Proposal:H.015866.6
Parish:Lafayette
Routes:LA 720
Description:LA 720: LA 719 - LA 343
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,736,016.98
Rank | License | Bidder | Construction Bid |
1 | 51821 | Elliott Construction, LLC | $2,503,942.51 |
2 | 34356 | Prairie Contractors LLC | $2,558,152.22 |
3 | 33663 | Glenn Lege Construction LLC | $2,767,951.80 |
4 | 46747 | Triumph Construction, LLC | $4,711,918.12 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Prairie Contractors LLC | - 3 - Glenn Lege Construction LLC | - 4 - Triumph Construction, LLC | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 202-02-02000 | Removal of Asphalt Drives | 99 | SQYD | 25.00 | 2,475.00 | 80.00 | 7,920.00 | 55.07 | 5,451.93 | 63.00 | 6,237.00 | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 79 | SQYD | 55.00 | 4,345.00 | 40.00 | 3,160.00 | 59.84 | 4,727.36 | 42.00 | 3,318.00 | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" RCP) (29"x18" CMPA) | 69 | LNFT | 50.00 | 3,450.00 | 35.00 | 2,415.00 | 95.03 | 6,557.07 | 21.00 | 1,449.00 | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 198 | CUYD | 65.00 | 12,870.00 | 20.00 | 3,960.00 | 139.25 | 27,571.50 | 78.00 | 15,444.00 | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 30 | EACH | 155.00 | 4,650.00 | 200.00 | 6,000.00 | 174.23 | 5,226.90 | 131.00 | 3,930.00 | 0006 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 30,999 | SQYD | 12.00 | 371,988.00 | 14.00 | 433,986.00 | 8.93 | 276,821.07 | 16.00 | 495,984.00 | 0007 | 303-02-00100 | Removal of Existing Patches | 100 | SQYD | 20.00 | 2,000.00 | 100.00 | 10,000.00 | 137.87 | 13,787.00 | 63.00 | 6,300.00 | 0008 | 304-01-00100 | Lime | 109.21 | TON | 360.00 | 39,315.60 | 500.00 | 54,605.00 | 295.84 | 32,308.69 | 981.00 | 107,135.01 | 0009 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 7,750 | SQYD | 7.00 | 54,250.00 | 11.00 | 85,250.00 | 10.50 | 81,375.00 | 12.00 | 93,000.00 | 0010 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 30,999 | SQYD | 15.00 | 464,985.00 | 12.50 | 387,487.50 | 12.37 | 383,457.63 | 21.00 | 650,979.00 | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,052 | CUYD | 75.00 | 78,900.00 | 43.00 | 45,236.00 | 94.27 | 99,172.04 | 59.00 | 62,068.00 | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 100.00 | 10,000.00 | 50.00 | 5,000.00 | 98.48 | 9,848.00 | 75.00 | 7,500.00 | 0013 | 502-01-00100 | Asphalt Concrete | 6,373.5 | TON | 135.00 | 860,422.50 | 120.00 | 764,820.00 | 136.80 | 871,894.80 | 254.00 | 1,618,869.00 | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 599.7 | TON | 195.00 | 116,941.50 | 230.00 | 137,931.00 | 187.99 | 112,737.60 | 254.00 | 152,323.80 | 0015 | 509-01-00100 | Milling Asphalt Pavement | 12,275 | SQYD | 3.50 | 42,962.50 | 15.32 | 188,053.00 | 4.45 | 54,623.75 | 10.00 | 122,750.00 | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -767 | CUYD | 0.01 | -7.67 | 0.01 | -7.67 | 0.01 | -7.67 | 0.07 | -53.69 | 0017 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 27 | SQYD | 250.00 | 6,750.00 | 350.00 | 9,450.00 | 409.13 | 11,046.51 | 218.00 | 5,886.00 | 0018 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 4 | LNFT | 550.00 | 2,200.00 | 450.00 | 1,800.00 | 380.65 | 1,522.60 | 368.00 | 1,472.00 | 0019 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 64 | LNFT | 335.00 | 21,440.00 | 500.00 | 32,000.00 | 206.88 | 13,240.32 | 79.00 | 5,056.00 | 0020 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,550.00 | 2,550.00 | 3,500.00 | 3,500.00 | 1,444.30 | 1,444.30 | 620.00 | 620.00 | 0021 | 706-02-00200 | Concrete Drive (6" Thick) | 79 | SQYD | 165.00 | 13,035.00 | 275.00 | 21,725.00 | 82.23 | 6,496.17 | 72.00 | 5,688.00 | 0022 | 712-02-00100 | Sacked Concrete Revetment | 2 | SQYD | 1,500.00 | 3,000.00 | 800.00 | 1,600.00 | 3,807.70 | 7,615.40 | 280.00 | 560.00 | 0023 | 712-04-00100 | Flexible Revetment | 3 | SQYD | 650.00 | 1,950.00 | 250.00 | 750.00 | 1,181.70 | 3,545.10 | 3,080.00 | 9,240.00 | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 20,000.00 | 20,000.00 | 223,032.75 | 223,032.75 | 15,010.00 | 15,010.00 | 0025 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 66 | LNFT | 1.75 | 115.50 | 0.01 | 0.66 | 1.75 | 115.50 | 19.00 | 1,254.00 | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.018 | MILE | 800.00 | 4,814.40 | 1.00 | 6.02 | 787.80 | 4,740.98 | 770.00 | 4,633.86 | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.018 | MILE | 660.00 | 3,971.88 | 1.00 | 6.02 | 696.90 | 4,193.94 | 885.00 | 5,325.93 | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 13.44 | MILE | 880.00 | 11,827.20 | 1.00 | 13.44 | 929.20 | 12,488.45 | 1,009.00 | 13,560.96 | 0029 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | 10,110.10 | 10,110.10 | 39,200.00 | 39,200.00 | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 4.035 | MILE | 1,100.00 | 4,438.50 | 1,250.00 | 5,043.75 | 1,161.50 | 4,686.65 | 868.00 | 3,502.38 | 0031 | 726-01-00100 | Bedding Material | 5.9 | CUYD | 200.00 | 1,180.00 | 185.00 | 1,091.50 | 151.00 | 890.90 | 407.00 | 2,401.30 | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 185,000.00 | 185,000.00 | 252,096.00 | 252,096.00 | 455,950.00 | 455,950.00 | 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 85.00 | 1,020.00 | 95.00 | 1,140.00 | 144.43 | 1,733.16 | 87.00 | 1,044.00 | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 269 | EACH | 5.50 | 1,479.50 | 8.00 | 2,152.00 | 5.81 | 1,562.89 | 12.00 | 3,228.00 | 0035 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 22 | LNFT | 22.00 | 484.00 | 16.00 | 352.00 | 23.23 | 511.06 | 65.00 | 1,430.00 | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.48 | MILE | 4,400.00 | 19,712.00 | 6,500.00 | 29,120.00 | 4,646.00 | 20,814.08 | 6,603.00 | 29,581.44 | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.006 | MILE | 1,100.00 | 2,206.60 | 3,500.00 | 7,021.00 | 1,161.50 | 2,329.97 | 3,116.00 | 6,250.70 | 0038 | 735-01-00100 | Mailboxes | 63 | EACH | 25.00 | 1,575.00 | 10.00 | 630.00 | 30.20 | 1,902.60 | 24.00 | 1,512.00 | 0039 | 735-02-00100 | Mailbox Supports (Single) | 63 | EACH | 275.00 | 17,325.00 | 350.00 | 22,050.00 | 296.18 | 18,659.34 | 289.00 | 18,207.00 | 0040 | 739-01-00100 | Hydro-Seeding | 0.73 | ACRE | 3,850.00 | 2,810.50 | 8,500.00 | 6,205.00 | 4,065.25 | 2,967.63 | 2,891.00 | 2,110.43 | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 1,000.00 | 1,000.00 | 141,264.62 | 141,264.62 | 27,180.00 | 27,180.00 | 0042 | NS-MSC-18080 | Root Barrier | 1,017 | LNFT | 30.00 | 30,510.00 | 40.00 | 40,680.00 | 32.83 | 33,388.11 | 693.00 | 704,781.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,503,942.51 | | 2,558,152.22 | | 2,767,951.80 | | 4,711,918.12 |
|