | 91 | LNFT | 29.00 | 2,639.00 | 20.00 | 1,820.00 | 15.51 | 1,411.41 | | 0007 | 202-02-32140 | Removal of Pipe (Storm Drain) Storm Drain | 310 | LNFT | 41.00 | 12,710.00 | 25.00 | 7,750.00 | 65.61 | 20,339.10 | | 0008 | 202-02-38200 | Removal of Signs | 5 | EACH | 29.00 | 145.00 | 115.00 | 575.00 | 119.29 | 596.45 | | 0009 | 202-02-38220 | Removal of Sign Supports | 5 | EACH | 350.00 | 1,750.00 | 165.00 | 825.00 | 178.93 | 894.65 | | 0010 | 203-01-00100 | General Excavation | 7,627 | CUYD | 18.00 | 137,286.00 | 15.00 | 114,405.00 | 65.25 | 497,661.75 | | 0011 | 203-02-00100 | Drainage Excavation | 1,535 | CUYD | 28.00 | 42,980.00 | 25.00 | 38,375.00 | 160.85 | 246,904.75 | | 0012 | 203-07-00100 | Borrow (Vehicular Measurement) | 9,214.906 | CUYD | 44.00 | 405,455.86 | 25.00 | 230,372.65 | 26.68 | 245,853.69 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 287.00 | 574.00 | 400.00 | 800.00 | 298.23 | 596.46 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 916 | LNFT | 2.50 | 2,290.00 | 4.00 | 3,664.00 | 3.46 | 3,169.36 | | 0015 | 302-02-08030 | Class II Base Course (8" Thick) (Asphalt Concrete Base on Embankment Layer) | 295.6 | SQYD | 190.00 | 56,164.00 | 190.00 | 56,164.00 | 245.11 | 72,454.52 | | 0016 | 502-01-00100 | Asphalt Concrete | 110.3 | TON | 285.00 | 31,435.50 | 500.00 | 55,150.00 | 367.86 | 40,574.96 | | 0017 | 602-12-00100 | Undersealing Pavement | 2.2 | TON | 3,400.00 | 7,480.00 | 4,400.00 | 9,680.00 | 4,175.15 | 9,185.33 | | 0018 | 602-14-00100 | Holes | 20 | EACH | 175.00 | 3,500.00 | 600.00 | 12,000.00 | 596.45 | 11,929.00 | | 0019 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 42 | LNFT | 208.00 | 8,736.00 | 210.00 | 8,820.00 | 243.91 | 10,244.22 | | 0020 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 84 | LNFT | 121.00 | 10,164.00 | 180.00 | 15,120.00 | 121.96 | 10,244.64 | | 0021 | 701-03-02082 | Storm Drain Pipe (Outfall) (36" RPVCP or 42" CMP) | 250 | LNFT | 168.00 | 42,000.00 | 210.00 | 52,500.00 | 168.38 | 42,095.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 376 | LNFT | 27.00 | 10,152.00 | 30.00 | 11,280.00 | 1.19 | 447.44 | | 0023 | 702-02-00100 | Manholes (MH-06) | 2 | EACH | 7,400.00 | 14,800.00 | 8,000.00 | 16,000.00 | 7,565.19 | 15,130.38 | | 0024 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 6,000.00 | 12,000.00 | 6,500.00 | 13,000.00 | 11,777.44 | 23,554.88 | | 0025 | 702-03-01000 | Catch Basins (CB-2TOP02) (CB-06) | 2 | EACH | 6,500.00 | 13,000.00 | 7,000.00 | 14,000.00 | 13,829.88 | 27,659.76 | | 0026 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 3,300.00 | 3,300.00 | 4,000.00 | 4,000.00 | 6,085.10 | 6,085.10 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 31 | LNFT | 41.00 | 1,271.00 | 44.00 | 1,364.00 | 44.14 | 1,368.34 | | 0028 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 25 | LNFT | 149.00 | 3,725.00 | 160.00 | 4,000.00 | 161.04 | 4,026.00 | | 0029 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 4,025.00 | 4,025.00 | 4,400.00 | 4,400.00 | 4,473.37 | 4,473.37 | | 0030 | 707-01-00100 | Concrete Curb (Mountable) | 140.3 | LNFT | 41.00 | 5,752.30 | 55.00 | 7,716.50 | 127.57 | 17,898.07 | | 0031 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 25 | SQYD | 225.00 | 5,625.00 | 275.00 | 6,875.00 | 427.66 | 10,691.50 | | 0032 | 712-04-00100 | Flexible Revetment | 2,253 | SQYD | 74.00 | 166,722.00 | 65.00 | 146,445.00 | 155.08 | 349,395.24 | | 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 135,000.00 | 135,000.00 | 150,000.00 | 150,000.00 | 78,325.55 | 78,325.55 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.016 | MILE | 1,375.00 | 2,772.00 | 1,400.00 | 2,822.40 | 1,434.32 | 2,891.59 | | 0035 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 33 | EACH | 1,120.00 | 36,960.00 | 1,000.00 | 33,000.00 | 1,220.08 | 40,262.64 | | 0036 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 33 | EACH | 245.00 | 8,085.00 | 90.00 | 2,970.00 | 401.28 | 13,242.24 | | 0037 | 720-01-02060 | Erosion Control System, Flexible (Channel Liner) (Type F) | 10,000 | SQYD | 2.50 | 25,000.00 | 3.00 | 30,000.00 | 2.21 | 22,100.00 | | 0038 | 726-01-00100 | Bedding Material | 47.9 | CUYD | 255.00 | 12,214.50 | 150.00 | 7,185.00 | 146.44 | 7,014.48 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 280,000.00 | 280,000.00 | 290,000.00 | 290,000.00 | 122,276.65 | 122,276.65 | | 0040 | 729-01-00100 | Sign (Type A) | 23.6 | SQFT | 40.00 | 944.00 | 40.00 | 944.00 | 59.64 | 1,407.50 | | 0041 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 5 | EACH | 287.00 | 1,435.00 | 300.00 | 1,500.00 | 178.93 | 894.65 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 29 | EACH | 7.00 | 203.00 | 7.50 | 217.50 | 7.16 | 207.64 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.395 | MILE | 11,250.00 | 4,443.75 | 12,000.00 | 4,740.00 | 11,838.38 | 4,676.16 | | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.198 | MILE | 8,000.00 | 1,584.00 | 8,500.00 | 1,683.00 | 8,374.39 | 1,658.13 | | 0045 | 739-01-00100 | Hydro-Seeding | 2.62 | ACRE | 3,050.00 | 7,991.00 | 3,300.00 | 8,646.00 | 3,697.98 | 9,688.71 | | 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 13,200.00 | 13,200.00 | 25,000.00 | 25,000.00 | 22,749.39 | 22,749.39 | | 0047 | 805-01-00900 | Class A1 Concrete (Wingwall Extension) | 38 | CUYD | 2,825.00 | 107,350.00 | 1,300.00 | 49,400.00 | 2,416.48 | 91,826.24 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel | 1,028 | LB | 11.50 | 11,822.00 | 3.00 | 3,084.00 | 4.70 | 4,831.60 | | 0049 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 5,214 | INLF | 1.50 | 7,821.00 | 2.50 | 13,035.00 | 2.39 | 12,461.46 | | 0050 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 11,000.00 | 22,000.00 | 15,000.00 | 30,000.00 | 17,893.47 | 35,786.94 | | 0051 | NS-702-00101 | Paved Gutter Drain (Single) | 1 | EACH | 16,800.00 | 16,800.00 | 16,000.00 | 16,000.00 | 13,625.53 | 13,625.53 | | 0052 | NS-802-00015 | Soil Nail Wall | 6,208 | SQFT | 171.50 | 1,064,672.00 | 230.00 | 1,427,840.00 | 211.07 | 1,310,322.56 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,854,750.00 | | 2,990,009.85 | | 3,542,551.47 |
|