Proposal:H.013202.6
Parish:Caldwell
Routes:US 165
Description:US 165: LA 4 - UNION PACIFIC OVERPASS
Type Construction:BORROW, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$8,324,622.28
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $8,365,554.00 |
| 2 | 12312 | Gilchrist Construction Company, LLC | $8,627,874.84 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $11,513,448.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Gilchrist Construction Company, LLC | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 203-07-00100 | Borrow (Vehicular Measurement) | 5,020 | CUYD | 18.00 | 90,360.00 | 20.00 | 100,400.00 | 50.00 | 251,000.00 | | 0002 | 204-06-00100 | Temporary Silt Fencing | 147,840 | LNFT | 1.00 | 147,840.00 | 1.00 | 147,840.00 | 1.75 | 258,720.00 | | 0003 | 502-01-00100 | Asphalt Concrete | 38,441.5 | TON | 145.00 | 5,574,017.50 | 140.00 | 5,381,810.00 | 185.00 | 7,111,677.50 | | 0004 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,132.4 | TON | 265.00 | 300,086.00 | 140.00 | 158,536.00 | 285.00 | 322,734.00 | | 0005 | 509-01-00100 | Milling Asphalt Pavement | 349,010 | SQYD | 2.25 | 785,272.50 | 3.00 | 1,047,030.00 | 3.50 | 1,221,535.00 | | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,892 | CUYD | 1.00 | -4,892.00 | 1.00 | -4,892.00 | 1.00 | -4,892.00 | | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 115 | SQYD | 252.00 | 28,980.00 | 220.00 | 25,300.00 | 200.00 | 23,000.00 | | 0008 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 1,500 | SQYD | 215.00 | 322,500.00 | 250.00 | 375,000.00 | 350.00 | 525,000.00 | | 0009 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 9,552 | LNFT | 4.50 | 42,984.00 | 4.75 | 45,372.00 | 5.00 | 47,760.00 | | 0010 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 6,800.00 | 13,600.00 | 16,000.00 | 32,000.00 | 3,500.00 | 7,000.00 | | 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 266,000.00 | 266,000.00 | 97,000.00 | 97,000.00 | 450,000.00 | 450,000.00 | | 0012 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 6,542 | LNFT | 0.25 | 1,635.50 | 0.22 | 1,439.24 | 0.25 | 1,635.50 | | 0013 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14 | MILE | 154.00 | 2,156.00 | 200.00 | 2,800.00 | 250.00 | 3,500.00 | | 0014 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.496 | MILE | 600.00 | 8,697.60 | 650.00 | 9,422.40 | 800.00 | 11,596.80 | | 0015 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 29.274 | MILE | 900.00 | 26,346.60 | 900.00 | 26,346.60 | 1,100.00 | 32,201.40 | | 0016 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 14 | MILE | 1,000.00 | 14,000.00 | 1,100.00 | 15,400.00 | 500.00 | 7,000.00 | | 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 450,000.00 | 450,000.00 | 860,000.00 | 860,000.00 | 750,000.00 | 750,000.00 | | 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | 7,920 | EACH | 4.00 | 31,680.00 | 5.00 | 39,600.00 | 6.00 | 47,520.00 | | 0019 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 122 | LNFT | 9.00 | 1,098.00 | 9.00 | 1,098.00 | 22.00 | 2,684.00 | | 0020 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 28.512 | MILE | 4,900.00 | 139,708.80 | 5,000.00 | 142,560.00 | 7,000.00 | 199,584.00 | | 0021 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 1.239 | MILE | 12,500.00 | 15,487.50 | 12,000.00 | 14,868.00 | 18,000.00 | 22,302.00 | | 0022 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.457 | MILE | 9,000.00 | 4,113.00 | 11,000.00 | 5,027.00 | 10,000.00 | 4,570.00 | | 0023 | 732-03-02100 | Plastic Pavement Striping (Broken Line) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil) | 14 | MILE | 900.00 | 12,600.00 | 2,600.00 | 36,400.00 | 2,500.00 | 35,000.00 | | 0024 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 25 | EACH | 325.00 | 8,125.00 | 310.00 | 7,750.00 | 800.00 | 20,000.00 | | 0025 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 21 | EACH | 450.00 | 9,450.00 | 350.00 | 7,350.00 | 800.00 | 16,800.00 | | 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,500.00 | 35,500.00 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | | 0027 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 9,552 | LNFT | 4.00 | 38,208.00 | 1.30 | 12,417.60 | 10.00 | 95,520.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,365,554.00 | | 8,627,874.84 | | 11,513,448.20 |
|