Proposal:H.012370.6
Parish:Orleans
Description:MORRISON RD: MAYO AVE - BULLARD AVE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGES, GRADING, MILLING ASPHALT PAVEMENT, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, DRILLED SHAFT FOUNDATIONS, CONCRETE SLAB SPAN BRIDGE, BRIDGE REPAIRS, EPOXY-URETHANE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$23,476,911.35
Rank | License | Bidder | Construction Bid |
1 | 44187 | RNGD Infrastructure LLC | $17,758,895.40 |
2 | 06276 | Barriere Construction Co., LLC | $17,794,201.25 |
3 | 24901 | Hard Rock Construction LLC | $20,458,590.65 |
4 | 48896 | Command Construction Industries LLC | $20,782,450.69 |
5 | 02179 | Boh Bros. Construction Co., LLC. | $24,249,254.90 |
6 | 39462 | JB JAMES CONSTRUCTION LLC | $33,332,728.15 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - RNGD Infrastructure LLC | - 2 - Barriere Construction Co., LLC | - 3 - Hard Rock Construction LLC | - 4 - Command Construction Industries LLC | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 90,000.00 | 90,000.00 | 25,000.00 | 25,000.00 | 0002 | 202-02-00030 | Removal of Joint Material | 688 | LNFT | 20.00 | 13,760.00 | 21.00 | 14,448.00 | 15.00 | 10,320.00 | 10.00 | 6,880.00 | 0003 | 202-02-00030 | Removal of Metal Bridge Railing | 245 | LNFT | 50.00 | 12,250.00 | 54.00 | 13,230.00 | 83.00 | 20,335.00 | 75.00 | 18,375.00 | 0004 | 202-02-00050 | Removal of Debris | 1 | LUMP | 25,000.00 | 25,000.00 | 16,100.00 | 16,100.00 | 16,000.00 | 16,000.00 | 25,000.00 | 25,000.00 | 0005 | 202-02-04501 | Removal of Bridge Benson Canal Bridge 76' Long, 39.5' Wide | 1 | LUMP | 100,000.00 | 100,000.00 | 107,000.00 | 107,000.00 | 102,314.00 | 102,314.00 | 150,000.00 | 150,000.00 | 0006 | 202-02-04501 | Removal of Bridge Farrar Canal Bridge 76' Long 39.5 Wide | 1 | LUMP | 100,000.00 | 100,000.00 | 107,000.00 | 107,000.00 | 102,300.00 | 102,300.00 | 150,000.00 | 150,000.00 | 0007 | 202-02-06000 | Removal of Concrete Approach Slabs | 819.5 | SQYD | 30.00 | 24,585.00 | 32.00 | 26,224.00 | 67.00 | 54,906.50 | 100.00 | 81,950.00 | 0008 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 30,000.00 | 30,000.00 | 34,300.00 | 34,300.00 | 79,300.00 | 79,300.00 | 25,000.00 | 25,000.00 | 0009 | 202-02-06100 | Removal of Concrete Walks and Drives | 7,444 | SQYD | 15.00 | 111,660.00 | 21.00 | 156,324.00 | 22.00 | 163,768.00 | 15.00 | 111,660.00 | 0010 | 202-02-06140 | Removal of Curbs (Concrete) | 1,817.5 | LNFT | 1.00 | 1,817.50 | 9.00 | 16,357.50 | 0.50 | 908.75 | 1.00 | 1,817.50 | 0011 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 46,130 | SQYD | 14.00 | 645,820.00 | 9.30 | 429,009.00 | 27.50 | 1,268,575.00 | 25.00 | 1,153,250.00 | 0012 | 202-02-38200 | Removal of Signs | 134 | EACH | 25.00 | 3,350.00 | 11.00 | 1,474.00 | 28.00 | 3,752.00 | 10.00 | 1,340.00 | 0013 | 202-02-38220 | Removal of Sign Supports | 6 | EACH | 450.00 | 2,700.00 | 11.00 | 66.00 | 448.00 | 2,688.00 | 10.00 | 60.00 | 0014 | 202-02-38300 | Removal of Sign and U-Channel Post | 353 | EACH | 17.00 | 6,001.00 | 11.00 | 3,883.00 | 18.00 | 6,354.00 | 10.00 | 3,530.00 | 0015 | 202-03-00010 | Relocation Overhead Light | 2 | EACH | 10,000.00 | 20,000.00 | 5,360.00 | 10,720.00 | 3,100.00 | 6,200.00 | 3,000.00 | 6,000.00 | 0016 | 203-01-00100 | General Excavation | 11,214 | CUYD | 35.00 | 392,490.00 | 27.00 | 302,778.00 | 14.00 | 156,996.00 | 25.00 | 280,350.00 | 0017 | 203-03-00100 | Embankment | 2,360 | CUYD | 40.00 | 94,400.00 | 60.00 | 141,600.00 | 27.00 | 63,720.00 | 40.00 | 94,400.00 | 0018 | 204-06-00100 | Temporary Silt Fencing | 1,500 | LNFT | 4.00 | 6,000.00 | 4.30 | 6,450.00 | 2.50 | 3,750.00 | 10.00 | 15,000.00 | 0019 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 46,976.1 | SQYD | 36.50 | 1,714,627.65 | 22.00 | 1,033,474.20 | 31.50 | 1,479,747.15 | 35.00 | 1,644,163.50 | 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 500 | CUYD | 50.00 | 25,000.00 | 80.00 | 40,000.00 | 148.00 | 74,000.00 | 50.00 | 25,000.00 | 0021 | 502-01-00100 | Asphalt Concrete | 5,567.9 | TON | 165.00 | 918,703.50 | 130.00 | 723,827.00 | 229.00 | 1,275,049.10 | 150.00 | 835,185.00 | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 212.5 | TON | 350.00 | 74,375.00 | 260.00 | 55,250.00 | 478.00 | 101,575.00 | 400.00 | 85,000.00 | 0023 | 509-01-00100 | Milling Asphalt Pavement | 43,795 | SQYD | 3.00 | 131,385.00 | 2.40 | 105,108.00 | 7.60 | 332,842.00 | 7.00 | 306,565.00 | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,825 | CUYD | 0.01 | -18.25 | 0.01 | -18.25 | 0.01 | -18.25 | 0.01 | -18.25 | 0025 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 60 | EACH | 100.00 | 6,000.00 | 430.00 | 25,800.00 | 450.00 | 27,000.00 | 250.00 | 15,000.00 | 0026 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 13,537 | LNFT | 3.00 | 40,611.00 | 4.00 | 54,148.00 | 2.00 | 27,074.00 | 1.00 | 13,537.00 | 0027 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 20,306 | LNFT | 3.00 | 60,918.00 | 4.00 | 81,224.00 | 2.00 | 40,612.00 | 1.00 | 20,306.00 | 0028 | 602-03-00100 | Cleaning and Sealing Random Cracks | 500 | LNFT | 6.00 | 3,000.00 | 4.80 | 2,400.00 | 5.00 | 2,500.00 | 7.00 | 3,500.00 | 0029 | 702-04-00100 | Adjusting Manholes | 130 | EACH | 1,000.00 | 130,000.00 | 1,110.00 | 144,300.00 | 600.00 | 78,000.00 | 500.00 | 65,000.00 | 0030 | 702-04-00200 | Adjusting Catch Basins | 113 | EACH | 1,000.00 | 113,000.00 | 840.00 | 94,920.00 | 700.00 | 79,100.00 | 750.00 | 84,750.00 | 0031 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 300 | LNFT | 110.00 | 33,000.00 | 140.00 | 42,000.00 | 112.00 | 33,600.00 | 125.00 | 37,500.00 | 0032 | 706-01-00100 | Concrete Walk (4" Thick) | 5,310.5 | SQYD | 70.00 | 371,735.00 | 85.00 | 451,392.50 | 90.00 | 477,945.00 | 100.00 | 531,050.00 | 0033 | 706-02-00200 | Concrete Drive (6" Thick) | 2,066.6 | SQYD | 100.00 | 206,660.00 | 91.00 | 188,060.60 | 97.00 | 200,460.20 | 100.00 | 206,660.00 | 0034 | 706-02-00300 | Concrete Drive (8" Thick) | 812.5 | SQYD | 110.00 | 89,375.00 | 120.00 | 97,500.00 | 127.00 | 103,187.50 | 125.00 | 101,562.50 | 0035 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 816.1 | SQYD | 105.00 | 85,690.50 | 91.00 | 74,265.10 | 96.00 | 78,345.60 | 100.00 | 81,610.00 | 0036 | 706-04-00110 | Curb Ramps (TYPE 1)(6" THICK) | 64 | SQYD | 125.00 | 8,000.00 | 270.00 | 17,280.00 | 285.00 | 18,240.00 | 235.00 | 15,040.00 | 0037 | 706-04-00110 | Curb Ramps (TYPE 2)(6" THICK) | 624 | SQYD | 135.00 | 84,240.00 | 270.00 | 168,480.00 | 285.00 | 177,840.00 | 235.00 | 146,640.00 | 0038 | 706-04-00110 | Curb Ramps (TYPE 3)(6" THICK) | 16.2 | SQYD | 150.00 | 2,430.00 | 320.00 | 5,184.00 | 336.00 | 5,443.20 | 235.00 | 3,807.00 | 0039 | 706-04-00110 | Curb Ramps (TYPE 7)(6" THICK) | 1,276.8 | SQYD | 125.00 | 159,600.00 | 290.00 | 370,272.00 | 302.00 | 385,593.60 | 235.00 | 300,048.00 | 0040 | 706-04-00110 | Curb Ramps (TYPE 8)(6" THICK) | 62 | SQYD | 125.00 | 7,750.00 | 290.00 | 17,980.00 | 302.00 | 18,724.00 | 235.00 | 14,570.00 | 0041 | 706-04-00110 | Curb Ramps Type pending | 1,649 | SQYD | 125.00 | 206,125.00 | 290.00 | 478,210.00 | 302.00 | 497,998.00 | 235.00 | 387,515.00 | 0042 | 707-01-00100 | Concrete Curb | 26,130.3 | LNFT | 15.00 | 391,954.50 | 19.00 | 496,475.70 | 27.00 | 705,518.10 | 20.00 | 522,606.00 | 0043 | 711-04-00100 | Geotextile Fabric | 99,729.2 | SQYD | 1.00 | 99,729.20 | 1.70 | 169,539.64 | 1.75 | 174,526.10 | 0.01 | 997.29 | 0044 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 1,059 | SQYD | 85.00 | 90,015.00 | 110.00 | 116,490.00 | 190.00 | 201,210.00 | 200.00 | 211,800.00 | 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 400,000.00 | 400,000.00 | 465,000.00 | 465,000.00 | 260,000.00 | 260,000.00 | 500,000.00 | 500,000.00 | 0046 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 7,500 | LNFT | 0.25 | 1,875.00 | 0.21 | 1,575.00 | 0.25 | 1,875.00 | 0.20 | 1,500.00 | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 1,740,000.00 | 1,740,000.00 | 1,600,000.00 | 1,600,000.00 | 1,000,000.00 | 1,000,000.00 | 2,000,000.00 | 2,000,000.00 | 0048 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 2,321 | SQFT | 35.00 | 81,235.00 | 15.00 | 34,815.00 | 33.00 | 76,593.00 | 13.00 | 30,173.00 | 0049 | 729-16-00300 | Object Marker Assembly (Type 3) | 152 | EACH | 100.00 | 15,200.00 | 120.00 | 18,240.00 | 100.00 | 15,200.00 | 105.00 | 15,960.00 | 0050 | 729-21-00100 | U-Channel Post | 455 | EACH | 200.00 | 91,000.00 | 110.00 | 50,050.00 | 168.00 | 76,440.00 | 100.00 | 45,500.00 | 0051 | 731-02-00100 | Reflectorized Raised Pavement Markers | 565 | EACH | 8.00 | 4,520.00 | 6.90 | 3,898.50 | 7.00 | 3,955.00 | 7.00 | 3,955.00 | 0052 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 61,394 | LNFT | 1.00 | 61,394.00 | 1.10 | 67,533.40 | 1.25 | 76,742.50 | 1.00 | 61,394.00 | 0053 | 732-01-01020 | Plastic Pavement Striping (6" Width) (Thermoplastic 90 mil) | 22,249 | LNFT | 2.00 | 44,498.00 | 1.70 | 37,823.30 | 1.80 | 40,048.20 | 2.00 | 44,498.00 | 0054 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 662 | LNFT | 5.00 | 3,310.00 | 4.20 | 2,780.40 | 4.50 | 2,979.00 | 4.00 | 2,648.00 | 0055 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 3,180 | LNFT | 10.00 | 31,800.00 | 7.40 | 23,532.00 | 7.80 | 24,804.00 | 7.00 | 22,260.00 | 0056 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 2,214 | LNFT | 10.00 | 22,140.00 | 8.50 | 18,819.00 | 9.00 | 19,926.00 | 8.00 | 17,712.00 | 0057 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,910 | LNFT | 15.00 | 28,650.00 | 13.00 | 24,830.00 | 12.50 | 23,875.00 | 12.00 | 22,920.00 | 0058 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 85 | EACH | 310.00 | 26,350.00 | 240.00 | 20,400.00 | 252.00 | 21,420.00 | 225.00 | 19,125.00 | 0059 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 375.00 | 3,000.00 | 290.00 | 2,320.00 | 308.00 | 2,464.00 | 275.00 | 2,200.00 | 0060 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 375.00 | 750.00 | 290.00 | 580.00 | 308.00 | 616.00 | 275.00 | 550.00 | 0061 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 375.00 | 750.00 | 290.00 | 580.00 | 308.00 | 616.00 | 275.00 | 550.00 | 0062 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 118 | EACH | 350.00 | 41,300.00 | 270.00 | 31,860.00 | 280.00 | 33,040.00 | 250.00 | 29,500.00 | 0063 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 350.00 | 1,050.00 | 270.00 | 810.00 | 280.00 | 840.00 | 250.00 | 750.00 | 0064 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 60 | EACH | 35.00 | 2,100.00 | 27.00 | 1,620.00 | 28.00 | 1,680.00 | 25.00 | 1,500.00 | 0065 | 732-05-00100 | Removal of Existing Markings | 1.9 | MILE | 5,000.00 | 9,500.00 | 3,180.00 | 6,042.00 | 3,500.00 | 6,650.00 | 3,000.00 | 5,700.00 | 0066 | 736-09-00100 | Loop Detector | 2,248 | LNFT | 40.00 | 89,920.00 | 39.00 | 87,672.00 | 40.00 | 89,920.00 | 35.00 | 78,680.00 | 0067 | 740-01-00100 | Construction Layout | 1 | LUMP | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 30,000.00 | 30,000.00 | 500,000.00 | 500,000.00 | 0068 | 804-01-00300 | Precast Concrete Piles (16") | 3,780 | LNFT | 140.00 | 529,200.00 | 180.00 | 680,400.00 | 193.00 | 729,540.00 | 175.00 | 661,500.00 | 0069 | 804-05-00300 | Precast Concrete Test Piles (16") | 2 | EACH | 75,000.00 | 150,000.00 | 53,500.00 | 107,000.00 | 61,000.00 | 122,000.00 | 25,000.00 | 50,000.00 | 0070 | 804-09-00300 | Static Load Test (Precast Concrete Piles (16")) | 2 | EACH | 40,000.00 | 80,000.00 | 48,200.00 | 96,400.00 | 12,450.00 | 24,900.00 | 10,000.00 | 20,000.00 | 0071 | 804-14-00100 | Dynamic Monitoring Assistance | 4 | EACH | 2,000.00 | 8,000.00 | 2,680.00 | 10,720.00 | 9,600.00 | 38,400.00 | 5,000.00 | 20,000.00 | 0072 | 804-18-00100 | Vibration Monitoring | 60 | DAY | 750.00 | 45,000.00 | 800.00 | 48,000.00 | 1,050.00 | 63,000.00 | 1,000.00 | 60,000.00 | 0073 | 805-01-00100 | Class A1 Concrete (Slab Span) | 285.08 | CUYD | 1,750.00 | 498,890.00 | 2,140.00 | 610,071.20 | 2,700.00 | 769,716.00 | 2,500.00 | 712,700.00 | 0074 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 73.82 | CUYD | 3,000.00 | 221,460.00 | 3,210.00 | 236,962.20 | 3,800.00 | 280,516.00 | 3,500.00 | 258,370.00 | 0075 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,210 | SQFT | 4.00 | 8,840.00 | 3.20 | 7,072.00 | 10.00 | 22,100.00 | 5.00 | 11,050.00 | 0076 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,548 | SQFT | 5.00 | 12,740.00 | 5.40 | 13,759.20 | 9.50 | 24,206.00 | 5.00 | 12,740.00 | 0077 | 806-01-00100 | Deformed Reinforcing Steel | 65,636 | LB | 2.00 | 131,272.00 | 2.10 | 137,835.60 | 2.30 | 150,962.80 | 3.00 | 196,908.00 | 0078 | 810-01-00100 | Concrete Bridge Railing (Standard) | 240 | LNFT | 250.00 | 60,000.00 | 270.00 | 64,800.00 | 418.00 | 100,320.00 | 400.00 | 96,000.00 | 0079 | 810-02-00100 | Metal Bridge Railing | 245 | LNFT | 425.00 | 104,125.00 | 540.00 | 132,300.00 | 600.00 | 147,000.00 | 550.00 | 134,750.00 | 0080 | 810-03-00100 | Concrete and Metal Bridge Railing | 200 | LNFT | 450.00 | 90,000.00 | 590.00 | 118,000.00 | 675.00 | 135,000.00 | 600.00 | 120,000.00 | 0081 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 7,955 | SQFT | 85.00 | 676,175.00 | 91.00 | 723,905.00 | 163.00 | 1,296,665.00 | 140.00 | 1,113,700.00 | 0082 | 815-03-00300 | Joint Seal (Poured) | 688 | LNFT | 40.00 | 27,520.00 | 54.00 | 37,152.00 | 35.00 | 24,080.00 | 30.00 | 20,640.00 | 0083 | 830-01-00100 | Bridge Superstructure Repair Existing Barrier Rail Repair | 13 | EACH | 3,500.00 | 45,500.00 | 4,280.00 | 55,640.00 | 7,900.00 | 102,700.00 | 7,000.00 | 91,000.00 | 0084 | 830-02-00100 | Bridge Substructure Repair Cross-Bracing Replacement | 6 | EACH | 1,500.00 | 9,000.00 | 1,070.00 | 6,420.00 | 9,036.00 | 54,216.00 | 8,000.00 | 48,000.00 | 0085 | 830-02-00100 | Bridge Substructure Repair Steel Collar Pile Repairs | 5 | EACH | 6,500.00 | 32,500.00 | 8,030.00 | 40,150.00 | 27,400.00 | 137,000.00 | 20,000.00 | 100,000.00 | 0086 | 830-07-00100 | Structural Concrete Patching Longitudinal Joints | 190 | SQFT | 90.00 | 17,100.00 | 130.00 | 24,700.00 | 512.00 | 97,280.00 | 500.00 | 95,000.00 | 0087 | 830-07-00100 | Structural Concrete Patching Spalls | 85 | SQFT | 150.00 | 12,750.00 | 150.00 | 12,750.00 | 393.00 | 33,405.00 | 350.00 | 29,750.00 | 0088 | 830-10-00100 | Epoxy Injection | 815 | LNFT | 50.00 | 40,750.00 | 37.00 | 30,155.00 | 142.00 | 115,730.00 | 100.00 | 81,500.00 | 0089 | NS-300-00060 | Geogrid | 46,915.4 | SQYD | 2.00 | 93,830.80 | 2.40 | 112,596.96 | 3.00 | 140,746.20 | 0.01 | 469.15 | 0090 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 12,566 | LNFT | 2.00 | 25,132.00 | 2.10 | 26,388.60 | 2.80 | 35,184.80 | 6.00 | 75,396.00 | 0091 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 17,387 | LNFT | 2.00 | 34,774.00 | 3.70 | 64,331.90 | 2.80 | 48,683.60 | 6.00 | 104,322.00 | 0092 | NS-702-00001 | Cleaning Existing Catch Basin | 100 | EACH | 150.00 | 15,000.00 | 480.00 | 48,000.00 | 420.00 | 42,000.00 | 500.00 | 50,000.00 | 0093 | NS-702-00002 | Cleaning Existing Manhole | 50 | EACH | 150.00 | 7,500.00 | 480.00 | 24,000.00 | 630.00 | 31,500.00 | 500.00 | 25,000.00 | 0094 | NS-719-00001 | Tree Protection Fencing | 1 | LUMP | 25,000.00 | 25,000.00 | 20,900.00 | 20,900.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 0095 | NS-719-00002 | Tree Trimming | 1 | LUMP | 25,000.00 | 25,000.00 | 22,400.00 | 22,400.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 0096 | NS-719-00003 | Root Pruning | 1 | LUMP | 30,000.00 | 30,000.00 | 23,800.00 | 23,800.00 | 35,000.00 | 35,000.00 | 1,000.00 | 1,000.00 | 0097 | NS-744-00001 | Flexible Barrier Markers | 425 | EACH | 7.00 | 2,975.00 | 86.00 | 36,550.00 | 200.00 | 85,000.00 | 50.00 | 21,250.00 | 0098 | NS-830-00900 | Epoxy-Urethane Overlay | 7,904 | SQFT | 37.50 | 296,400.00 | 54.00 | 426,816.00 | 40.00 | 316,160.00 | 50.00 | 395,200.00 | 0099 | NS-MSC-00007 | Colored Surfacing Treatment (GREEN) | 654 | SQYD | 30.00 | 19,620.00 | 27.00 | 17,658.00 | 28.00 | 18,312.00 | 25.00 | 16,350.00 | 0100 | TS-601-00100 | Portland Cement Concrete Pavement (8" THICK)(REINFORCED) | 44,058 | SQYD | 100.00 | 4,405,800.00 | 91.00 | 4,009,278.00 | 91.00 | 4,009,278.00 | 100.00 | 4,405,800.00 | 0101 | TS-601-00500 | Portland Cement Concrete Pavement (10" THICK)(REINFORCED)(BUS PAD) | 1,141 | SQYD | 130.00 | 148,330.00 | 210.00 | 239,610.00 | 180.00 | 205,380.00 | 250.00 | 285,250.00 | 0102 | TS-700-00010 | Benches (Park) (6' Metal) | 2 | EACH | 2,500.00 | 5,000.00 | 3,970.00 | 7,940.00 | 5,200.00 | 10,400.00 | 3,000.00 | 6,000.00 | 0103 | TS-707-00310 | Concrete Curb Barrier (Drilled and Doweled) | 850 | LNFT | 35.00 | 29,750.00 | 120.00 | 102,000.00 | 150.00 | 127,500.00 | 50.00 | 42,500.00 | 0104 | TS-707-00320 | Temporary Curb and Gutter Inlet Protection System | 113 | EACH | 50.00 | 5,650.00 | 73.00 | 8,249.00 | 60.00 | 6,780.00 | 10.00 | 1,130.00 | 0105 | TS-714-00200 | Slab Sodding (Common Bermuda) | 5,003 | SQYD | 10.00 | 50,030.00 | 12.00 | 60,036.00 | 12.00 | 60,036.00 | 8.00 | 40,024.00 | 0106 | TS-715-00100 | Soil Preparation | 732 | SQYD | 50.00 | 36,600.00 | 49.00 | 35,868.00 | 10.00 | 7,320.00 | 10.00 | 7,320.00 | 0107 | TS-719-01080 | Plants (TREE)(BALLED AND BURLAPPED)(3 INCH CAL)(ORNAMENTAL TREE) | 17 | LUMP | 500.00 | 8,500.00 | 490.00 | 8,330.00 | 1,300.00 | 22,100.00 | 500.00 | 8,500.00 | 0108 | TS-719-01080 | Plants (TREE)(BALLED AND BURLAPPED)(3 INCH CAL)(SHADE TREE) | 21 | LUMP | 500.00 | 10,500.00 | 370.00 | 7,770.00 | 1,300.00 | 27,300.00 | 500.00 | 10,500.00 | 0109 | TS-741-10013 | Adjust Water Valve Box | 13 | EACH | 1,200.00 | 15,600.00 | 1,240.00 | 16,120.00 | 330.00 | 4,290.00 | 250.00 | 3,250.00 | 0110 | TS-800-00210 | Safety Rail (Furnished and Installed) (CURB RAILING) | 740 | LNFT | 150.00 | 111,000.00 | 170.00 | 125,800.00 | 205.00 | 151,700.00 | 150.00 | 111,000.00 | 0111 | TS-MSC-00300 | Bike Racks | 2 | EACH | 1,000.00 | 2,000.00 | 2,130.00 | 4,260.00 | 6,100.00 | 12,200.00 | 1,250.00 | 2,500.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 17,758,895.40 | | 17,794,201.25 | | 20,458,590.65 | | 20,782,450.69 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Boh Bros. Construction Co., LLC. | - 6 - JB JAMES CONSTRUCTION LLC | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,000.00 | 5,000.00 | 600,000.00 | 600,000.00 | 0002 | 202-02-00030 | Removal of Joint Material | 688 | LNFT | 16.00 | 11,008.00 | 12.00 | 8,256.00 | 0003 | 202-02-00030 | Removal of Metal Bridge Railing | 245 | LNFT | 220.00 | 53,900.00 | 25.00 | 6,125.00 | 0004 | 202-02-00050 | Removal of Debris | 1 | LUMP | 37,500.00 | 37,500.00 | 67,000.00 | 67,000.00 | 0005 | 202-02-04501 | Removal of Bridge Benson Canal Bridge 76' Long, 39.5' Wide | 1 | LUMP | 120,000.00 | 120,000.00 | 600,000.00 | 600,000.00 | 0006 | 202-02-04501 | Removal of Bridge Farrar Canal Bridge 76' Long 39.5 Wide | 1 | LUMP | 120,000.00 | 120,000.00 | 600,000.00 | 600,000.00 | 0007 | 202-02-06000 | Removal of Concrete Approach Slabs | 819.5 | SQYD | 148.00 | 121,286.00 | 125.00 | 102,437.50 | 0008 | 202-02-06090 | Removal of Concrete Revetment | 1 | LUMP | 300,000.00 | 300,000.00 | 150,000.00 | 150,000.00 | 0009 | 202-02-06100 | Removal of Concrete Walks and Drives | 7,444 | SQYD | 23.00 | 171,212.00 | 14.00 | 104,216.00 | 0010 | 202-02-06140 | Removal of Curbs (Concrete) | 1,817.5 | LNFT | 14.00 | 25,445.00 | 9.00 | 16,357.50 | 0011 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 46,130 | SQYD | 13.50 | 622,755.00 | 24.00 | 1,107,120.00 | 0012 | 202-02-38200 | Removal of Signs | 134 | EACH | 12.00 | 1,608.00 | 10.00 | 1,340.00 | 0013 | 202-02-38220 | Removal of Sign Supports | 6 | EACH | 12.00 | 72.00 | 10.00 | 60.00 | 0014 | 202-02-38300 | Removal of Sign and U-Channel Post | 353 | EACH | 12.00 | 4,236.00 | 10.00 | 3,530.00 | 0015 | 202-03-00010 | Relocation Overhead Light | 2 | EACH | 3,000.00 | 6,000.00 | 12,000.00 | 24,000.00 | 0016 | 203-01-00100 | General Excavation | 11,214 | CUYD | 40.00 | 448,560.00 | 50.00 | 560,700.00 | 0017 | 203-03-00100 | Embankment | 2,360 | CUYD | 62.00 | 146,320.00 | 340.00 | 802,400.00 | 0018 | 204-06-00100 | Temporary Silt Fencing | 1,500 | LNFT | 4.00 | 6,000.00 | 7.00 | 10,500.00 | 0019 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 46,976.1 | SQYD | 38.00 | 1,785,091.80 | 48.00 | 2,254,852.80 | 0020 | 401-01-00100 | Aggregate Surface Course (Net Section) | 500 | CUYD | 125.00 | 62,500.00 | 125.00 | 62,500.00 | 0021 | 502-01-00100 | Asphalt Concrete | 5,567.9 | TON | 227.00 | 1,263,913.30 | 150.00 | 835,185.00 | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 212.5 | TON | 475.00 | 100,937.50 | 320.00 | 68,000.00 | 0023 | 509-01-00100 | Milling Asphalt Pavement | 43,795 | SQYD | 7.50 | 328,462.50 | 8.00 | 350,360.00 | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,825 | CUYD | 0.01 | -18.25 | 0.01 | -18.25 | 0025 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 60 | EACH | 200.00 | 12,000.00 | 350.00 | 21,000.00 | 0026 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 13,537 | LNFT | 4.25 | 57,532.25 | 2.70 | 36,549.90 | 0027 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 20,306 | LNFT | 4.25 | 86,300.50 | 2.80 | 56,856.80 | 0028 | 602-03-00100 | Cleaning and Sealing Random Cracks | 500 | LNFT | 5.25 | 2,625.00 | 6.00 | 3,000.00 | 0029 | 702-04-00100 | Adjusting Manholes | 130 | EACH | 2,100.00 | 273,000.00 | 5,000.00 | 650,000.00 | 0030 | 702-04-00200 | Adjusting Catch Basins | 113 | EACH | 3,650.00 | 412,450.00 | 4,900.00 | 553,700.00 | 0031 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 300 | LNFT | 142.00 | 42,600.00 | 125.00 | 37,500.00 | 0032 | 706-01-00100 | Concrete Walk (4" Thick) | 5,310.5 | SQYD | 91.00 | 483,255.50 | 85.00 | 451,392.50 | 0033 | 706-02-00200 | Concrete Drive (6" Thick) | 2,066.6 | SQYD | 98.00 | 202,526.80 | 90.00 | 185,994.00 | 0034 | 706-02-00300 | Concrete Drive (8" Thick) | 812.5 | SQYD | 129.00 | 104,812.50 | 115.00 | 93,437.50 | 0035 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 816.1 | SQYD | 98.00 | 79,977.80 | 100.00 | 81,610.00 | 0036 | 706-04-00110 | Curb Ramps (TYPE 1)(6" THICK) | 64 | SQYD | 290.00 | 18,560.00 | 215.00 | 13,760.00 | 0037 | 706-04-00110 | Curb Ramps (TYPE 2)(6" THICK) | 624 | SQYD | 290.00 | 180,960.00 | 215.00 | 134,160.00 | 0038 | 706-04-00110 | Curb Ramps (TYPE 3)(6" THICK) | 16.2 | SQYD | 340.00 | 5,508.00 | 215.00 | 3,483.00 | 0039 | 706-04-00110 | Curb Ramps (TYPE 7)(6" THICK) | 1,276.8 | SQYD | 308.00 | 393,254.40 | 215.00 | 274,512.00 | 0040 | 706-04-00110 | Curb Ramps (TYPE 8)(6" THICK) | 62 | SQYD | 308.00 | 19,096.00 | 215.00 | 13,330.00 | 0041 | 706-04-00110 | Curb Ramps Type pending | 1,649 | SQYD | 308.00 | 507,892.00 | 215.00 | 354,535.00 | 0042 | 707-01-00100 | Concrete Curb | 26,130.3 | LNFT | 31.00 | 810,039.30 | 12.00 | 313,563.60 | 0043 | 711-04-00100 | Geotextile Fabric | 99,729.2 | SQYD | 2.00 | 199,458.40 | 2.50 | 249,323.00 | 0044 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 1,059 | SQYD | 429.00 | 454,311.00 | 300.00 | 317,700.00 | 0045 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 1,400,000.00 | 1,400,000.00 | 0046 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 7,500 | LNFT | 0.25 | 1,875.00 | 0.35 | 2,625.00 | 0047 | 727-01-00100 | Mobilization | 1 | LUMP | 945,000.00 | 945,000.00 | 3,200,000.00 | 3,200,000.00 | 0048 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 2,321 | SQFT | 15.00 | 34,815.00 | 13.00 | 30,173.00 | 0049 | 729-16-00300 | Object Marker Assembly (Type 3) | 152 | EACH | 120.00 | 18,240.00 | 105.00 | 15,960.00 | 0050 | 729-21-00100 | U-Channel Post | 455 | EACH | 108.00 | 49,140.00 | 95.00 | 43,225.00 | 0051 | 731-02-00100 | Reflectorized Raised Pavement Markers | 565 | EACH | 7.50 | 4,237.50 | 6.50 | 3,672.50 | 0052 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 61,394 | LNFT | 1.25 | 76,742.50 | 0.85 | 52,184.90 | 0053 | 732-01-01020 | Plastic Pavement Striping (6" Width) (Thermoplastic 90 mil) | 22,249 | LNFT | 1.85 | 41,160.65 | 1.50 | 33,373.50 | 0054 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 662 | LNFT | 4.50 | 2,979.00 | 3.00 | 1,986.00 | 0055 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 3,180 | LNFT | 8.00 | 25,440.00 | 6.00 | 19,080.00 | 0056 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 2,214 | LNFT | 9.00 | 19,926.00 | 7.00 | 15,498.00 | 0057 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,910 | LNFT | 13.50 | 25,785.00 | 14.00 | 26,740.00 | 0058 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 85 | EACH | 250.00 | 21,250.00 | 250.00 | 21,250.00 | 0059 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 300.00 | 2,400.00 | 300.00 | 2,400.00 | 0060 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 300.00 | 600.00 | 300.00 | 600.00 | 0061 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 300.00 | 600.00 | 350.00 | 700.00 | 0062 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 118 | EACH | 285.00 | 33,630.00 | 500.00 | 59,000.00 | 0063 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 285.00 | 855.00 | 300.00 | 900.00 | 0064 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 60 | EACH | 285.00 | 17,100.00 | 300.00 | 18,000.00 | 0065 | 732-05-00100 | Removal of Existing Markings | 1.9 | MILE | 3,425.00 | 6,507.50 | 8,000.00 | 15,200.00 | 0066 | 736-09-00100 | Loop Detector | 2,248 | LNFT | 50.00 | 112,400.00 | 35.00 | 78,680.00 | 0067 | 740-01-00100 | Construction Layout | 1 | LUMP | 297,000.00 | 297,000.00 | 400,000.00 | 400,000.00 | 0068 | 804-01-00300 | Precast Concrete Piles (16") | 3,780 | LNFT | 154.00 | 582,120.00 | 190.00 | 718,200.00 | 0069 | 804-05-00300 | Precast Concrete Test Piles (16") | 2 | EACH | 196,000.00 | 392,000.00 | 140,000.00 | 280,000.00 | 0070 | 804-09-00300 | Static Load Test (Precast Concrete Piles (16")) | 2 | EACH | 233,230.00 | 466,460.00 | 180,000.00 | 360,000.00 | 0071 | 804-14-00100 | Dynamic Monitoring Assistance | 4 | EACH | 7,625.00 | 30,500.00 | 2,000.00 | 8,000.00 | 0072 | 804-18-00100 | Vibration Monitoring | 60 | DAY | 725.00 | 43,500.00 | 3,200.00 | 192,000.00 | 0073 | 805-01-00100 | Class A1 Concrete (Slab Span) | 285.08 | CUYD | 3,520.00 | 1,003,481.60 | 1,600.00 | 456,128.00 | 0074 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 73.82 | CUYD | 6,825.00 | 503,821.50 | 3,800.00 | 280,516.00 | 0075 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,210 | SQFT | 4.50 | 9,945.00 | 2.00 | 4,420.00 | 0076 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,548 | SQFT | 4.00 | 10,192.00 | 3.00 | 7,644.00 | 0077 | 806-01-00100 | Deformed Reinforcing Steel | 65,636 | LB | 2.00 | 131,272.00 | 2.20 | 144,399.20 | 0078 | 810-01-00100 | Concrete Bridge Railing (Standard) | 240 | LNFT | 482.00 | 115,680.00 | 250.00 | 60,000.00 | 0079 | 810-02-00100 | Metal Bridge Railing | 245 | LNFT | 580.00 | 142,100.00 | 650.00 | 159,250.00 | 0080 | 810-03-00100 | Concrete and Metal Bridge Railing | 200 | LNFT | 800.00 | 160,000.00 | 600.00 | 120,000.00 | 0081 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 7,955 | SQFT | 122.00 | 970,510.00 | 120.00 | 954,600.00 | 0082 | 815-03-00300 | Joint Seal (Poured) | 688 | LNFT | 33.00 | 22,704.00 | 30.00 | 20,640.00 | 0083 | 830-01-00100 | Bridge Superstructure Repair Existing Barrier Rail Repair | 13 | EACH | 9,725.00 | 126,425.00 | 3,600.00 | 46,800.00 | 0084 | 830-02-00100 | Bridge Substructure Repair Cross-Bracing Replacement | 6 | EACH | 27,250.00 | 163,500.00 | 10,000.00 | 60,000.00 | 0085 | 830-02-00100 | Bridge Substructure Repair Steel Collar Pile Repairs | 5 | EACH | 19,475.00 | 97,375.00 | 8,500.00 | 42,500.00 | 0086 | 830-07-00100 | Structural Concrete Patching Longitudinal Joints | 190 | SQFT | 370.00 | 70,300.00 | 750.00 | 142,500.00 | 0087 | 830-07-00100 | Structural Concrete Patching Spalls | 85 | SQFT | 340.00 | 28,900.00 | 1,000.00 | 85,000.00 | 0088 | 830-10-00100 | Epoxy Injection | 815 | LNFT | 118.00 | 96,170.00 | 220.00 | 179,300.00 | 0089 | NS-300-00060 | Geogrid | 46,915.4 | SQYD | 2.75 | 129,017.35 | 3.00 | 140,746.20 | 0090 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 12,566 | LNFT | 2.25 | 28,273.50 | 2.00 | 25,132.00 | 0091 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 17,387 | LNFT | 4.00 | 69,548.00 | 2.00 | 34,774.00 | 0092 | NS-702-00001 | Cleaning Existing Catch Basin | 100 | EACH | 500.00 | 50,000.00 | 600.00 | 60,000.00 | 0093 | NS-702-00002 | Cleaning Existing Manhole | 50 | EACH | 500.00 | 25,000.00 | 700.00 | 35,000.00 | 0094 | NS-719-00001 | Tree Protection Fencing | 1 | LUMP | 14,250.00 | 14,250.00 | 25,000.00 | 25,000.00 | 0095 | NS-719-00002 | Tree Trimming | 1 | LUMP | 18,250.00 | 18,250.00 | 40,000.00 | 40,000.00 | 0096 | NS-719-00003 | Root Pruning | 1 | LUMP | 37,000.00 | 37,000.00 | 8,000.00 | 8,000.00 | 0097 | NS-744-00001 | Flexible Barrier Markers | 425 | EACH | 85.00 | 36,125.00 | 75.00 | 31,875.00 | 0098 | NS-830-00900 | Epoxy-Urethane Overlay | 7,904 | SQFT | 91.00 | 719,264.00 | 15.00 | 118,560.00 | 0099 | NS-MSC-00007 | Colored Surfacing Treatment (GREEN) | 654 | SQYD | 28.00 | 18,312.00 | 200.00 | 130,800.00 | 0100 | TS-601-00100 | Portland Cement Concrete Pavement (8" THICK)(REINFORCED) | 44,058 | SQYD | 121.00 | 5,331,018.00 | 230.00 | 10,133,340.00 | 0101 | TS-601-00500 | Portland Cement Concrete Pavement (10" THICK)(REINFORCED)(BUS PAD) | 1,141 | SQYD | 250.00 | 285,250.00 | 240.00 | 273,840.00 | 0102 | TS-700-00010 | Benches (Park) (6' Metal) | 2 | EACH | 1,700.00 | 3,400.00 | 12,000.00 | 24,000.00 | 0103 | TS-707-00310 | Concrete Curb Barrier (Drilled and Doweled) | 850 | LNFT | 45.00 | 38,250.00 | 50.00 | 42,500.00 | 0104 | TS-707-00320 | Temporary Curb and Gutter Inlet Protection System | 113 | EACH | 65.00 | 7,345.00 | 115.00 | 12,995.00 | 0105 | TS-714-00200 | Slab Sodding (Common Bermuda) | 5,003 | SQYD | 11.50 | 57,534.50 | 14.00 | 70,042.00 | 0106 | TS-715-00100 | Soil Preparation | 732 | SQYD | 45.00 | 32,940.00 | 50.00 | 36,600.00 | 0107 | TS-719-01080 | Plants (TREE)(BALLED AND BURLAPPED)(3 INCH CAL)(ORNAMENTAL TREE) | 17 | LUMP | 450.00 | 7,650.00 | 425.00 | 7,225.00 | 0108 | TS-719-01080 | Plants (TREE)(BALLED AND BURLAPPED)(3 INCH CAL)(SHADE TREE) | 21 | LUMP | 340.00 | 7,140.00 | 425.00 | 8,925.00 | 0109 | TS-741-10013 | Adjust Water Valve Box | 13 | EACH | 1,000.00 | 13,000.00 | 300.00 | 3,900.00 | 0110 | TS-800-00210 | Safety Rail (Furnished and Installed) (CURB RAILING) | 740 | LNFT | 170.00 | 125,800.00 | 150.00 | 111,000.00 | 0111 | TS-MSC-00300 | Bike Racks | 2 | EACH | 1,150.00 | 2,300.00 | 7,500.00 | 15,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 24,249,254.90 | | 33,332,728.15 |
|