Proposal:H.016154.6
Parish:Bienville, De Soto, Red River
Routes:LA 177, LA 4, US 371
Description:DISTRICT 04 OVERLAYS: SOUTHERN PARISHES
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,380,805.67
| Rank | License | Bidder | Construction Bid |
| 1 | 08584 | Madden Contracting Co., LLC | $2,649,966.91 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Contracting Co., LLC | | Unit Price | Total Amount | | 0001 | 203-07-00100 | Borrow (Vehicular Measurement) | 452 | CUYD | 51.50 | 23,278.00 | | 0002 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4 | CUYD | 63.00 | 252.00 | | 0003 | 502-01-00100 | Asphalt Concrete | 8,914 | TON | 156.25 | 1,392,812.50 | | 0004 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 175.6 | TON | 110.50 | 19,403.80 | | 0005 | 509-01-00100 | Milling Asphalt Pavement | 61,499 | SQYD | 4.90 | 301,345.10 | | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,537 | CUYD | 0.10 | -253.70 | | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,050 | SQYD | 195.00 | 204,750.00 | | 0008 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 936 | LNFT | 19.72 | 18,457.92 | | 0009 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 480 | LNFT | 19.72 | 9,465.60 | | 0010 | 602-10-00100 | Longitudinal Shoulder Joints | 404 | LNFT | 10.21 | 4,124.84 | | 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 247,000.00 | 247,000.00 | | 0012 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.29 | MILE | 300.00 | 3,087.00 | | 0013 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.081 | MILE | 600.00 | 1,248.60 | | 0014 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 18.47 | MILE | 1,100.00 | 20,317.00 | | 0015 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 50.00 | 300.00 | | 0016 | 716-01-00100 | Mulch (Vegetative) | 3.4 | TON | 1,500.00 | 5,100.00 | | 0017 | 717-01-00100 | Seeding | 76 | LB | 25.00 | 1,900.00 | | 0018 | 718-01-00100 | Fertilizer | 1,680 | LB | 1.00 | 1,680.00 | | 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 247,000.00 | 247,000.00 | | 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,249 | EACH | 5.00 | 6,245.00 | | 0021 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 759 | LNFT | 3.25 | 2,466.75 | | 0022 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 143 | LNFT | 13.00 | 1,859.00 | | 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 18.47 | MILE | 5,500.00 | 101,585.00 | | 0024 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.081 | MILE | 2,500.00 | 5,202.50 | | 0025 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 6 | EACH | 1,000.00 | 6,000.00 | | 0026 | 732-05-00100 | Removal of Existing Markings | 0.181 | MILE | 10,000.00 | 1,810.00 | | 0027 | 732-05-00100 | Removal of Existing Markings Beginning of project concrete section. | 0.101 | MILE | 10,000.00 | 1,010.00 | | 0028 | 735-01-00100 | Mailboxes | 6 | EACH | 20.00 | 120.00 | | 0029 | 735-02-00100 | Mailbox Supports (Single) | 6 | EACH | 400.00 | 2,400.00 | | 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,649,966.91 |
|