Proposal:H.014837.6
Parish:Iberville
Routes:LA 30
Description:LA 30: LA 74 - EBR P/L
Type Construction:BORROW, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$4,354,767.52
Rank | License | Bidder | Construction Bid |
1 | 12031 | R.J. Daigle & Sons Contractors, Inc | $3,263,738.11 |
2 | 00046 | Barber Bros. Contracting Co., L.L.C | $3,547,126.70 |
3 | 73475 | Madden Gulf Coast, LLC | $3,551,754.33 |
4 | 06276 | Barriere Construction Co., LLC | $3,893,868.72 |
5 | 46747 | Triumph Construction, LLC | $6,740,328.54 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R.J. Daigle & Sons Contractors, Inc | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - Madden Gulf Coast, LLC | - 4 - Barriere Construction Co., LLC | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 202-02-00010 | Removal of Add-on Concrete Bridge End Block (Approx. 6'X3'X3') | 4 | EACH | 2,210.00 | 8,840.00 | 1,000.00 | 4,000.00 | 2,000.00 | 8,000.00 | 2,000.00 | 8,000.00 | 0002 | 202-02-14500 | Removal of Guard Rail | 668.8 | LNFT | 9.00 | 6,019.20 | 9.00 | 6,019.20 | 8.00 | 5,350.40 | 8.00 | 5,350.40 | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 206 | CUYD | 186.79 | 38,478.74 | 80.00 | 16,480.00 | 118.00 | 24,308.00 | 120.00 | 24,720.00 | 0004 | 502-01-00100 | Asphalt Concrete | 18,906.8 | TON | 100.00 | 1,890,680.00 | 104.00 | 1,966,307.20 | 101.50 | 1,919,040.20 | 120.00 | 2,268,816.00 | 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 438 | TON | 125.00 | 54,750.00 | 198.00 | 86,724.00 | 235.00 | 102,930.00 | 253.00 | 110,814.00 | 0006 | 509-01-00100 | Milling Asphalt Pavement | 102,644 | SQYD | 3.13 | 321,275.72 | 4.00 | 410,576.00 | 3.75 | 384,915.00 | 3.75 | 384,915.00 | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,746 | CUYD | 0.01 | -57.46 | 0.00 | 0.00 | 0.01 | -57.46 | 0.01 | -57.46 | 0008 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 3,100 | SQYD | 133.98 | 415,338.00 | 176.00 | 545,600.00 | 160.00 | 496,000.00 | 145.00 | 449,500.00 | 0009 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 200 | LNFT | 2.00 | 400.00 | 52.00 | 10,400.00 | 48.75 | 9,750.00 | 48.75 | 9,750.00 | 0010 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 437.5 | LNFT | 32.00 | 14,000.00 | 32.00 | 14,000.00 | 30.25 | 13,234.38 | 30.25 | 13,234.38 | 0011 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 132.00 | 13,200.00 | 127.00 | 12,700.00 | 120.00 | 12,000.00 | 120.00 | 12,000.00 | 0012 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,000.00 | 16,000.00 | 3,900.00 | 15,600.00 | 3,650.00 | 14,600.00 | 3,650.00 | 14,600.00 | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 143,000.00 | 143,000.00 | 120,000.00 | 120,000.00 | 150,000.00 | 150,000.00 | 240,000.00 | 240,000.00 | 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.354 | MILE | 220.00 | 2,717.88 | 300.00 | 3,706.20 | 400.00 | 4,941.60 | 233.00 | 2,878.48 | 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.054 | MILE | 620.00 | 5,613.48 | 600.00 | 5,432.40 | 600.00 | 5,432.40 | 200.00 | 1,810.80 | 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 34.926 | MILE | 900.00 | 31,433.40 | 800.00 | 27,940.80 | 800.00 | 27,940.80 | 400.00 | 13,970.40 | 0017 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 24 | EACH | 26.00 | 624.00 | 25.00 | 600.00 | 25.00 | 600.00 | 25.00 | 600.00 | 0018 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 12 | EACH | 27.00 | 324.00 | 25.00 | 300.00 | 25.00 | 300.00 | 25.00 | 300.00 | 0019 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 18 | EACH | 27.00 | 486.00 | 25.00 | 450.00 | 25.00 | 450.00 | 25.00 | 450.00 | 0020 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 55.00 | 330.00 | 50.00 | 300.00 | 50.00 | 300.00 | 50.00 | 300.00 | 0021 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 3.832 | MILE | 345.72 | 1,324.80 | 350.00 | 1,341.20 | 1,100.00 | 4,215.20 | 2,022.50 | 7,750.22 | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 120,000.00 | 120,000.00 | 130,000.00 | 130,000.00 | 205,000.00 | 205,000.00 | 164,000.00 | 164,000.00 | 0023 | 729-16-00200 | Object Marker Assembly (Type 2) | 76 | EACH | 80.00 | 6,080.00 | 80.00 | 6,080.00 | 75.00 | 5,700.00 | 75.00 | 5,700.00 | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 96.00 | 384.00 | 95.00 | 380.00 | 90.00 | 360.00 | 90.00 | 360.00 | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,215 | EACH | 4.50 | 9,967.50 | 4.50 | 9,967.50 | 4.00 | 8,860.00 | 4.00 | 8,860.00 | 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,730 | LNFT | 3.40 | 5,882.00 | 3.25 | 5,622.50 | 3.00 | 5,190.00 | 3.00 | 5,190.00 | 0027 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,735 | LNFT | 12.50 | 21,687.50 | 12.00 | 20,820.00 | 11.00 | 19,085.00 | 11.00 | 19,085.00 | 0028 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 405 | LNFT | 12.50 | 5,062.50 | 12.00 | 4,860.00 | 11.00 | 4,455.00 | 11.00 | 4,455.00 | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.91 | MILE | 4,500.00 | 53,595.00 | 4,100.00 | 48,831.00 | 4,000.00 | 47,640.00 | 4,000.00 | 47,640.00 | 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.018 | MILE | 1,600.00 | 4,828.80 | 1,600.00 | 4,828.80 | 1,500.00 | 4,527.00 | 1,500.00 | 4,527.00 | 0031 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.113 | MILE | 9,400.00 | 1,062.20 | 8,800.00 | 994.40 | 8,500.00 | 960.50 | 8,500.00 | 960.50 | 0032 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.322 | MILE | 9,400.00 | 3,026.80 | 9,000.00 | 2,898.00 | 8,500.00 | 2,737.00 | 8,500.00 | 2,737.00 | 0033 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 335.00 | 2,010.00 | 320.00 | 1,920.00 | 300.00 | 1,800.00 | 300.00 | 1,800.00 | 0034 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 335.00 | 1,340.00 | 320.00 | 1,280.00 | 300.00 | 1,200.00 | 300.00 | 1,200.00 | 0035 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 500.00 | 3,000.00 | 480.00 | 2,880.00 | 450.00 | 2,700.00 | 450.00 | 2,700.00 | 0036 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,050.00 | 2,100.00 | 1,000.00 | 2,000.00 | 950.00 | 1,900.00 | 950.00 | 1,900.00 | 0037 | 732-05-00100 | Removal of Existing Markings | 0.314 | MILE | 9,000.00 | 2,826.00 | 9,250.00 | 2,904.50 | 8,000.00 | 2,512.00 | 8,000.00 | 2,512.00 | 0038 | 735-01-00100 | Mailboxes | 11 | EACH | 275.00 | 3,025.00 | 22.00 | 242.00 | 20.00 | 220.00 | 20.00 | 220.00 | 0039 | 735-02-00100 | Mailbox Supports (Single) | 11 | EACH | 22.00 | 242.00 | 275.00 | 3,025.00 | 250.00 | 2,750.00 | 250.00 | 2,750.00 | 0040 | 736-01-00100 | Trenching and Backfilling | 20 | LNFT | 15.00 | 300.00 | 15.00 | 300.00 | 13.70 | 274.00 | 13.70 | 274.00 | 0041 | 736-09-00100 | Loop Detector | 1,152 | LNFT | 37.00 | 42,624.00 | 33.00 | 38,016.00 | 32.87 | 37,866.24 | 33.00 | 38,016.00 | 0042 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 1,700.00 | 1,700.00 | 1,500.00 | 1,500.00 | 1,487.67 | 1,487.67 | 1,500.00 | 1,500.00 | 0043 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 20 | LNFT | 16.00 | 320.00 | 15.00 | 300.00 | 13.97 | 279.40 | 14.00 | 280.00 | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,897.05 | 7,897.05 | 9,000.00 | 9,000.00 | 10,000.00 | 10,000.00 | 7,500.00 | 7,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,263,738.11 | | 3,547,126.70 | | 3,551,754.33 | | 3,893,868.72 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Triumph Construction, LLC | Unit Price | Total Amount | 0001 | 202-02-00010 | Removal of Add-on Concrete Bridge End Block (Approx. 6'X3'X3') | 4 | EACH | 2,885.00 | 11,540.00 | 0002 | 202-02-14500 | Removal of Guard Rail | 668.8 | LNFT | 41.00 | 27,420.80 | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 206 | CUYD | 64.00 | 13,184.00 | 0004 | 502-01-00100 | Asphalt Concrete | 18,906.8 | TON | 249.00 | 4,707,793.20 | 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 438 | TON | 214.00 | 93,732.00 | 0006 | 509-01-00100 | Milling Asphalt Pavement | 102,644 | SQYD | 5.00 | 513,220.00 | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,746 | CUYD | 1.00 | -5,746.00 | 0008 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 3,100 | SQYD | 136.00 | 421,600.00 | 0009 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 200 | LNFT | 41.00 | 8,200.00 | 0010 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 437.5 | LNFT | 41.00 | 17,937.50 | 0011 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 41.00 | 4,100.00 | 0012 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,115.00 | 12,460.00 | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 14,950.00 | 14,950.00 | 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.354 | MILE | 924.00 | 11,415.10 | 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 9.054 | MILE | 1,731.00 | 15,672.47 | 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 34.926 | MILE | 950.00 | 33,179.70 | 0017 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 24 | EACH | 520.00 | 12,480.00 | 0018 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 12 | EACH | 520.00 | 6,240.00 | 0019 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 18 | EACH | 520.00 | 9,360.00 | 0020 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 520.00 | 3,120.00 | 0021 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 3.832 | MILE | 580.00 | 2,222.56 | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 576,860.00 | 576,860.00 | 0023 | 729-16-00200 | Object Marker Assembly (Type 2) | 76 | EACH | 289.00 | 21,964.00 | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 290.00 | 1,160.00 | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,215 | EACH | 4.00 | 8,860.00 | 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,730 | LNFT | 6.00 | 10,380.00 | 0027 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,735 | LNFT | 6.00 | 10,410.00 | 0028 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 405 | LNFT | 29.00 | 11,745.00 | 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.91 | MILE | 4,615.00 | 54,964.65 | 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.018 | MILE | 4,616.00 | 13,931.09 | 0031 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.113 | MILE | 6,992.00 | 790.10 | 0032 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.322 | MILE | 9,255.00 | 2,980.11 | 0033 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 6 | EACH | 520.00 | 3,120.00 | 0034 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 520.00 | 2,080.00 | 0035 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 6 | EACH | 5,820.00 | 34,920.00 | 0036 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 465.00 | 930.00 | 0037 | 732-05-00100 | Removal of Existing Markings | 0.314 | MILE | 5,797.00 | 1,820.26 | 0038 | 735-01-00100 | Mailboxes | 11 | EACH | 19.00 | 209.00 | 0039 | 735-02-00100 | Mailbox Supports (Single) | 11 | EACH | 145.00 | 1,595.00 | 0040 | 736-01-00100 | Trenching and Backfilling | 20 | LNFT | 133.00 | 2,660.00 | 0041 | 736-09-00100 | Loop Detector | 1,152 | LNFT | 4.00 | 4,608.00 | 0042 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 1,390.00 | 1,390.00 | 0043 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 20 | LNFT | 18.00 | 360.00 | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 38,510.00 | 38,510.00 | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,740,328.54 |
|