Proposal:H.016075.6
Parish:East Baton Rouge
Routes:I-10
Description:I-10: WASHINGTON STREET EB EXIT RAMP CL
Type Construction:PLASTIC PAVEMENT STRIPING, SIGNAGE, CONCRETE BARRIERS, AND RELATED WORK.
Estimated Construction Cost:$574,520.00
| Rank | License | Bidder | Construction Bid |
| 1 | 50550 | Traffic Control Prod. Co of LA Inc. | $311,025.15 |
| 2 | 67594 | Traffic Commander, LLC | $328,105.00 |
| 3 | 74077 | TLP Construction Co. LLC | $399,118.85 |
| 4 | 64826 | Highway Safety Systems LLC | $460,856.03 |
| 5 | 46747 | Triumph Construction, LLC | $525,253.39 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Traffic Control Prod. Co of LA Inc. | - 2 - Traffic Commander, LLC | - 3 - TLP Construction Co. LLC | - 4 - Highway Safety Systems LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-18000 | Removal of Impact Attenuator | 1 | EACH | 2,500.00 | 2,500.00 | 4,750.00 | 4,750.00 | 1,500.00 | 1,500.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-38300 | Removal of Sign and U-Channel Post | 4 | EACH | 10.00 | 40.00 | 10.00 | 40.00 | 100.00 | 400.00 | 200.00 | 800.00 | | 0003 | 202-02-38360 | Removal of Sign Faces | 11 | EACH | 25.00 | 275.00 | 250.00 | 2,750.00 | 1,000.00 | 11,000.00 | 70.00 | 770.00 | | 0004 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 15,000.00 | 15,000.00 | 17,500.00 | 17,500.00 | 7,500.00 | 7,500.00 | 26,000.00 | 26,000.00 | | 0005 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 74,320.00 | 74,320.00 | | 0006 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 24 | EACH | 1,950.00 | 46,800.00 | 2,200.00 | 52,800.00 | 2,950.00 | 70,800.00 | 2,160.00 | 51,840.00 | | 0007 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 46,000.00 | 46,000.00 | | 0008 | 729-01-00100 | Sign (Type A) | 125 | SQFT | 38.00 | 4,750.00 | 40.00 | 5,000.00 | 50.00 | 6,250.00 | 35.00 | 4,375.00 | | 0009 | 729-06-00100 | Sign (Overhead Mounted) | 108 | SQFT | 60.00 | 6,480.00 | 100.00 | 10,800.00 | 125.00 | 13,500.00 | 115.00 | 12,420.00 | | 0010 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 4 | EACH | 6,800.00 | 27,200.00 | 5,500.00 | 22,000.00 | 15,000.00 | 60,000.00 | 5,010.00 | 20,040.00 | | 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | 987 | EACH | 4.10 | 4,046.70 | 7.00 | 6,909.00 | 4.50 | 4,441.50 | 7.01 | 6,914.03 | | 0012 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,578 | LNFT | 9.90 | 15,622.20 | 10.00 | 15,780.00 | 10.00 | 15,780.00 | 14.00 | 22,092.00 | | 0013 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 11.00 | 264.00 | 11.00 | 264.00 | 11.00 | 264.00 | 19.00 | 456.00 | | 0014 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.604 | MILE | 4,400.00 | 7,057.60 | 5,000.00 | 8,020.00 | 4,500.00 | 7,218.00 | 5,198.88 | 8,339.00 | | 0015 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.084 | MILE | 11,000.00 | 924.00 | 14,000.00 | 1,176.00 | 12,000.00 | 1,008.00 | 12,071.43 | 1,014.00 | | 0016 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.341 | MILE | 3,850.00 | 1,312.85 | 4,000.00 | 1,364.00 | 3,850.00 | 1,312.85 | 4,199.41 | 1,432.00 | | 0017 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 0.705 | MILE | 11,000.00 | 7,755.00 | 12,000.00 | 8,460.00 | 11,000.00 | 7,755.00 | 11,998.58 | 8,459.00 | | 0018 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 275.00 | 275.00 | 300.00 | 300.00 | 500.00 | 500.00 | 350.00 | 350.00 | | 0019 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 275.00 | 550.00 | 300.00 | 600.00 | 500.00 | 1,000.00 | 350.00 | 700.00 | | 0020 | 732-05-00100 | Removal of Existing Markings | 1.166 | MILE | 3,300.00 | 3,847.80 | 2,000.00 | 2,332.00 | 3,250.00 | 3,789.50 | 3,799.31 | 4,430.00 | | 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 60,000.00 | 60,000.00 | | 0022 | NS-700-00860 | Impact Attenuator (Low Maintenance, Test Level 3) | 1 | EACH | 37,500.00 | 37,500.00 | 27,500.00 | 27,500.00 | 35,000.00 | 35,000.00 | 39,625.00 | 39,625.00 | | 0023 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 4 | EACH | 3,500.00 | 14,000.00 | 1,000.00 | 4,000.00 | 500.00 | 2,000.00 | 3,000.00 | 12,000.00 | | 0024 | NS-713-00014 | Sequential Flashing Warning Lights | 1 | EACH | 3,000.00 | 3,000.00 | 30,000.00 | 30,000.00 | 1,500.00 | 1,500.00 | 2,660.00 | 2,660.00 | | 0025 | NS-729-00031 | Breakaway Square Tubing Sign Support (Surface Mount) | 6 | EACH | 450.00 | 2,700.00 | 400.00 | 2,400.00 | 1,000.00 | 6,000.00 | 400.00 | 2,400.00 | | 0026 | NS-732-00003 | Debris Removal and Sweeping | 1 | LUMP | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 22,000.00 | 22,000.00 | | 0027 | NS-744-00600 | Lane Separator System (Furnish and Install) | 153 | LNFT | 125.00 | 19,125.00 | 120.00 | 18,360.00 | 200.00 | 30,600.00 | 140.00 | 21,420.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 311,025.15 | | 328,105.00 | | 399,118.85 | | 460,856.03 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Triumph Construction, LLC | | Unit Price | Total Amount | | 0001 | 202-02-18000 | Removal of Impact Attenuator | 1 | EACH | 46,350.00 | 46,350.00 | | 0002 | 202-02-38300 | Removal of Sign and U-Channel Post | 4 | EACH | 218.00 | 872.00 | | 0003 | 202-02-38360 | Removal of Sign Faces | 11 | EACH | 155.00 | 1,705.00 | | 0004 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 61,800.00 | 61,800.00 | | 0005 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,190.00 | 35,190.00 | | 0006 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 24 | EACH | 2,284.00 | 54,816.00 | | 0007 | 727-01-00100 | Mobilization | 1 | LUMP | 86,830.00 | 86,830.00 | | 0008 | 729-01-00100 | Sign (Type A) | 125 | SQFT | 44.00 | 5,500.00 | | 0009 | 729-06-00100 | Sign (Overhead Mounted) | 108 | SQFT | 69.00 | 7,452.00 | | 0010 | 729-08-00310 | Mounting (5" Size Post)(Structure Mount) | 4 | EACH | 558.00 | 2,232.00 | | 0011 | 731-02-00100 | Reflectorized Raised Pavement Markers | 987 | EACH | 6.00 | 5,922.00 | | 0012 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,578 | LNFT | 12.00 | 18,936.00 | | 0013 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 49.00 | 1,176.00 | | 0014 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.604 | MILE | 4,951.00 | 7,941.40 | | 0015 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.084 | MILE | 13,691.00 | 1,150.04 | | 0016 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.341 | MILE | 4,341.00 | 1,480.28 | | 0017 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 0.705 | MILE | 12,369.00 | 8,720.15 | | 0018 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 1,180.00 | 1,180.00 | | 0019 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 745.00 | 1,490.00 | | 0020 | 732-05-00100 | Removal of Existing Markings | 1.166 | MILE | 3,714.00 | 4,330.52 | | 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 9,270.00 | 9,270.00 | | 0022 | NS-700-00860 | Impact Attenuator (Low Maintenance, Test Level 3) | 1 | EACH | 18,540.00 | 18,540.00 | | 0023 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 4 | EACH | 29,688.00 | 118,752.00 | | 0024 | NS-713-00014 | Sequential Flashing Warning Lights | 1 | EACH | 3,710.00 | 3,710.00 | | 0025 | NS-729-00031 | Breakaway Square Tubing Sign Support (Surface Mount) | 6 | EACH | 557.00 | 3,342.00 | | 0026 | NS-732-00003 | Debris Removal and Sweeping | 1 | LUMP | 16,260.00 | 16,260.00 | | 0027 | NS-744-00600 | Lane Separator System (Furnish and Install) | 153 | LNFT | 2.00 | 306.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 525,253.39 |
|