Proposal:H.010384.6
Parish:Livingston
Routes:LA 442
Description:LA 442: LA 63 - W. JCT. LA 441
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,646,150.70
Rank | License | Bidder | Construction Bid |
1 | 73475 | Madden Gulf Coast, LLC | $3,310,373.23 |
2 | 12031 | R.J. Daigle & Sons Contractors, Inc | $3,570,139.83 |
3 | 00046 | Barber Bros. Contracting Co., L.L.C | $3,648,738.43 |
4 | 06276 | Barriere Construction Co., LLC | $3,827,980.89 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Gulf Coast, LLC | - 2 - R.J. Daigle & Sons Contractors, Inc | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - Barriere Construction Co., LLC | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | 0001 | 201-01-00100 | Clearing and Grubbing | 1.97 | LUMP | 12,000.00 | 12,000.00 | 64,000.00 | 64,000.00 | 50,000.00 | 50,000.00 | 12,000.00 | 12,000.00 | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 10,500.00 | 10,500.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 0003 | 202-02-00010 | Removal of Concrete Bridge ends | 24 | EACH | 2,000.00 | 48,000.00 | 2,100.00 | 50,400.00 | 1,200.00 | 28,800.00 | 1,750.00 | 42,000.00 | 0004 | 202-02-00020 | Removal of Aggregate shoulder removal | 866 | SQYD | 7.50 | 6,495.00 | 12.50 | 10,825.00 | 15.00 | 12,990.00 | 13.00 | 11,258.00 | 0005 | 202-02-02020 | Removal of Asphalt Pavement | 226.5 | SQYD | 34.00 | 7,701.00 | 26.00 | 5,889.00 | 25.00 | 5,662.50 | 25.00 | 5,662.50 | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 60 | SQYD | 25.00 | 1,500.00 | 32.50 | 1,950.00 | 30.00 | 1,800.00 | 75.00 | 4,500.00 | 0007 | 202-02-14500 | Removal of Guard Rail | 3,186 | LNFT | 6.50 | 20,709.00 | 7.25 | 23,098.50 | 11.00 | 35,046.00 | 10.00 | 31,860.00 | 0008 | 202-02-38300 | Removal of Sign and U-Channel Post | 24 | EACH | 35.00 | 840.00 | 38.00 | 912.00 | 11.00 | 264.00 | 10.00 | 240.00 | 0009 | 203-01-00100 | General Excavation | 17 | CUYD | 50.00 | 850.00 | 30.00 | 510.00 | 85.00 | 1,445.00 | 55.00 | 935.00 | 0010 | 203-03-00100 | Embankment | 53.6 | CUYD | 50.00 | 2,680.00 | 86.00 | 4,609.60 | 110.00 | 5,896.00 | 35.00 | 1,876.00 | 0011 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,766 | CUYD | 36.00 | 63,576.00 | 57.00 | 100,662.00 | 50.00 | 88,300.00 | 72.00 | 127,152.00 | 0012 | 203-10-00100 | Cleaning Existing Ditches | 1,400 | LNFT | 10.00 | 14,000.00 | 6.25 | 8,750.00 | 13.00 | 18,200.00 | 6.00 | 8,400.00 | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 38 | EACH | 140.00 | 5,320.00 | 150.00 | 5,700.00 | 145.00 | 5,510.00 | 150.00 | 5,700.00 | 0014 | 204-06-00100 | Temporary Silt Fencing | 41,948 | LNFT | 1.80 | 75,506.40 | 2.00 | 83,896.00 | 1.80 | 75,506.40 | 2.00 | 83,896.00 | 0015 | 303-02-00100 | Removal of Existing Patches | 1,187 | SQYD | 10.00 | 11,870.00 | 13.00 | 15,431.00 | 8.00 | 9,496.00 | 7.00 | 8,309.00 | 0016 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 39,786 | SQYD | 12.00 | 477,432.00 | 9.00 | 358,074.00 | 10.00 | 397,860.00 | 9.00 | 358,074.00 | 0017 | 304-05-00100 | Lime Treatment (Type E) | 792 | SQYD | 25.00 | 19,800.00 | 19.00 | 15,048.00 | 12.00 | 9,504.00 | 22.00 | 17,424.00 | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 110 | CUYD | 50.00 | 5,500.00 | 290.00 | 31,900.00 | 100.00 | 11,000.00 | 102.00 | 11,220.00 | 0019 | 502-01-00100 | Asphalt Concrete | 13,229.1 | TON | 90.00 | 1,190,619.00 | 107.00 | 1,415,513.70 | 102.00 | 1,349,368.20 | 118.50 | 1,567,648.35 | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 975.3 | TON | 192.00 | 187,257.60 | 145.00 | 141,418.50 | 188.00 | 183,356.40 | 205.00 | 199,936.50 | 0021 | 509-01-00100 | Milling Asphalt Pavement | 77,566 | SQYD | 2.25 | 174,523.50 | 2.75 | 213,306.50 | 3.00 | 232,698.00 | 3.50 | 271,481.00 | 0022 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,447 | CUYD | 0.01 | -44.47 | 0.01 | -44.47 | 0.00 | 0.00 | 0.01 | -44.47 | 0023 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 241 | SQYD | 180.00 | 43,380.00 | 231.00 | 55,671.00 | 125.00 | 30,125.00 | 167.00 | 40,247.00 | 0024 | 701-02-02000 | Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) | 164 | LNFT | 120.00 | 19,680.00 | 255.00 | 41,820.00 | 250.00 | 41,000.00 | 275.00 | 45,100.00 | 0025 | 701-02-02040 | Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) | 328 | LNFT | 145.00 | 47,560.00 | 280.00 | 91,840.00 | 270.00 | 88,560.00 | 275.00 | 90,200.00 | 0026 | 701-02-02160 | Cross Drain Pipe Arch (48" Equiv. RCPA or 54" Equiv. CMPA) | 120 | LNFT | 350.00 | 42,000.00 | 390.00 | 46,800.00 | 380.00 | 45,600.00 | 385.00 | 46,200.00 | 0027 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 224 | LNFT | 20.00 | 4,480.00 | 18.00 | 4,032.00 | 11.00 | 2,464.00 | 1.00 | 224.00 | 0028 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 29.00 | 907.70 | 31.50 | 985.95 | 32.00 | 1,001.60 | 30.00 | 939.00 | 0029 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,476.1 | LNFT | 29.00 | 42,806.90 | 31.50 | 46,497.15 | 32.00 | 47,235.20 | 30.00 | 44,283.00 | 0030 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 190.00 | 1,197.00 | 210.00 | 1,323.00 | 106.00 | 667.80 | 100.00 | 630.00 | 0031 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 480 | LNFT | 47.00 | 22,560.00 | 51.00 | 24,480.00 | 53.00 | 25,440.00 | 50.00 | 24,000.00 | 0032 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 600 | LNFT | 115.00 | 69,000.00 | 129.00 | 77,400.00 | 106.00 | 63,600.00 | 100.00 | 60,000.00 | 0033 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 12 | EACH | 3,650.00 | 43,800.00 | 4,000.00 | 48,000.00 | 4,250.00 | 51,000.00 | 4,000.00 | 48,000.00 | 0034 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,525.00 | 14,100.00 | 4,000.00 | 16,000.00 | 4,000.00 | 16,000.00 | 3,750.00 | 15,000.00 | 0035 | 706-02-00200 | Concrete Drive (6" Thick) | 56.7 | SQYD | 150.00 | 8,505.00 | 220.00 | 12,474.00 | 200.00 | 11,340.00 | 140.00 | 7,938.00 | 0036 | 707-04-00100 | Asphalt Curb | 324 | LNFT | 50.00 | 16,200.00 | 32.00 | 10,368.00 | 55.00 | 17,820.00 | 50.00 | 16,200.00 | 0037 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 160,000.00 | 160,000.00 | 127,500.00 | 127,500.00 | 165,000.00 | 165,000.00 | 185,000.00 | 185,000.00 | 0038 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.833 | MILE | 400.00 | 5,933.20 | 150.00 | 2,224.95 | 300.00 | 4,449.90 | 261.00 | 3,871.41 | 0039 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.25 | MILE | 600.00 | 3,750.00 | 670.00 | 4,187.50 | 600.00 | 3,750.00 | 600.00 | 3,750.00 | 0040 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 42.225 | MILE | 800.00 | 33,780.00 | 910.00 | 38,424.75 | 800.00 | 33,780.00 | 800.00 | 33,780.00 | 0041 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 3,000.00 | 6,000.00 | 9,300.00 | 18,600.00 | 6,000.00 | 12,000.00 | 5,000.00 | 10,000.00 | 0042 | 726-01-00100 | Bedding Material | 56.7 | CUYD | 70.00 | 3,969.00 | 135.00 | 7,654.50 | 142.00 | 8,051.40 | 1.00 | 56.70 | 0043 | 727-01-00100 | Mobilization | 1 | LUMP | 265,000.00 | 265,000.00 | 200,000.00 | 200,000.00 | 300,000.00 | 300,000.00 | 245,000.00 | 245,000.00 | 0044 | 729-16-00200 | Object Marker Assembly (Type 2) | 46 | EACH | 75.00 | 3,450.00 | 86.00 | 3,956.00 | 105.00 | 4,830.00 | 100.00 | 4,600.00 | 0045 | 729-16-00300 | Object Marker Assembly (Type 3) | 24 | EACH | 90.00 | 2,160.00 | 100.00 | 2,400.00 | 160.00 | 3,840.00 | 150.00 | 3,600.00 | 0046 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,760 | EACH | 4.00 | 7,040.00 | 4.50 | 7,920.00 | 4.25 | 7,480.00 | 4.00 | 7,040.00 | 0047 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 44 | LNFT | 15.00 | 660.00 | 16.50 | 726.00 | 16.00 | 704.00 | 15.00 | 660.00 | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.771 | MILE | 4,100.00 | 64,661.10 | 4,500.00 | 70,969.50 | 4,350.00 | 68,603.85 | 4,100.00 | 64,661.10 | 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.434 | MILE | 1,200.00 | 2,920.80 | 1,300.00 | 3,164.20 | 1,270.00 | 3,091.18 | 1,200.00 | 2,920.80 | 0050 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.052 | MILE | 10,000.00 | 520.00 | 10,900.00 | 566.80 | 10,000.00 | 520.00 | 10,000.00 | 520.00 | 0051 | 735-01-00100 | Mailboxes | 22 | EACH | 20.00 | 440.00 | 22.00 | 484.00 | 55.00 | 1,210.00 | 50.00 | 1,100.00 | 0052 | 735-02-00100 | Mailbox Supports (Single) | 22 | EACH | 250.00 | 5,500.00 | 275.00 | 6,050.00 | 160.00 | 3,520.00 | 150.00 | 3,300.00 | 0053 | 739-01-00100 | Hydro-Seeding | 4.3 | ACRE | 3,045.00 | 13,093.50 | 3,400.00 | 14,620.00 | 3,200.00 | 13,760.00 | 2,800.00 | 12,040.00 | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 | 19,000.00 | 19,000.00 | 12,000.00 | 12,000.00 | 0055 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 592 | INLF | 2.00 | 1,184.00 | 1.10 | 651.20 | 1.00 | 592.00 | 1.00 | 592.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,310,373.23 | | 3,570,139.83 | | 3,648,738.43 | | 3,827,980.89 |
|