Proposal:H.015958.6
Parish:Vernon
Routes:LA 117
Description:LA 117: TANK TRAIL RD INTERSECTION IMP
Type Construction:GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$695,387.00
Rank | License | Bidder | Construction Bid |
1 | 36285 | R.C. Paving, Inc. | $523,891.41 |
2 | 30774 | Progressive Construction Co., LLC | $678,745.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R.C. Paving, Inc. | - 2 - Progressive Construction Co., LLC | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,300.00 | 4,300.00 | 2,200.00 | 2,200.00 | 0002 | 202-02-03030 | Removal of Pavement Structure | 475.4 | SQYD | 35.00 | 16,639.00 | 35.00 | 16,639.00 | 0003 | 202-02-32120 | Removal of Pipe (Side Drain) 18" CMP & RCP | 80 | LNFT | 25.00 | 2,000.00 | 15.00 | 1,200.00 | 0004 | 202-02-38240 | Removal of Signs and Supports | 3 | EACH | 75.00 | 225.00 | 600.00 | 1,800.00 | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 63,800.00 | 63,800.00 | 60,000.00 | 60,000.00 | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 13 | EACH | 135.00 | 1,755.00 | 50.00 | 650.00 | 0007 | 204-06-00100 | Temporary Silt Fencing | 2,678 | LNFT | 1.95 | 5,222.10 | 2.00 | 5,356.00 | 0008 | 302-02-12010 | Class II Base Course (12" Thick) (Soil Cement) | 3,609.2 | SQYD | 19.18 | 69,224.46 | 29.75 | 107,373.70 | 0009 | 304-01-00100 | Lime | 12.78 | TON | 600.00 | 7,668.00 | 790.00 | 10,096.20 | 0010 | 304-05-00100 | Lime Treatment (Type E) | 904 | SQYD | 26.34 | 23,811.36 | 20.00 | 18,080.00 | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3 | CUYD | 69.24 | 207.72 | 465.00 | 1,395.00 | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 40 | CUYD | 81.03 | 3,241.20 | 105.00 | 4,200.00 | 0013 | 502-01-00100 | Asphalt Concrete | 503.9 | TON | 184.60 | 93,019.94 | 260.00 | 131,014.00 | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 272.7 | TON | 184.60 | 50,340.42 | 285.00 | 77,719.50 | 0015 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 76 | LNFT | 245.00 | 18,620.00 | 125.00 | 9,500.00 | 0016 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 2,600.00 | 5,200.00 | 4,500.00 | 9,000.00 | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 18,000.00 | 18,000.00 | 15,000.00 | 15,000.00 | 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.213 | MILE | 396.39 | 84.43 | 1,200.00 | 255.60 | 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.793 | MILE | 1,000.00 | 793.00 | 1,200.00 | 951.60 | 0020 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 40 | EACH | 6.00 | 240.00 | 7.00 | 280.00 | 0021 | 716-01-00100 | Mulch (Vegetative) | 2.2 | TON | 1,350.00 | 2,970.00 | 1,400.00 | 3,080.00 | 0022 | 717-01-00100 | Seeding | 65 | LB | 40.00 | 2,600.00 | 17.00 | 1,105.00 | 0023 | 718-01-00100 | Fertilizer | 1,090 | LB | 0.98 | 1,068.20 | 0.85 | 926.50 | 0024 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 435 | SQYD | 1.90 | 826.50 | 2.20 | 957.00 | 0025 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 435 | SQYD | 1.90 | 826.50 | 2.20 | 957.00 | 0026 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 796 | SQYD | 2.40 | 1,910.40 | 2.20 | 1,751.20 | 0027 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | 9,500.00 | 9,500.00 | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 54,000.00 | 54,000.00 | 62,000.00 | 62,000.00 | 0029 | 729-01-00100 | Sign (Type A) | 12.6 | SQFT | 39.11 | 492.79 | 120.00 | 1,512.00 | 0030 | 729-04-00103 | Sign (Type D)(Relocate) | 48 | SQFT | 58.48 | 2,807.04 | 50.00 | 2,400.00 | 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | 91.73 | 366.92 | 80.00 | 320.00 | 0032 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 7 | EACH | 208.89 | 1,462.23 | 425.00 | 2,975.00 | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 40 | EACH | 6.00 | 240.00 | 7.00 | 280.00 | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.793 | MILE | 5,500.00 | 4,361.50 | 6,500.00 | 5,154.50 | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.213 | MILE | 4,500.00 | 958.50 | 5,200.00 | 1,107.60 | 0036 | 732-05-00100 | Removal of Existing Markings | 0.252 | MILE | 13,500.00 | 3,402.00 | 16,000.00 | 4,032.00 | 0037 | 735-01-00100 | Mailboxes | 4 | EACH | 21.84 | 87.36 | 1.20 | 4.80 | 0038 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 255.16 | 1,020.64 | 700.00 | 2,800.00 | 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 7,500.00 | 7,500.00 | 0040 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 39,840 | INLF | 0.63 | 25,099.20 | 0.80 | 31,872.00 | 0041 | NS-736-00400 | Solar Powered Flashing Beacon Assembly W2-1 Sign | 2 | EACH | 2,000.00 | 4,000.00 | 32,900.00 | 65,800.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 523,891.41 | | 678,745.20 |
|