Proposal:H.014769.6
Parish:Lafourche
Routes:LA 3161
Description:LA 3161: HWY 3235 - W MAIN ST
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$1,067,796.90
| Rank | License | Bidder | Construction Bid |
| 1 | 73475 | Madden Gulf Coast, LLC | $936,651.95 |
| 2 | 62139 | Huey P. Stockstill, LLC | $945,142.54 |
| 3 | 06276 | Barriere Construction Co., LLC | $958,778.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Gulf Coast, LLC | - 2 - Huey P. Stockstill, LLC | - 3 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 203-01-00100 | General Excavation | 239 | CUYD | 30.00 | 7,170.00 | 35.00 | 8,365.00 | 0.01 | 2.39 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 101 | CUYD | 132.00 | 13,332.00 | 40.00 | 4,040.00 | 0.01 | 1.01 | | 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 185 | CUYD | 183.00 | 33,855.00 | 172.00 | 31,820.00 | 203.00 | 37,555.00 | | 0004 | 502-01-00100 | Asphalt Concrete | 1,947.3 | TON | 130.00 | 253,149.00 | 150.00 | 292,095.00 | 144.00 | 280,411.20 | | 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 117.1 | TON | 220.00 | 25,762.00 | 285.00 | 33,373.50 | 300.00 | 35,130.00 | | 0006 | 509-01-00100 | Milling Asphalt Pavement | 17,105 | SQYD | 2.00 | 34,210.00 | 3.00 | 51,315.00 | 0.01 | 171.05 | | 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -950 | CUYD | 0.01 | -9.50 | 0.01 | -9.50 | 0.01 | -9.50 | | 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) ROADWAY | 100 | SQYD | 110.00 | 11,000.00 | 105.00 | 10,500.00 | 135.00 | 13,500.00 | | 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) SHOULDER | 2,900 | SQYD | 110.00 | 319,000.00 | 105.00 | 304,500.00 | 135.00 | 391,500.00 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 105,000.00 | 105,000.00 | 67,600.00 | 67,600.00 | 90,000.00 | 90,000.00 | | 0011 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 213 | LNFT | 0.35 | 74.55 | 0.35 | 74.55 | 0.35 | 74.55 | | 0012 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 66 | LNFT | 1.00 | 66.00 | 1.00 | 66.00 | 1.00 | 66.00 | | 0013 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.422 | MILE | 400.00 | 568.80 | 295.00 | 419.49 | 1,800.00 | 2,559.60 | | 0014 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.422 | MILE | 750.00 | 1,066.50 | 750.00 | 1,066.50 | 800.00 | 1,137.60 | | 0015 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.324 | MILE | 950.00 | 3,157.80 | 950.00 | 3,157.80 | 800.00 | 2,659.20 | | 0016 | 717-01-00100 | Seeding | 15 | LB | 50.00 | 750.00 | 12.00 | 180.00 | 13.00 | 195.00 | | 0017 | 718-01-00100 | Fertilizer | 516 | LB | 1.00 | 516.00 | 4.25 | 2,193.00 | 4.50 | 2,322.00 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 93,000.00 | 93,000.00 | 65,000.00 | 65,000.00 | | 0019 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 1,500.00 | 1,500.00 | 2,650.00 | 2,650.00 | 1,500.00 | 1,500.00 | | 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 140 | EACH | 6.50 | 910.00 | 6.50 | 910.00 | 7.00 | 980.00 | | 0021 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 213 | LNFT | 3.00 | 639.00 | 3.50 | 745.50 | 3.00 | 639.00 | | 0022 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 66 | LNFT | 10.00 | 660.00 | 11.25 | 742.50 | 10.50 | 693.00 | | 0023 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 32 | LNFT | 12.00 | 384.00 | 14.00 | 448.00 | 11.25 | 360.00 | | 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.662 | MILE | 4,500.00 | 7,479.00 | 4,850.00 | 8,060.70 | 4,250.00 | 7,063.50 | | 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.711 | MILE | 1,500.00 | 1,066.50 | 1,500.00 | 1,066.50 | 1,500.00 | 1,066.50 | | 0026 | 735-01-00100 | Mailboxes | 26 | EACH | 30.00 | 780.00 | 31.00 | 806.00 | 30.00 | 780.00 | | 0027 | 735-02-00100 | Mailbox Supports (Single) | 10 | EACH | 275.00 | 2,750.00 | 285.00 | 2,850.00 | 275.00 | 2,750.00 | | 0028 | 735-03-00100 | Mailbox Supports (Double) | 8 | EACH | 375.00 | 3,000.00 | 385.00 | 3,080.00 | 375.00 | 3,000.00 | | 0029 | 736-01-00100 | Trenching and Backfilling | 8 | LNFT | 12.57 | 100.56 | 14.00 | 112.00 | 12.60 | 100.80 | | 0030 | 736-09-00100 | Loop Detector | 323 | LNFT | 39.33 | 12,703.59 | 40.00 | 12,920.00 | 39.50 | 12,758.50 | | 0031 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 1,329.63 | 1,329.63 | 1,335.00 | 1,335.00 | 1,330.00 | 1,330.00 | | 0032 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 8 | LNFT | 9.47 | 75.76 | 10.00 | 80.00 | 9.50 | 76.00 | | 0033 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 8 | LNFT | 13.22 | 105.76 | 10.00 | 80.00 | 13.25 | 106.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,500.00 | 4,500.00 | 5,500.00 | 5,500.00 | 3,300.00 | 3,300.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 936,651.95 | | 945,142.54 | | 958,778.40 |
|