Proposal:H.013719.6
Parish:Orleans
Routes:US 61
Description:US 61 @ I-10 EB OFF RAMP PED IMPR (NO)
Type Construction:CLEARING AND GRUBBING, CONCRETE WALKS, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$570,299.50
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $647,836.52 |
| 2 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $674,413.00 |
| 3 | 34263 | LA Contracting Enterprise, L.L.C. | $729,515.00 |
| 4 | 46747 | Triumph Construction, LLC | $807,398.18 |
| 5 | 36961 | Cycle Construction Co. L.L.C. | $844,393.50 |
| 6 | 74839 | 21 Construction, L.L.C. | $1,258,513.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | - 2 - KORT's CONSTRUCTION SERVICES, INC. | - 3 - LA Contracting Enterprise, L.L.C. | - 4 - Triumph Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 14,740.00 | 14,740.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 4,500.00 | 4,500.00 | 14,740.00 | 14,740.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,211 | SQYD | 20.00 | 24,220.00 | 12.00 | 14,532.00 | 35.00 | 42,385.00 | 22.00 | 26,642.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 683 | LNFT | 5.00 | 3,415.00 | 12.00 | 8,196.00 | 19.00 | 12,977.00 | 13.00 | 8,879.00 | | 0005 | 202-02-38220 | Removal of Sign Supports | 7 | EACH | 50.00 | 350.00 | 280.00 | 1,960.00 | 118.00 | 826.00 | 309.00 | 2,163.00 | | 0006 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 2,500.00 | 2,500.00 | 50,000.00 | 50,000.00 | 5,000.00 | 5,000.00 | 5,110.00 | 5,110.00 | | 0007 | 202-03-38000 | Relocation of Sign | 5 | EACH | 100.00 | 500.00 | 190.00 | 950.00 | 59.00 | 295.00 | 232.00 | 1,160.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | 6,700.00 | 6,700.00 | 36,000.00 | 36,000.00 | 39,290.00 | 39,290.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 49 | EACH | 0.01 | 0.49 | 40.00 | 1,960.00 | 35.00 | 1,715.00 | 18.00 | 882.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,403 | LNFT | 0.01 | 14.03 | 2.00 | 2,806.00 | 2.50 | 3,507.50 | 3.00 | 4,209.00 | | 0011 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | 2 | EACH | 6,500.00 | 13,000.00 | 4,000.00 | 8,000.00 | 2,800.00 | 5,600.00 | 1,460.00 | 2,920.00 | | 0012 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 1,500.00 | 7,500.00 | 2,250.00 | 11,250.00 | 1,400.00 | 7,000.00 | 1,520.00 | 7,600.00 | | 0013 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 1,500.00 | 1,500.00 | 2,250.00 | 2,250.00 | 4,000.00 | 4,000.00 | 920.00 | 920.00 | | 0014 | 702-04-00300 | Adjusting Junction Boxes | 3 | EACH | 4,000.00 | 12,000.00 | 3,900.00 | 11,700.00 | 2,000.00 | 6,000.00 | 914.00 | 2,742.00 | | 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 729.4 | SQYD | 70.00 | 51,058.00 | 90.00 | 65,646.00 | 116.00 | 84,610.40 | 93.00 | 67,834.20 | | 0016 | 706-01-00300 | Concrete Walk (6" Thick) | 93 | SQYD | 75.00 | 6,975.00 | 110.00 | 10,230.00 | 136.00 | 12,648.00 | 110.00 | 10,230.00 | | 0017 | 706-02-00300 | Concrete Drive (8" Thick) | 484.7 | SQYD | 100.00 | 48,470.00 | 120.00 | 58,164.00 | 116.00 | 56,225.20 | 143.00 | 69,312.10 | | 0018 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 53.1 | SQYD | 75.00 | 3,982.50 | 88.00 | 4,672.80 | 116.00 | 6,159.60 | 110.00 | 5,841.00 | | 0019 | 706-04-00110 | Curb Ramps (Type 1) | 51.2 | SQYD | 175.00 | 8,960.00 | 135.00 | 6,912.00 | 267.00 | 13,670.40 | 165.00 | 8,448.00 | | 0020 | 706-04-00110 | Curb Ramps (Type 5) | 19.1 | SQYD | 175.00 | 3,342.50 | 130.00 | 2,483.00 | 235.00 | 4,488.50 | 187.00 | 3,571.70 | | 0021 | 706-04-00110 | Curb Ramps (TYPE 6) | 27.4 | SQYD | 175.00 | 4,795.00 | 130.00 | 3,562.00 | 250.00 | 6,850.00 | 187.00 | 5,123.80 | | 0022 | 706-04-00110 | Curb Ramps (TYPE 7) | 53.2 | SQYD | 175.00 | 9,310.00 | 145.00 | 7,714.00 | 256.00 | 13,619.20 | 187.00 | 9,948.40 | | 0023 | 707-01-00100 | Concrete Curb | 560 | LNFT | 25.00 | 14,000.00 | 20.00 | 11,200.00 | 44.00 | 24,640.00 | 44.00 | 24,640.00 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 65,000.00 | 65,000.00 | 35,000.00 | 35,000.00 | 17,120.00 | 17,120.00 | | 0025 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 424 | SQYD | 10.00 | 4,240.00 | 11.00 | 4,664.00 | 20.00 | 8,480.00 | 12.00 | 5,088.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | 68,500.00 | 68,500.00 | 184,790.00 | 184,790.00 | | 0027 | 729-01-00100 | Sign (Type A) | 6.3 | SQFT | 50.00 | 315.00 | 44.00 | 277.20 | 24.00 | 151.20 | 83.00 | 522.90 | | 0028 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 3 | EACH | 300.00 | 900.00 | 185.00 | 555.00 | 178.00 | 534.00 | 267.00 | 801.00 | | 0029 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 354 | LNFT | 20.00 | 7,080.00 | 25.00 | 8,850.00 | 8.00 | 2,832.00 | 13.00 | 4,602.00 | | 0030 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 93 | LNFT | 25.00 | 2,325.00 | 30.00 | 2,790.00 | 26.00 | 2,418.00 | 44.00 | 4,092.00 | | 0031 | 736-01-00100 | Trenching and Backfilling | 213 | LNFT | 25.00 | 5,325.00 | 11.00 | 2,343.00 | 30.00 | 6,390.00 | 32.00 | 6,816.00 | | 0032 | 736-03-00100 | Jacking or Boring | 401 | LNFT | 60.00 | 24,060.00 | 42.00 | 16,842.00 | 54.00 | 21,654.00 | 54.00 | 21,654.00 | | 0033 | 736-04-00001 | Signal Pole (Pedestal Pole) | 6 | EACH | 2,250.00 | 13,500.00 | 1,300.00 | 7,800.00 | 2,220.00 | 13,320.00 | 2,299.00 | 13,794.00 | | 0034 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 13 | EACH | 1,500.00 | 19,500.00 | 1,000.00 | 13,000.00 | 1,850.00 | 24,050.00 | 1,827.00 | 23,751.00 | | 0035 | 736-05-30001 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) (Arrow Up) | 1 | EACH | 1,500.00 | 1,500.00 | 1,100.00 | 1,100.00 | 1,800.00 | 1,800.00 | 1,830.00 | 1,830.00 | | 0036 | 736-05-30002 | Signal Heads (3 Section, 12 inch Optically Programmed Lens, R, Y, G) | 3 | EACH | 7,000.00 | 21,000.00 | 6,000.00 | 18,000.00 | 8,400.00 | 25,200.00 | 8,227.00 | 24,681.00 | | 0037 | 736-05-55001 | Signal Heads (5 Section, 12" Optically Programmed Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 10,000.00 | 10,000.00 | 1,700.00 | 1,700.00 | 12,200.00 | 12,200.00 | 12,500.00 | 12,500.00 | | 0038 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 2,000.00 | 2,000.00 | 1,500.00 | 1,500.00 | 1,800.00 | 1,800.00 | 1,810.00 | 1,810.00 | | 0039 | 736-10-00300 | Underground Junction Box (Type F) | 7 | EACH | 2,000.00 | 14,000.00 | 1,600.00 | 11,200.00 | 1,900.00 | 13,300.00 | 1,973.00 | 13,811.00 | | 0040 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 3,000.00 | 3,000.00 | 3,400.00 | 3,400.00 | 3,100.00 | 3,100.00 | 3,200.00 | 3,200.00 | | 0041 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 734 | LNFT | 14.00 | 10,276.00 | 25.00 | 18,350.00 | 18.00 | 13,212.00 | 18.00 | 13,212.00 | | 0042 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 432 | LNFT | 5.00 | 2,160.00 | 6.00 | 2,592.00 | 6.00 | 2,592.00 | 7.00 | 3,024.00 | | 0043 | 736-12-02014 | Conductor (2c, #14 awg) | 1,381 | LNFT | 5.00 | 6,905.00 | 3.00 | 4,143.00 | 6.00 | 8,286.00 | 7.00 | 9,667.00 | | 0044 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 50 | LNFT | 15.00 | 750.00 | 12.00 | 600.00 | 16.00 | 800.00 | 17.00 | 850.00 | | 0045 | 736-12-06014 | Conductor (6c, #14 awg) | 2,332 | LNFT | 6.00 | 13,992.00 | 5.00 | 11,660.00 | 8.00 | 18,656.00 | 8.00 | 18,656.00 | | 0046 | 736-12-10014 | Conductor (10c, #14 awg) | 1,402 | LNFT | 8.00 | 11,216.00 | 7.50 | 10,515.00 | 9.50 | 13,319.00 | 10.00 | 14,020.00 | | 0047 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 6 | EACH | 2,500.00 | 15,000.00 | 4,300.00 | 25,800.00 | 2,550.00 | 15,300.00 | 2,455.00 | 14,730.00 | | 0048 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 8 | EACH | 1,200.00 | 9,600.00 | 950.00 | 7,600.00 | 1,365.00 | 10,920.00 | 1,405.00 | 11,240.00 | | 0049 | 739-01-00100 | Hydro-Seeding | 0.32 | ACRE | 5,000.00 | 1,600.00 | 6,200.00 | 1,984.00 | 5,700.00 | 1,824.00 | 6,594.00 | 2,110.08 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 9,830.00 | 9,830.00 | | 0051 | 815-01-00300 | Unsealed Expansion Joint (COVER DETAIL) | 6 | LNFT | 1,000.00 | 6,000.00 | 485.00 | 2,910.00 | 390.00 | 2,340.00 | 244.00 | 1,464.00 | | 0052 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 4 | EACH | 300.00 | 1,200.00 | 1,400.00 | 5,600.00 | 1,330.00 | 5,320.00 | 1,418.00 | 5,672.00 | | 0053 | NS-719-00002 | Tree Trimming | 1 | LUMP | 1,000.00 | 1,000.00 | 900.00 | 900.00 | 1,000.00 | 1,000.00 | 1,830.00 | 1,830.00 | | 0054 | NS-729-00031 | Breakaway Square Tubing Sign Support (Surface Mount) | 2 | EACH | 750.00 | 1,500.00 | 475.00 | 950.00 | 600.00 | 1,200.00 | 670.00 | 1,340.00 | | 0055 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 8 | EACH | 1,500.00 | 12,000.00 | 1,800.00 | 14,400.00 | 1,850.00 | 14,800.00 | 1,903.00 | 15,224.00 | | 0056 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 1 | EACH | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | 6,500.00 | 6,500.00 | 6,720.00 | 6,720.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 647,836.52 | | 674,413.00 | | 729,515.00 | | 807,398.18 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Cycle Construction Co. L.L.C. | - 6 - 21 Construction, L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 11,450.00 | 11,450.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 354.00 | 354.00 | 50,000.00 | 50,000.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,211 | SQYD | 33.00 | 39,963.00 | 50.00 | 60,550.00 | | 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 683 | LNFT | 10.50 | 7,171.50 | 25.00 | 17,075.00 | | 0005 | 202-02-38220 | Removal of Sign Supports | 7 | EACH | 70.00 | 490.00 | 1,000.00 | 7,000.00 | | 0006 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 4,860.00 | 4,860.00 | 50,000.00 | 50,000.00 | | 0007 | 202-03-38000 | Relocation of Sign | 5 | EACH | 93.00 | 465.00 | 1,000.00 | 5,000.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 13,000.00 | 13,000.00 | 50,000.00 | 50,000.00 | | 0009 | 204-02-00100 | Temporary Hay Bales | 49 | EACH | 44.00 | 2,156.00 | 10.00 | 490.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,403 | LNFT | 3.00 | 4,209.00 | 3.00 | 4,209.00 | | 0011 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | 2 | EACH | 7,540.00 | 15,080.00 | 8,500.00 | 17,000.00 | | 0012 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 1,700.00 | 8,500.00 | 2,000.00 | 10,000.00 | | 0013 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 1,800.00 | 1,800.00 | 5,000.00 | 5,000.00 | | 0014 | 702-04-00300 | Adjusting Junction Boxes | 3 | EACH | 4,500.00 | 13,500.00 | 5,000.00 | 15,000.00 | | 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 729.4 | SQYD | 100.00 | 72,940.00 | 175.00 | 127,645.00 | | 0016 | 706-01-00300 | Concrete Walk (6" Thick) | 93 | SQYD | 110.00 | 10,230.00 | 200.00 | 18,600.00 | | 0017 | 706-02-00300 | Concrete Drive (8" Thick) | 484.7 | SQYD | 145.00 | 70,281.50 | 205.00 | 99,363.50 | | 0018 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 53.1 | SQYD | 134.00 | 7,115.40 | 250.00 | 13,275.00 | | 0019 | 706-04-00110 | Curb Ramps (Type 1) | 51.2 | SQYD | 320.00 | 16,384.00 | 475.00 | 24,320.00 | | 0020 | 706-04-00110 | Curb Ramps (Type 5) | 19.1 | SQYD | 320.00 | 6,112.00 | 475.00 | 9,072.50 | | 0021 | 706-04-00110 | Curb Ramps (TYPE 6) | 27.4 | SQYD | 320.00 | 8,768.00 | 475.00 | 13,015.00 | | 0022 | 706-04-00110 | Curb Ramps (TYPE 7) | 53.2 | SQYD | 320.00 | 17,024.00 | 475.00 | 25,270.00 | | 0023 | 707-01-00100 | Concrete Curb | 560 | LNFT | 64.00 | 35,840.00 | 90.00 | 50,400.00 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,300.00 | 45,300.00 | 125,000.00 | 125,000.00 | | 0025 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 424 | SQYD | 28.00 | 11,872.00 | 10.00 | 4,240.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 157,500.00 | 157,500.00 | 100,000.00 | 100,000.00 | | 0027 | 729-01-00100 | Sign (Type A) | 6.3 | SQFT | 17.00 | 107.10 | 50.00 | 315.00 | | 0028 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 3 | EACH | 290.00 | 870.00 | 300.00 | 900.00 | | 0029 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 354 | LNFT | 9.00 | 3,186.00 | 25.00 | 8,850.00 | | 0030 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 93 | LNFT | 26.00 | 2,418.00 | 50.00 | 4,650.00 | | 0031 | 736-01-00100 | Trenching and Backfilling | 213 | LNFT | 30.00 | 6,390.00 | 11.00 | 2,343.00 | | 0032 | 736-03-00100 | Jacking or Boring | 401 | LNFT | 51.00 | 20,451.00 | 40.00 | 16,040.00 | | 0033 | 736-04-00001 | Signal Pole (Pedestal Pole) | 6 | EACH | 2,200.00 | 13,200.00 | 1,300.00 | 7,800.00 | | 0034 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 13 | EACH | 1,750.00 | 22,750.00 | 1,700.00 | 22,100.00 | | 0035 | 736-05-30001 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) (Arrow Up) | 1 | EACH | 1,750.00 | 1,750.00 | 1,100.00 | 1,100.00 | | 0036 | 736-05-30002 | Signal Heads (3 Section, 12 inch Optically Programmed Lens, R, Y, G) | 3 | EACH | 7,900.00 | 23,700.00 | 8,000.00 | 24,000.00 | | 0037 | 736-05-55001 | Signal Heads (5 Section, 12" Optically Programmed Lens, R, Y, RT. Y, G, RT. G) | 1 | EACH | 12,000.00 | 12,000.00 | 1,800.00 | 1,800.00 | | 0038 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 1,722.00 | 1,722.00 | 2,000.00 | 2,000.00 | | 0039 | 736-10-00300 | Underground Junction Box (Type F) | 7 | EACH | 1,884.00 | 13,188.00 | 1,650.00 | 11,550.00 | | 0040 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 3,055.00 | 3,055.00 | 4,000.00 | 4,000.00 | | 0041 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 734 | LNFT | 16.00 | 11,744.00 | 28.00 | 20,552.00 | | 0042 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 432 | LNFT | 6.00 | 2,592.00 | 8.00 | 3,456.00 | | 0043 | 736-12-02014 | Conductor (2c, #14 awg) | 1,381 | LNFT | 6.00 | 8,286.00 | 6.00 | 8,286.00 | | 0044 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 50 | LNFT | 16.00 | 800.00 | 17.00 | 850.00 | | 0045 | 736-12-06014 | Conductor (6c, #14 awg) | 2,332 | LNFT | 7.50 | 17,490.00 | 7.00 | 16,324.00 | | 0046 | 736-12-10014 | Conductor (10c, #14 awg) | 1,402 | LNFT | 10.00 | 14,020.00 | 11.00 | 15,422.00 | | 0047 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 6 | EACH | 2,350.00 | 14,100.00 | 7,500.00 | 45,000.00 | | 0048 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 8 | EACH | 1,350.00 | 10,800.00 | 1,100.00 | 8,800.00 | | 0049 | 739-01-00100 | Hydro-Seeding | 0.32 | ACRE | 10,800.00 | 3,456.00 | 10,000.00 | 3,200.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,650.00 | 22,650.00 | 30,000.00 | 30,000.00 | | 0051 | 815-01-00300 | Unsealed Expansion Joint (COVER DETAIL) | 6 | LNFT | 656.00 | 3,936.00 | 825.00 | 4,950.00 | | 0052 | NS-201-00001 | Tree and Stump Removal (<= 36" Diameter) | 4 | EACH | 1,305.00 | 5,220.00 | 2,200.00 | 8,800.00 | | 0053 | NS-719-00002 | Tree Trimming | 1 | LUMP | 987.00 | 987.00 | 2,500.00 | 2,500.00 | | 0054 | NS-729-00031 | Breakaway Square Tubing Sign Support (Surface Mount) | 2 | EACH | 580.00 | 1,160.00 | 700.00 | 1,400.00 | | 0055 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 8 | EACH | 1,700.00 | 13,600.00 | 2,500.00 | 20,000.00 | | 0056 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 1 | EACH | 6,400.00 | 6,400.00 | 10,000.00 | 10,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 844,393.50 | | 1,258,513.00 |
|