Proposal:H.015782.6
Parish:Orleans
Routes:US 90
Description:US 90: NAPOLEON - US 90B
Type Construction:CLEARING AND GRUBBING, PAVEMENT PATCHING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, CONCRETE WALK AND CURB RAMPS, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,703,822.90
Rank | License | Bidder | Construction Bid |
1 | 06276 | Barriere Construction Co., LLC | $3,199,222.00 |
2 | 73475 | Madden Gulf Coast, LLC | $3,488,979.30 |
3 | 02179 | Boh Bros. Construction Co., LLC. | $5,061,826.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Madden Gulf Coast, LLC | - 3 - Boh Bros. Construction Co., LLC. | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1.1 | LUMP | 75,000.00 | 75,000.00 | 70,000.00 | 70,000.00 | 75,000.00 | 75,000.00 | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 84 | LNFT | 30.00 | 2,520.00 | 25.00 | 2,100.00 | 15.00 | 1,260.00 | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 179 | SQYD | 34.00 | 6,086.00 | 35.00 | 6,265.00 | 40.00 | 7,160.00 | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 686 | LNFT | 30.00 | 20,580.00 | 10.00 | 6,860.00 | 15.00 | 10,290.00 | 0005 | 202-02-14500 | Removal of Guard Rail | 125 | LNFT | 28.00 | 3,500.00 | 10.00 | 1,250.00 | 80.00 | 10,000.00 | 0006 | 502-01-00100 | Asphalt Concrete | 6,485.5 | TON | 138.00 | 894,999.00 | 150.00 | 972,825.00 | 235.00 | 1,524,092.50 | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,066 | TON | 210.00 | 223,860.00 | 305.00 | 325,130.00 | 375.00 | 399,750.00 | 0008 | 509-01-00100 | Milling Asphalt Pavement | 68,069 | SQYD | 4.00 | 272,276.00 | 6.25 | 425,431.25 | 7.00 | 476,483.00 | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,835 | CUYD | 0.01 | -28.35 | 0.01 | -28.35 | 0.15 | -425.25 | 0010 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 1,263 | SQYD | 153.00 | 193,239.00 | 170.00 | 214,710.00 | 275.00 | 347,325.00 | 0011 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 3,800 | LNFT | 3.50 | 13,300.00 | 3.35 | 12,730.00 | 5.00 | 19,000.00 | 0012 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 1,900 | LNFT | 3.50 | 6,650.00 | 3.65 | 6,935.00 | 5.00 | 9,500.00 | 0013 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 56 | SQYD | 350.00 | 19,600.00 | 350.00 | 19,600.00 | 975.00 | 54,600.00 | 0014 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 73 | SQYD | 350.00 | 25,550.00 | 350.00 | 25,550.00 | 440.00 | 32,120.00 | 0015 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 94 | SQYD | 350.00 | 32,900.00 | 350.00 | 32,900.00 | 290.00 | 27,260.00 | 0016 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 4 | EACH | 4,200.00 | 16,800.00 | 4,600.00 | 18,400.00 | 2,100.00 | 8,400.00 | 0017 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 11 | EACH | 6,950.00 | 76,450.00 | 6,500.00 | 71,500.00 | 3,150.00 | 34,650.00 | 0018 | 702-03-00500 | Catch Basins (CB-06) | 1 | EACH | 8,750.00 | 8,750.00 | 7,500.00 | 7,500.00 | 13,850.00 | 13,850.00 | 0019 | 702-04-00100 | Adjusting Manholes | 22 | EACH | 2,000.00 | 44,000.00 | 2,500.00 | 55,000.00 | 2,585.00 | 56,870.00 | 0020 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 8 | EACH | 575.00 | 4,600.00 | 500.00 | 4,000.00 | 300.00 | 2,400.00 | 0021 | 702-04-00200 | Adjusting Catch Basins | 7 | EACH | 5,250.00 | 36,750.00 | 2,500.00 | 17,500.00 | 4,400.00 | 30,800.00 | 0022 | 706-01-00100 | Concrete Walk (4" Thick) | 167.9 | SQYD | 100.00 | 16,790.00 | 115.00 | 19,308.50 | 135.00 | 22,666.50 | 0023 | 706-04-00110 | Curb Ramps TYPE 1 | 358.4 | SQYD | 290.00 | 103,936.00 | 275.00 | 98,560.00 | 345.00 | 123,648.00 | 0024 | 706-04-00110 | Curb Ramps TYPE 3 | 145.8 | SQYD | 290.00 | 42,282.00 | 275.00 | 40,095.00 | 430.00 | 62,694.00 | 0025 | 706-04-00110 | Curb Ramps TYPE 7 | 266 | SQYD | 290.00 | 77,140.00 | 275.00 | 73,150.00 | 335.00 | 89,110.00 | 0026 | 706-04-00110 | Curb Ramps TYPE 8 | 108.5 | SQYD | 290.00 | 31,465.00 | 275.00 | 29,837.50 | 325.00 | 35,262.50 | 0027 | 707-01-00100 | Concrete Curb | 692 | LNFT | 56.00 | 38,752.00 | 33.00 | 22,836.00 | 60.00 | 41,520.00 | 0028 | 707-03-00100 | Combination Concrete Curb and Gutter | 84 | LNFT | 65.00 | 5,460.00 | 80.00 | 6,720.00 | 75.00 | 6,300.00 | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 319,000.00 | 319,000.00 | 420,000.00 | 420,000.00 | 750,000.00 | 750,000.00 | 0030 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 566 | LNFT | 0.50 | 283.00 | 0.50 | 283.00 | 1.00 | 566.00 | 0031 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 844 | LNFT | 1.00 | 844.00 | 1.00 | 844.00 | 2.00 | 1,688.00 | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.096 | MILE | 240.00 | 2,183.04 | 400.00 | 3,638.40 | 500.00 | 4,548.00 | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.096 | MILE | 750.00 | 6,822.00 | 750.00 | 6,822.00 | 1,000.00 | 9,096.00 | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.096 | MILE | 1,000.00 | 9,096.00 | 1,000.00 | 9,096.00 | 1,250.00 | 11,370.00 | 0035 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 6 | EACH | 50.00 | 300.00 | 50.00 | 300.00 | 100.00 | 600.00 | 0036 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 3 | EACH | 50.00 | 150.00 | 50.00 | 150.00 | 100.00 | 300.00 | 0037 | 727-01-00100 | Mobilization | 1 | LUMP | 319,000.00 | 319,000.00 | 330,000.00 | 330,000.00 | 475,000.00 | 475,000.00 | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 694 | EACH | 7.00 | 4,858.00 | 6.50 | 4,511.00 | 8.00 | 5,552.00 | 0039 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 566 | LNFT | 3.25 | 1,839.50 | 3.00 | 1,698.00 | 4.00 | 2,264.00 | 0040 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 28 | LNFT | 22.00 | 616.00 | 20.00 | 560.00 | 25.00 | 700.00 | 0041 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 3,192 | LNFT | 3.75 | 11,970.00 | 3.50 | 11,172.00 | 5.00 | 15,960.00 | 0042 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 2,011 | LNFT | 16.00 | 32,176.00 | 15.00 | 30,165.00 | 20.00 | 40,220.00 | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.908 | MILE | 5,250.00 | 25,767.00 | 5,000.00 | 24,540.00 | 6,000.00 | 29,448.00 | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.548 | MILE | 1,600.00 | 7,276.80 | 1,500.00 | 6,822.00 | 2,000.00 | 9,096.00 | 0045 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.017 | MILE | 5,250.00 | 89.25 | 5,000.00 | 85.00 | 5,000.00 | 85.00 | 0046 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 210.00 | 1,260.00 | 200.00 | 1,200.00 | 300.00 | 1,800.00 | 0047 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 275.00 | 825.00 | 250.00 | 750.00 | 400.00 | 1,200.00 | 0048 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL) | 2 | EACH | 525.00 | 1,050.00 | 500.00 | 1,000.00 | 700.00 | 1,400.00 | 0049 | 732-05-00100 | Removal of Existing Markings | 0.36 | MILE | 5,400.00 | 1,944.00 | 5,000.00 | 1,800.00 | 7,500.00 | 2,700.00 | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 142,467.76 | 142,467.76 | 25,000.00 | 25,000.00 | 150,000.00 | 150,000.00 | 0051 | 741-35-00100 | Adjust Valve or Meter Box | 4 | EACH | 975.00 | 3,900.00 | 2,000.00 | 8,000.00 | 875.00 | 3,500.00 | 0052 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 1,380 | LNFT | 2.50 | 3,450.00 | 2.05 | 2,829.00 | 5.00 | 6,900.00 | 0053 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 1,840 | LNFT | 2.50 | 4,600.00 | 2.35 | 4,324.00 | 5.00 | 9,200.00 | 0054 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 3,220 | LNFT | 1.10 | 3,542.00 | 1.65 | 5,313.00 | 1.75 | 5,635.00 | 0055 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 706 | INLF | 1.00 | 706.00 | 2.00 | 1,412.00 | 2.00 | 1,412.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,199,222.00 | | 3,488,979.30 | | 5,061,826.25 |
|