Search


Bid Tabulations for the Letting of 9/10/2025 LA DOTD Headquarters

Proposal:H.007538.6
Parish:Rapides
Routes:LA 498
Description:LA 498: ENGLAND AIRPARK TO LA 1 GATEWAY
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, ASPHALT CONCRETE, CONCRETE WALKS AND DRIVES, SAFETY RAILS, LANDSCAPING, AND RELATED WORK.
Estimated Construction Cost:$1,790,525.50
Rank License BidderConstruction Bid
130774Progressive Construction Co., LLC$2,009,441.50
255505MERRICK, LLC$2,129,345.35
368424Procivil, LLC$2,258,864.50


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Progressive Construction Co., LLC
- 2 -
MERRICK, LLC
- 3 -
Procivil, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 2.3   LUMP100,000.00100,000.0010,000.0010,000.0025,000.0025,000.00
0002202-01-00100Removal of Structures and Obstructions 1     LUMP5,000.005,000.007,000.007,000.005,000.005,000.00
0003202-02-02000Removal of Asphalt Drives 534     SQYD10.005,340.006.003,204.0015.008,010.00
0004202-02-02020Removal of Asphalt Pavement 262.6   SQYD10.002,626.0018.004,726.8015.003,939.00
0005202-02-06100Removal of Concrete Walks and Drives 89     SQYD10.00890.0012.001,068.0015.001,335.00
0006202-02-32120Removal of Pipe (Side Drain) (15" PVC)32     LNFT15.00480.0030.00960.0010.00320.00
0007202-02-32120Removal of Pipe (Side Drain) (18" CMP)74     LNFT20.001,480.0030.002,220.0010.00740.00
0008202-02-32120Removal of Pipe (Side Drain) (18" RCP)60     LNFT20.001,200.0030.001,800.0010.00600.00
0009202-02-32120Removal of Pipe (Side Drain) (24" CMP)235     LNFT25.005,875.0030.007,050.0015.003,525.00
0010202-02-32120Removal of Pipe (Side Drain) (24" RCP)207     LNFT25.005,175.0030.006,210.0015.003,105.00
0011202-02-32120Removal of Pipe (Side Drain) (30" CMP)140     LNFT30.004,200.0030.004,200.0015.002,100.00
0012202-02-32120Removal of Pipe (Side Drain) (30" PP)58     LNFT30.001,740.0030.001,740.0020.001,160.00
0013202-02-32120Removal of Pipe (Side Drain) (30" RCP)49     LNFT30.001,470.0030.001,470.0020.00980.00
0014202-02-32180Removal of Pipe Headwalls 1     EACH1,000.001,000.001,000.001,000.001,000.001,000.00
0015202-03-38000Relocation of Sign 3     EACH197.00591.00350.001,050.00300.00900.00
0016203-05-00100Excavation and Embankment 1     LUMP50,000.0050,000.0055,000.0055,000.00125,000.00125,000.00
0017204-05-00100Temporary Sediment Check Dams (Hay) 24     EACH226.005,424.00110.002,640.00200.004,800.00
0018204-06-00100Temporary Silt Fencing 3,660     LNFT4.2515,555.002.509,150.002.007,320.00
0019402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 1,000     CUYD60.0060,000.0070.0070,000.0050.0050,000.00
0020502-01-00100Asphalt Concrete 1,935.1   TON225.00435,397.50270.00522,477.00235.00454,748.50
0021701-05-01043Side Drain Pipe (18" RCP/RPVCP/CMP) 48     LNFT119.005,712.00115.005,520.00130.006,240.00
0022701-05-01102Side Drain Pipe (36" RCP/RPVCP/CMP) 116     LNFT200.0023,200.00185.0021,460.00260.0030,160.00
0023701-06-00040Side Drain Pipe Arch (24" Equiv. RCPA) 110     LNFT180.0019,800.00150.0016,500.00180.0019,800.00
0024701-06-00060Side Drain Pipe Arch (30" Equiv. RCPA) 16     LNFT170.002,720.00230.003,680.00230.003,680.00
0025701-06-00080Side Drain Pipe Arch (36" Equiv. RCPA) 392     LNFT210.0082,320.00240.0094,080.00280.00109,760.00
0026703-03-00100Perforated Pipe Underdrains 774     LNFT22.0017,028.0035.0027,090.0030.0023,220.00
0027706-01-00100Concrete Walk (4" Thick) 521.5   SQYD78.0040,677.0095.0049,542.5090.0046,935.00
0028706-01-00100Concrete Walk (4" Thick) (WITH KEY)652.4   SQYD87.0056,758.80105.0068,502.00100.0065,240.00
0029706-01-00300Concrete Walk (6" Thick) 118.5   SQYD92.0010,902.00130.0015,405.00110.0013,035.00
0030706-01-00300Concrete Walk (6" Thick) (WITH KEY)26.1   SQYD100.002,610.00150.003,915.00120.003,132.00
0031706-02-00200Concrete Drive (6" Thick) 939.1   SQYD115.00107,996.50115.00107,996.50110.00103,301.00
0032706-03-00300Incidental Concrete Paving (6" Thick) 301.2   SQYD140.0042,168.00165.0049,698.00200.0060,240.00
0033713-01-00100Temporary Signs and Barricades 1     LUMP35,000.0035,000.0060,000.0060,000.0050,000.0050,000.00
0034719-01-01300Plants (Tree) (Balled and Burlapped) (Specimen) (BALD CYPRESS) (8' - 12' TALL)248     EACH575.00142,600.00550.00136,400.00500.00124,000.00
0035720-01-01020Erosion Control System (Slope Protection) (Type B) 3,982     SQYD2.007,964.002.258,959.502.007,964.00
0036724-02-00100Rumble Strips (Shoulder/Edge) 1.223 MILE1,111.001,358.755,000.006,115.001,200.001,467.60
0037726-01-00100Bedding Material 74.2   CUYD163.0012,094.60190.0014,098.00100.007,420.00
0038727-01-00100Mobilization 1     LUMP170,000.00170,000.00105,000.00105,000.00200,000.00200,000.00
0039729-01-00100Sign (Type A) 80.6   SQFT44.003,546.4040.003,224.0040.003,224.00
0040729-22-00100Square Tubing Post with 2-1/4" Anchor 10     EACH212.002,120.00275.002,750.00300.003,000.00
0041731-02-00100Reflectorized Raised Pavement Markers 377     EACH5.502,073.504.801,809.605.001,885.00
0042732-01-04080Plastic Pavement Striping (24" Width) (Preformed Retroreflective Thermoplastic) (Heat Applied) (125 mil) 0.098 LNFT66,600.006,526.8055,000.005,390.0065,000.006,370.00
0043732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.894 MILE6,111.0017,685.235,500.0015,917.006,000.0017,364.00
0044732-02-02040Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) 1.11  MILE15,388.0017,080.689,000.009,990.0010,000.0011,100.00
0045732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.089 MILE2,166.002,358.772,300.002,504.703,000.003,267.00
0046732-03-02012Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) 0.123 MILE3,222.00396.31850.00104.551,000.00123.00
0047732-04-01020Plastic Pavement Legends and Symbols (Arrow - Straight) 20     EACH194.003,880.00250.005,000.00300.006,000.00
0048732-04-02000Plastic Pavement Legends and Symbols (Bicycle) 22     EACH278.006,116.00280.006,160.00300.006,600.00
0049732-05-00100Removal of Existing Markings 1.727 MILE7,611.0013,144.203,200.005,526.403,000.005,181.00
0050735-01-00100Mailboxes 23     EACH21.00483.0080.001,840.0030.00690.00
0051735-02-00100Mailbox Supports (Single) 15     EACH406.006,090.00180.002,700.00300.004,500.00
0052735-03-00100Mailbox Supports (Double) 4     EACH489.001,956.00190.00760.00400.001,600.00
0053739-01-00100Hydro-Seeding 2.29  ACRE4,174.009,558.463,000.006,870.002,500.005,725.00
0054740-01-00100Construction Layout 1     LUMP9,000.009,000.0020,000.0020,000.0015,000.0015,000.00
0055741-35-00100Adjust Valve or Meter Box 1     EACH520.00520.001,000.001,000.00150.00150.00
0056802-01-00202Structural Excavation (Type) (RETAINING WALL)317     CUYD20.006,340.0025.007,925.00100.0031,700.00
0057805-01-00600Class A1 Concrete (Retaining Wall) 88.24  CUYD1,500.00132,360.002,000.00176,480.002,500.00220,600.00
0058806-01-00100Deformed Reinforcing Steel 10,349     LB1.0010,349.002.0020,698.002.0020,698.00
0059NS-500-00340Saw Cutting Asphalt Concrete Pavement 36,528     INLF1.2043,833.600.8531,048.800.5520,090.40
0060NS-600-00220Saw Cutting Portland Cement Concrete Pavement 144     INLF2.85410.4010.001,440.005.00720.00
0061NS-719-00001Tree Protection Fencing 1     LUMP2,800.002,800.00800.00800.002,500.002,500.00
0062NS-719-00003Root Pruning 1     LUMP6,400.006,400.005,000.005,000.002,500.002,500.00
0063NS-MSC-00279Adjusting Valve Boxes 2     EACH230.00460.001,000.002,000.00150.00300.00
0064TS-800-00210Safety Rail (Furnished and Installed) (42" HIGH) (GALVANIZED PIPE)1,464     LNFT150.00219,600.00195.00285,480.00200.00292,800.00
           
  CONTRACTOR TOTAL   2,009,441.50 2,129,345.35 2,258,864.50