Proposal:H.015324.6
Parish:Lincoln
Routes:LA 821
Description:LA 821: LA 820 - LA 145
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, BORROW, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,585,271.50
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,366,081.92 |
| 2 | 12312 | Gilchrist Construction Company, LLC | $3,585,107.40 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $4,408,333.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Gilchrist Construction Company, LLC | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 2.737 | LUMP | 40,000.00 | 40,000.00 | 150,000.00 | 150,000.00 | 60,000.00 | 60,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions (RETAINING WALL) | 1 | LUMP | 5,100.00 | 5,100.00 | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (42" CMP) | 60 | LNFT | 22.00 | 1,320.00 | 41.00 | 2,460.00 | 100.00 | 6,000.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,312 | CUYD | 95.00 | 124,640.00 | 40.00 | 52,480.00 | 55.00 | 72,160.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 218 | LNFT | 10.00 | 2,180.00 | 6.00 | 1,308.00 | 8.00 | 1,744.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,542 | CUYD | 140.00 | 215,880.00 | 120.00 | 185,040.00 | 225.00 | 346,950.00 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 25.9 | CUYD | 85.00 | 2,201.50 | 100.00 | 2,590.00 | 225.00 | 5,827.50 | | 0008 | 502-01-00100 | Asphalt Concrete | 9,565.3 | TON | 155.00 | 1,482,621.50 | 165.00 | 1,578,274.50 | 195.00 | 1,865,233.50 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 789.5 | TON | 265.00 | 209,217.50 | 165.00 | 130,267.50 | 255.00 | 201,322.50 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 2,075 | SQYD | 22.00 | 45,650.00 | 18.00 | 37,350.00 | 15.00 | 31,125.00 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -76 | CUYD | 1.00 | -76.00 | 1.00 | -76.00 | 1.00 | -76.00 | | 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 4,398 | SQYD | 160.00 | 703,680.00 | 180.00 | 791,640.00 | 200.00 | 879,600.00 | | 0013 | 701-01-02084 | Cross Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW or 42" CMP) | 64 | LNFT | 415.00 | 26,560.00 | 370.00 | 23,680.00 | 500.00 | 32,000.00 | | 0014 | 701-08-00100 | Relaying Pipe (24" RCP) | 16 | LNFT | 255.00 | 4,080.00 | 260.00 | 4,160.00 | 400.00 | 6,400.00 | | 0015 | 701-15-00100 | Concrete Collar | 4 | EACH | 2,250.00 | 9,000.00 | 2,600.00 | 10,400.00 | 1,600.00 | 6,400.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 72 | LNFT | 10.00 | 720.00 | 10.00 | 720.00 | 5.00 | 360.00 | | 0017 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 90 | SQYD | 190.00 | 17,100.00 | 170.00 | 15,300.00 | 165.00 | 14,850.00 | | 0018 | 711-04-00100 | Geotextile Fabric | 90 | SQYD | 7.00 | 630.00 | 2.00 | 180.00 | 5.00 | 450.00 | | 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 62,000.00 | 62,000.00 | 65,000.00 | 65,000.00 | 225,000.00 | 225,000.00 | | 0020 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 308 | LNFT | 0.25 | 77.00 | 1.00 | 308.00 | 1.50 | 462.00 | | 0021 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 194 | LNFT | 1.00 | 194.00 | 1.00 | 194.00 | 2.00 | 388.00 | | 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.424 | MILE | 154.00 | 1,143.30 | 250.00 | 1,856.00 | 250.00 | 1,856.00 | | 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.018 | MILE | 715.00 | 1,442.87 | 600.00 | 1,210.80 | 800.00 | 1,614.40 | | 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 26.97 | MILE | 900.00 | 24,273.00 | 950.00 | 25,621.50 | 900.00 | 24,273.00 | | 0025 | 716-01-00100 | Mulch (Vegetative) | 5.6 | TON | 900.00 | 5,040.00 | 1,000.00 | 5,600.00 | 900.00 | 5,040.00 | | 0026 | 717-01-00100 | Seeding | 168 | LB | 15.00 | 2,520.00 | 20.00 | 3,360.00 | 18.00 | 3,024.00 | | 0027 | 718-01-00100 | Fertilizer | 2,804 | LB | 0.75 | 2,103.00 | 0.80 | 2,243.20 | 1.00 | 2,804.00 | | 0028 | 726-01-00100 | Bedding Material | 41.7 | CUYD | 180.00 | 7,506.00 | 170.00 | 7,089.00 | 200.00 | 8,340.00 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 265,000.00 | 265,000.00 | 350,000.00 | 350,000.00 | 425,000.00 | 425,000.00 | | 0030 | 729-16-00200 | Object Marker Assembly (Type 2) | 20 | EACH | 65.00 | 1,300.00 | 115.00 | 2,300.00 | 100.00 | 2,000.00 | | 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 847 | EACH | 5.00 | 4,235.00 | 6.00 | 5,082.00 | 7.00 | 5,929.00 | | 0032 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 154 | LNFT | 4.00 | 616.00 | 3.00 | 462.00 | 15.00 | 2,310.00 | | 0033 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 97 | LNFT | 10.00 | 970.00 | 9.00 | 873.00 | 20.00 | 1,940.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 13.485 | MILE | 4,200.00 | 56,637.00 | 5,500.00 | 74,167.50 | 6,500.00 | 87,652.50 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.009 | MILE | 1,250.00 | 1,261.25 | 2,600.00 | 2,623.40 | 1,600.00 | 1,614.40 | | 0036 | 732-04-25020 | Plastic Pavement Legends and Symbols (Yield Line) | 1 | EACH | 500.00 | 500.00 | 825.00 | 825.00 | 800.00 | 800.00 | | 0037 | 735-01-00100 | Mailboxes | 39 | EACH | 1.00 | 39.00 | 30.00 | 1,170.00 | 40.00 | 1,560.00 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 29 | EACH | 330.00 | 9,570.00 | 252.00 | 7,308.00 | 320.00 | 9,280.00 | | 0039 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 330.00 | 1,650.00 | 308.00 | 1,540.00 | 420.00 | 2,100.00 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 21,500.00 | 21,500.00 | 28,000.00 | 28,000.00 | 50,000.00 | 50,000.00 | | 0041 | NS-201-00023 | Stump Removal (Over 48" Diameter) | 1 | EACH | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,366,081.92 | | 3,585,107.40 | | 4,408,333.80 |
|