Proposal:H.010385.6
Parish:St. John the Baptist
Routes:LA 3127
Description:LA 3127: ST. JAMES P/L - ST. CHARLES P/L
Type Construction:CLEARING AND GRUBBING, BORROW, DRAINAGE STRUCTURES, CULVERT REHABILITATION, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$14,855,489.58
Rank | License | Bidder | Construction Bid |
1 | 06276 | Barriere Construction Co., LLC | $13,240,935.81 |
2 | 73475 | Madden Gulf Coast, LLC | $14,096,919.06 |
3 | 00046 | Barber Bros. Contracting Co., L.L.C | $15,861,571.40 |
4 | 57931 | KCR CONTRACTORS, LLC | $17,580,433.14 |
5 | 02179 | Boh Bros. Construction Co., LLC. | $21,589,653.37 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Madden Gulf Coast, LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - KCR CONTRACTORS, LLC | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.2 | LUMP | 180,000.00 | 180,000.00 | 65,000.00 | 65,000.00 | 50,000.00 | 50,000.00 | 242,734.49 | 242,734.49 | 0002 | 202-01-00100 | Removal of Structures and Obstructions Non-Friable Asbestos | 1 | LUMP | 345,909.85 | 345,909.85 | 235,000.00 | 235,000.00 | 175,000.00 | 175,000.00 | 2,693,603.84 | 2,693,603.84 | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 7,097 | CUYD | 15.00 | 106,455.00 | 20.00 | 141,940.00 | 30.00 | 212,910.00 | 22.56 | 160,108.32 | 0004 | 203-10-00100 | Cleaning Existing Ditches | 500 | LNFT | 25.50 | 12,750.00 | 10.00 | 5,000.00 | 16.00 | 8,000.00 | 3.36 | 1,680.00 | 0005 | 204-02-00100 | Temporary Hay Bales | 576 | EACH | 45.00 | 25,920.00 | 45.00 | 25,920.00 | 22.00 | 12,672.00 | 49.50 | 28,512.00 | 0006 | 204-06-00100 | Temporary Silt Fencing | 93,808 | LNFT | 0.75 | 70,356.00 | 1.50 | 140,712.00 | 1.75 | 164,164.00 | 1.65 | 154,783.20 | 0007 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 500 | SQYD | 225.00 | 112,500.00 | 50.00 | 25,000.00 | 85.00 | 42,500.00 | 327.53 | 163,765.00 | 0008 | 502-01-00100 | Asphalt Concrete | 39,118.6 | TON | 115.00 | 4,498,639.00 | 98.25 | 3,843,402.45 | 122.00 | 4,772,469.20 | 122.48 | 4,791,246.13 | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 352.6 | TON | 182.00 | 64,173.20 | 78.00 | 27,502.80 | 255.00 | 89,913.00 | 202.35 | 71,348.61 | 0010 | 509-01-00100 | Milling Asphalt Pavement | 229,548 | SQYD | 3.00 | 688,644.00 | 3.00 | 688,644.00 | 5.50 | 1,262,514.00 | 3.73 | 856,214.04 | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -19,701 | CUYD | 15.50 | -305,365.50 | 0.01 | -197.01 | 0.00 | 0.00 | 18.50 | -364,468.50 | 0012 | 510-01-00001 | Pavement Patching (13 inch Minimum Thickness) | 7,997 | SQYD | 101.00 | 807,697.00 | 99.00 | 791,703.00 | 150.00 | 1,199,550.00 | 111.83 | 894,304.51 | 0013 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 5,126 | SQYD | 120.00 | 615,120.00 | 123.00 | 630,498.00 | 180.00 | 922,680.00 | 133.13 | 682,424.38 | 0014 | 701-02-02001 | Cross Drain Pipe Arch (24" Equiv. RCPA or 24" Equiv. CMPA) | 3,452 | LNFT | 252.50 | 871,630.00 | 240.00 | 828,480.00 | 230.00 | 793,960.00 | 219.32 | 757,092.64 | 0015 | 701-02-02080 | Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) | 192 | LNFT | 333.00 | 63,936.00 | 275.00 | 52,800.00 | 325.00 | 62,400.00 | 227.88 | 43,752.96 | 0016 | 701-02-02120 | Cross Drain Pipe Arch (42" Equiv. RCPA or 48" Equiv. CMPA) | 768 | LNFT | 348.50 | 267,648.00 | 335.00 | 257,280.00 | 400.00 | 307,200.00 | 277.49 | 213,112.32 | 0017 | 701-02-02160 | Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) | 1,176 | LNFT | 378.75 | 445,410.00 | 365.00 | 429,240.00 | 450.00 | 529,200.00 | 295.75 | 347,802.00 | 0018 | 701-02-02200 | Cross Drain Pipe Arch (54" Equiv. RCPA or 60" Equiv. CMPA) | 1,024 | LNFT | 454.50 | 465,408.00 | 455.00 | 465,920.00 | 530.00 | 542,720.00 | 304.55 | 311,859.20 | 0019 | 701-02-02220 | Cross Drain Pipe Arch (60" Equiv. RCPA or 72" Equiv. CMPA) | 1,036 | LNFT | 606.00 | 627,816.00 | 515.00 | 533,540.00 | 650.00 | 673,400.00 | 401.77 | 416,233.72 | 0020 | 701-14-00100 | Cleaning Existing Pipes | 16,899 | LNFT | 33.80 | 571,186.20 | 73.58 | 1,243,428.42 | 42.00 | 709,758.00 | 80.94 | 1,367,805.06 | 0021 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,728 | LNFT | 1.00 | 1,728.00 | 20.00 | 34,560.00 | 6.00 | 10,368.00 | 43.89 | 75,841.92 | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 950,000.00 | 950,000.00 | 470,000.00 | 470,000.00 | 750,000.00 | 750,000.00 | 530,370.00 | 530,370.00 | 0023 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 180 | LNFT | 0.50 | 90.00 | 0.50 | 90.00 | 0.50 | 90.00 | 0.55 | 99.00 | 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 36 | LNFT | 1.00 | 36.00 | 1.00 | 36.00 | 1.00 | 36.00 | 1.10 | 39.60 | 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 26.652 | MILE | 680.00 | 18,123.36 | 400.00 | 10,660.80 | 325.00 | 8,661.90 | 729.53 | 19,443.43 | 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 26.649 | MILE | 650.00 | 17,321.85 | 650.00 | 17,321.85 | 650.00 | 17,321.85 | 715.00 | 19,054.04 | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 54.21 | MILE | 850.00 | 46,078.50 | 850.00 | 46,078.50 | 850.00 | 46,078.50 | 935.00 | 50,686.35 | 0028 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 6,000.00 | 12,000.00 | 16,000.00 | 32,000.00 | 17,000.00 | 34,000.00 | 24,750.00 | 49,500.00 | 0029 | 724-01-00100 | Rumble Strips (Centerline) | 8.884 | MILE | 275.00 | 2,443.10 | 1,000.00 | 8,884.00 | 325.00 | 2,887.30 | 302.50 | 2,687.41 | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 17.768 | MILE | 275.00 | 4,886.20 | 1,000.00 | 17,768.00 | 325.00 | 5,774.60 | 302.50 | 5,374.82 | 0031 | 726-01-00100 | Bedding Material | 1,977.8 | CUYD | 1.00 | 1,977.80 | 140.00 | 276,892.00 | 100.00 | 197,780.00 | 127.92 | 253,000.18 | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 605,000.00 | 605,000.00 | 1,175,000.00 | 1,175,000.00 | 1,425,000.00 | 1,425,000.00 | 963,166.79 | 963,166.79 | 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 70 | EACH | 75.00 | 5,250.00 | 95.00 | 6,650.00 | 85.00 | 5,950.00 | 82.50 | 5,775.00 | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,173 | EACH | 6.00 | 7,038.00 | 6.00 | 7,038.00 | 7.00 | 8,211.00 | 6.60 | 7,741.80 | 0035 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 60 | LNFT | 3.00 | 180.00 | 3.00 | 180.00 | 4.00 | 240.00 | 3.30 | 198.00 | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 2.00 | 24.00 | 20.00 | 240.00 | 23.00 | 276.00 | 22.00 | 264.00 | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.07 | MILE | 3,750.00 | 67,762.50 | 3,750.00 | 67,762.50 | 4,200.00 | 75,894.00 | 4,125.00 | 74,538.75 | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 8.883 | MILE | 1,250.00 | 11,103.75 | 1,250.00 | 11,103.75 | 1,350.00 | 11,992.05 | 1,375.00 | 12,214.13 | 0039 | 739-01-00100 | Hydro-Seeding | 0.2 | ACRE | 15,000.00 | 3,000.00 | 15,000.00 | 3,000.00 | 12,000.00 | 2,400.00 | 16,500.00 | 3,300.00 | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 36,000.00 | 36,000.00 | 12,000.00 | 12,000.00 | 50,000.00 | 50,000.00 | 57,500.00 | 57,500.00 | 0041 | NS-701-00010 | Culvert Rehabilitation by Slip Lining | 606 | LNFT | 1,485.00 | 899,910.00 | 2,400.00 | 1,454,400.00 | 1,100.00 | 666,600.00 | 2,640.00 | 1,599,840.00 | 0042 | NS-702-00001 | Cleaning Existing Catch Basin | 20 | EACH | 757.50 | 15,150.00 | 722.00 | 14,440.00 | 550.00 | 11,000.00 | 794.20 | 15,884.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 13,240,935.81 | | 14,096,919.06 | | 15,861,571.40 | | 17,580,433.14 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Boh Bros. Construction Co., LLC. | Unit Price | Total Amount | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.2 | LUMP | 40,000.00 | 40,000.00 | 0002 | 202-01-00100 | Removal of Structures and Obstructions Non-Friable Asbestos | 1 | LUMP | 925,000.00 | 925,000.00 | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 7,097 | CUYD | 30.00 | 212,910.00 | 0004 | 203-10-00100 | Cleaning Existing Ditches | 500 | LNFT | 20.00 | 10,000.00 | 0005 | 204-02-00100 | Temporary Hay Bales | 576 | EACH | 50.00 | 28,800.00 | 0006 | 204-06-00100 | Temporary Silt Fencing | 93,808 | LNFT | 2.50 | 234,520.00 | 0007 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 500 | SQYD | 100.00 | 50,000.00 | 0008 | 502-01-00100 | Asphalt Concrete | 39,118.6 | TON | 180.00 | 7,041,348.00 | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 352.6 | TON | 325.00 | 114,595.00 | 0010 | 509-01-00100 | Milling Asphalt Pavement | 229,548 | SQYD | 7.00 | 1,606,836.00 | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -19,701 | CUYD | 0.01 | -197.01 | 0012 | 510-01-00001 | Pavement Patching (13 inch Minimum Thickness) | 7,997 | SQYD | 250.00 | 1,999,250.00 | 0013 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 5,126 | SQYD | 260.00 | 1,332,760.00 | 0014 | 701-02-02001 | Cross Drain Pipe Arch (24" Equiv. RCPA or 24" Equiv. CMPA) | 3,452 | LNFT | 325.00 | 1,121,900.00 | 0015 | 701-02-02080 | Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) | 192 | LNFT | 350.00 | 67,200.00 | 0016 | 701-02-02120 | Cross Drain Pipe Arch (42" Equiv. RCPA or 48" Equiv. CMPA) | 768 | LNFT | 450.00 | 345,600.00 | 0017 | 701-02-02160 | Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) | 1,176 | LNFT | 550.00 | 646,800.00 | 0018 | 701-02-02200 | Cross Drain Pipe Arch (54" Equiv. RCPA or 60" Equiv. CMPA) | 1,024 | LNFT | 700.00 | 716,800.00 | 0019 | 701-02-02220 | Cross Drain Pipe Arch (60" Equiv. RCPA or 72" Equiv. CMPA) | 1,036 | LNFT | 825.00 | 854,700.00 | 0020 | 701-14-00100 | Cleaning Existing Pipes | 16,899 | LNFT | 25.00 | 422,475.00 | 0021 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,728 | LNFT | 6.00 | 10,368.00 | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 900,000.00 | 900,000.00 | 0023 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 180 | LNFT | 1.00 | 180.00 | 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 36 | LNFT | 2.00 | 72.00 | 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 26.652 | MILE | 500.00 | 13,326.00 | 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 26.649 | MILE | 725.00 | 19,320.53 | 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 54.21 | MILE | 1,000.00 | 54,210.00 | 0028 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 15,000.00 | 30,000.00 | 0029 | 724-01-00100 | Rumble Strips (Centerline) | 8.884 | MILE | 300.00 | 2,665.20 | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 17.768 | MILE | 300.00 | 5,330.40 | 0031 | 726-01-00100 | Bedding Material | 1,977.8 | CUYD | 100.00 | 197,780.00 | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 1,500,000.00 | 1,500,000.00 | 0033 | 729-16-00200 | Object Marker Assembly (Type 2) | 70 | EACH | 125.00 | 8,750.00 | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,173 | EACH | 8.00 | 9,384.00 | 0035 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 60 | LNFT | 4.25 | 255.00 | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 35.00 | 420.00 | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.07 | MILE | 5,000.00 | 90,350.00 | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 8.883 | MILE | 1,750.00 | 15,545.25 | 0039 | 739-01-00100 | Hydro-Seeding | 0.2 | ACRE | 30,000.00 | 6,000.00 | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 0041 | NS-701-00010 | Culvert Rehabilitation by Slip Lining | 606 | LNFT | 1,400.00 | 848,400.00 | 0042 | NS-702-00001 | Cleaning Existing Catch Basin | 20 | EACH | 300.00 | 6,000.00 | | | | | | | | | | CONTRACTOR TOTAL | | | | 21,589,653.37 |
|