Bid Tabulations for the Letting of 8/13/2025 LA DOTD Headquarters

Proposal:H.016121.6
Parish:Concordia
Routes:LA 906
Description:LA 906: LA 129 - END OF MAINTENANCE
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ROADWAY REINFORCING MESH, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,915,667.50
Rank License BidderConstruction Bid
112487Diamond B Construction Co., L.L.C.$2,393,966.50
212312Gilchrist Construction Company, LLC$3,239,003.00
305789D & J CONSTRUCTION CO., LLC$3,504,053.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Diamond B Construction Co., L.L.C.
- 2 -
Gilchrist Construction Company, LLC
- 3 -
D & J CONSTRUCTION CO., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 3.092 LUMP45,000.0045,000.00200,000.00200,000.0060,000.0060,000.00
0002202-02-32100Removal of Pipe (Cross Drain) 30" CMP78     LNFT25.001,950.0032.002,496.0035.002,730.00
0003203-07-00100Borrow (Vehicular Measurement) 110     CUYD25.002,750.0050.005,500.0050.005,500.00
0004204-06-00100Temporary Silt Fencing 150     LNFT5.00750.0014.002,100.008.001,200.00
0005401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 592     CUYD135.0079,920.00150.0088,800.00200.00118,400.00
0006402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 100     CUYD180.0018,000.0075.007,500.00175.0017,500.00
0007502-01-00100Asphalt Concrete 3,719.2   TON180.00669,456.00230.00855,416.00225.00836,820.00
0008502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 469     TON355.00166,495.00230.00107,870.00225.00105,525.00
0009509-01-00100Milling Asphalt Pavement 718     SQYD70.0050,260.0060.0043,080.0030.0021,540.00
0010509-02-00100Contractor Retained Reclaimed Asphalt Pavement -20     CUYD1.00-20.002.00-40.001.00-20.00
0011510-01-00001Pavement Patching 20" MINIMUM THICKNESS2,740     SQYD230.00630,200.00260.00712,400.00360.00986,400.00
0012701-01-01021Cross Drain Pipe (30" RCP) 80     LNFT415.0033,200.00400.0032,000.00850.0068,000.00
0013701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 80     LNFT20.001,600.0025.002,000.0020.001,600.00
0014711-01-04000Riprap (55 lb, 18" Thick) 25     SQYD215.005,375.00200.005,000.00200.005,000.00
0015711-04-00100Geotextile Fabric 25     SQYD10.00250.003.0075.0010.00250.00
0016713-01-00100Temporary Signs and Barricades 1     LUMP73,000.0073,000.00160,000.00160,000.00175,000.00175,000.00
0017713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 2.4   MILE140.00336.00500.001,200.00300.00720.00
0018713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 19.2   MILE900.0017,280.001,200.0023,040.00900.0017,280.00
0019713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 635     EACH8.005,080.005.003,175.005.003,175.00
0020716-01-00100Mulch (Vegetative) 12.9   TON975.0012,577.50750.009,675.00900.0011,610.00
0021717-01-00100Seeding 388     LB15.005,820.0012.004,656.0015.005,820.00
0022718-01-00100Fertilizer 6,460     LB0.754,845.001.006,460.000.905,814.00
0023726-01-00100Bedding Material 32.6   CUYD215.007,009.00200.006,520.00200.006,520.00
0024727-01-00100Mobilization 1     LUMP235,000.00235,000.00320,000.00320,000.00325,000.00325,000.00
0025729-16-00200Object Marker Assembly (Type 2) 3     EACH65.00195.00300.00900.00165.00495.00
0026731-02-00100Reflectorized Raised Pavement Markers 635     EACH5.003,175.007.004,445.008.005,080.00
0027731-03-00100Removal of Raised Pavement Markers 2.4   MILE2,000.004,800.00125.00300.008,000.0019,200.00
0028732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 9.6   MILE4,200.0040,320.006,000.0057,600.007,000.0067,200.00
0029735-01-00100Mailboxes 59     EACH1.0059.0010.00590.0040.002,360.00
0030735-02-00100Mailbox Supports (Single) 39     EACH290.0011,310.00300.0011,700.00320.0012,480.00
0031735-03-00100Mailbox Supports (Double) 10     EACH335.003,350.00350.003,500.00420.004,200.00
0032740-01-00100Construction Layout 1     LUMP15,000.0015,000.0093,000.0093,000.0050,000.0050,000.00
0033NS-500-00180Roadway Reinforcing Mesh (Complete Road System) 31,203     SQYD8.00249,624.0015.00468,045.0018.00561,654.00
           
  CONTRACTOR TOTAL   2,393,966.50 3,239,003.00 3,504,053.00