Proposal:H.002176.6
Parish:St. Landry
Routes:LA 10
Description:LA 10 BRIDGES
Type Construction:CLEARING AND GRUBBING, REMOVAL OF PRECAST SLAB SPAN CONCRETE BRIDGES, GRADING, TREATED SUBGRADE LAYER, CLASS II BASE COURSE, DRAINAGE STRUCTURES, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, STEEL SHEETING, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGES, AND RELATED WORK.
Estimated Construction Cost:$11,332,506.59
| Rank | License | Bidder | Construction Bid |
| 1 | 55505 | MERRICK, LLC | $9,155,555.10 |
| 2 | 52306 | SIEMA CONSTRUCTION, LLC | $9,967,239.22 |
| 3 | 79463 | Denley Brown Contractors, LLC | $10,594,650.81 |
| 4 | 12312 | Gilchrist Construction Company, LLC | $10,687,170.25 |
| 5 | 44187 | RNGD Infrastructure LLC | $11,392,652.30 |
| 6 | 00009 | Coastal Contractors, LLC | $11,897,922.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - MERRICK, LLC | - 2 - SIEMA CONSTRUCTION, LLC | - 3 - Denley Brown Contractors, LLC | - 4 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4 | LUMP | 200,000.00 | 200,000.00 | 240,000.00 | 240,000.00 | 750,000.00 | 750,000.00 | 610,000.00 | 610,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 9,385.04 | 9,385.04 | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 55 | SQYD | 20.00 | 1,100.00 | 9.00 | 495.00 | 70.00 | 3,850.00 | 50.00 | 2,750.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 7,794.4 | SQYD | 8.00 | 62,355.20 | 9.25 | 72,098.20 | 10.00 | 77,944.00 | 15.00 | 116,916.00 | | 0005 | 202-02-04501 | Removal of Bridge REMOVAL OF BRIDGE - STR. NO. 03492190701931 (STA. 107+72.00; 28.4' X 209' CONCRETE PRECAST SLAB SPAN BRIDGE) | 5,936 | LUMP | 210,000.00 | 210,000.00 | 200,000.00 | 200,000.00 | 100,000.00 | 100,000.00 | 176,000.00 | 176,000.00 | | 0006 | 202-02-04501 | Removal of Bridge REMOVAL OF BRIDGE - STR. NO. 03492190702091 (STA. 116+20.00; 27.5' X 95' CONCRETE PRECAST SLAB SPAN BRIDGE) | 2,613 | LUMP | 50,000.00 | 50,000.00 | 145,000.00 | 145,000.00 | 90,000.00 | 90,000.00 | 85,000.00 | 85,000.00 | | 0007 | 202-02-04501 | Removal of Bridge REMOVAL OF BRIDGE - STR. NO. 03492190702901 (STA. 159+25.00; 28.4' X 76' CONCRETE PRECAST SLAB SPAN BRIDGE) | 2,158 | LUMP | 50,000.00 | 50,000.00 | 145,000.00 | 145,000.00 | 90,000.00 | 90,000.00 | 67,000.00 | 67,000.00 | | 0008 | 202-02-12000 | Removal of Fence | 758 | LNFT | 4.00 | 3,032.00 | 3.75 | 2,842.50 | 3.20 | 2,425.60 | 5.50 | 4,169.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 1,930.9 | LNFT | 10.00 | 19,309.00 | 7.15 | 13,805.94 | 6.50 | 12,550.85 | 7.00 | 13,516.30 | | 0010 | 203-01-00100 | General Excavation | 4,700 | CUYD | 11.00 | 51,700.00 | 17.50 | 82,250.00 | 20.00 | 94,000.00 | 23.00 | 108,100.00 | | 0011 | 203-02-00100 | Drainage Excavation | 1,258 | CUYD | 30.00 | 37,740.00 | 25.00 | 31,450.00 | 36.00 | 45,288.00 | 22.00 | 27,676.00 | | 0012 | 203-03-00100 | Embankment | 10,178 | CUYD | 27.00 | 274,806.00 | 38.00 | 386,764.00 | 49.00 | 498,722.00 | 46.00 | 468,188.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 91 | EACH | 120.00 | 10,920.00 | 165.00 | 15,015.00 | 30.00 | 2,730.00 | 30.00 | 2,730.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 5,928 | LNFT | 2.60 | 15,412.80 | 2.25 | 13,338.00 | 2.10 | 12,448.80 | 2.25 | 13,338.00 | | 0015 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 9,946.6 | SQYD | 50.00 | 497,330.00 | 54.00 | 537,116.40 | 47.00 | 467,490.20 | 57.50 | 571,929.50 | | 0016 | 302-03-00100 | Base Drain Outlet | 22 | EACH | 500.00 | 11,000.00 | 740.00 | 16,280.00 | 1,050.00 | 23,100.00 | 2,200.00 | 48,400.00 | | 0017 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 9,948 | SQYD | 19.00 | 189,012.00 | 22.00 | 218,856.00 | 21.00 | 208,908.00 | 36.00 | 358,128.00 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 62 | CUYD | 175.00 | 10,850.00 | 155.00 | 9,610.00 | 135.00 | 8,370.00 | 105.00 | 6,510.00 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 20 | CUYD | 175.00 | 3,500.00 | 145.00 | 2,900.00 | 135.00 | 2,700.00 | 125.00 | 2,500.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 2,167.8 | TON | 200.00 | 433,560.00 | 202.00 | 437,895.60 | 185.00 | 401,043.00 | 220.00 | 476,916.00 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 350.6 | TON | 240.00 | 84,144.00 | 245.00 | 85,897.00 | 225.00 | 78,885.00 | 300.00 | 105,180.00 | | 0022 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 260 | SQYD | 180.00 | 46,800.00 | 185.00 | 48,100.00 | 170.00 | 44,200.00 | 155.00 | 40,300.00 | | 0023 | 701-05-01104 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 50 | LNFT | 180.00 | 9,000.00 | 162.00 | 8,100.00 | 210.00 | 10,500.00 | 300.00 | 15,000.00 | | 0024 | 701-05-02044 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW/CMP) | 52 | LNFT | 115.00 | 5,980.00 | 111.00 | 5,772.00 | 120.00 | 6,240.00 | 220.00 | 11,440.00 | | 0025 | 701-05-02066 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW/CMP) | 80 | LNFT | 130.00 | 10,400.00 | 163.00 | 13,040.00 | 135.00 | 10,800.00 | 305.00 | 24,400.00 | | 0026 | 701-05-02104 | Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 26 | LNFT | 170.00 | 4,420.00 | 223.00 | 5,798.00 | 280.00 | 7,280.00 | 335.00 | 8,710.00 | | 0027 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 26 | LNFT | 205.00 | 5,330.00 | 178.00 | 4,628.00 | 220.00 | 5,720.00 | 425.00 | 11,050.00 | | 0028 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 306.3 | LNFT | 30.00 | 9,189.00 | 29.00 | 8,882.70 | 26.00 | 7,963.80 | 30.00 | 9,189.00 | | 0029 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 140.00 | 42,000.00 | 128.00 | 38,400.00 | 120.00 | 36,000.00 | 120.00 | 36,000.00 | | 0030 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,000.00 | 8,000.00 | 3,670.00 | 7,340.00 | 3,350.00 | 6,700.00 | 3,500.00 | 7,000.00 | | 0031 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 10 | EACH | 3,500.00 | 35,000.00 | 3,370.00 | 33,700.00 | 3,075.00 | 30,750.00 | 3,250.00 | 32,500.00 | | 0032 | 705-01-00100 | Barbed Wire Fence | 758 | LNFT | 14.00 | 10,612.00 | 13.15 | 9,967.70 | 11.50 | 8,717.00 | 12.50 | 9,475.00 | | 0033 | 708-01-00100 | Right-of-Way Monument | 31 | EACH | 700.00 | 21,700.00 | 660.00 | 20,460.00 | 600.00 | 18,600.00 | 650.00 | 20,150.00 | | 0034 | 708-02-00100 | Right-of-Way Monument Witness Post | 31 | EACH | 220.00 | 6,820.00 | 220.00 | 6,820.00 | 200.00 | 6,200.00 | 250.00 | 7,750.00 | | 0035 | 712-04-00100 | Flexible Revetment | 1,960 | SQYD | 100.00 | 196,000.00 | 95.00 | 186,200.00 | 85.00 | 166,600.00 | 90.00 | 176,400.00 | | 0036 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 75,000.00 | 75,000.00 | 225,000.00 | 225,000.00 | 145,000.00 | 145,000.00 | | 0037 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 903 | SQYD | 2.50 | 2,257.50 | 2.20 | 1,986.60 | 1.70 | 1,535.10 | 1.75 | 1,580.25 | | 0038 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | | 0039 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.575 | MILE | 9,000.00 | 5,175.00 | 325.00 | 186.88 | 300.00 | 172.50 | 1,650.00 | 948.75 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 900,000.00 | 900,000.00 | 993,000.00 | 993,000.00 | 1,059,460.00 | 1,059,460.00 | 1,000,000.00 | 1,000,000.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 100.00 | 1,200.00 | 110.00 | 1,320.00 | 85.00 | 1,020.00 | 90.00 | 1,080.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 134 | EACH | 9.00 | 1,206.00 | 9.00 | 1,206.00 | 4.00 | 536.00 | 8.50 | 1,139.00 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.151 | MILE | 6,200.00 | 13,336.20 | 6,105.00 | 13,131.86 | 3,800.00 | 8,173.80 | 5,500.00 | 11,830.50 | | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.308 | MILE | 2,200.00 | 677.60 | 2,100.00 | 646.80 | 1,820.00 | 560.56 | 1,900.00 | 585.20 | | 0045 | 735-01-00100 | Mailboxes | 1 | EACH | 100.00 | 100.00 | 28.00 | 28.00 | 25.00 | 25.00 | 21.00 | 21.00 | | 0046 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 1,000.00 | 1,000.00 | 250.00 | 250.00 | 225.00 | 225.00 | 275.00 | 275.00 | | 0047 | 739-01-00100 | Hydro-Seeding | 4.04 | ACRE | 3,000.00 | 12,120.00 | 3,075.00 | 12,423.00 | 2,550.00 | 10,302.00 | 2,750.00 | 11,110.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 150,000.00 | 150,000.00 | 70,000.00 | 70,000.00 | 145,000.00 | 145,000.00 | 115,000.00 | 115,000.00 | | 0049 | 802-02-00100 | Permanent Sheeting (Steel) | 5,494 | SQFT | 55.00 | 302,170.00 | 51.00 | 280,194.00 | 40.00 | 219,760.00 | 50.00 | 274,700.00 | | 0050 | 804-01-00600 | Precast Concrete Piles (24") | 8,608 | LNFT | 215.00 | 1,850,720.00 | 170.00 | 1,463,360.00 | 200.00 | 1,721,600.00 | 280.00 | 2,410,240.00 | | 0051 | 805-01-00100 | Class A1 Concrete (Slab Span) | 811.2 | CUYD | 1,270.00 | 1,030,224.00 | 1,700.00 | 1,379,040.00 | 1,500.00 | 1,216,800.00 | 1,000.00 | 811,200.00 | | 0052 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 294.91 | CUYD | 2,000.00 | 589,820.00 | 3,500.00 | 1,032,185.00 | 2,800.00 | 825,748.00 | 1,750.00 | 516,092.50 | | 0053 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 6,566 | SQFT | 3.00 | 19,698.00 | 2.75 | 18,056.50 | 3.00 | 19,698.00 | 3.00 | 19,698.00 | | 0054 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 6,566 | SQFT | 3.50 | 22,981.00 | 3.75 | 24,622.50 | 3.50 | 22,981.00 | 3.00 | 19,698.00 | | 0055 | 806-01-00100 | Deformed Reinforcing Steel | 200,456 | LB | 1.80 | 360,820.80 | 2.50 | 501,140.00 | 1.60 | 320,729.60 | 1.25 | 250,570.00 | | 0056 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 960 | LNFT | 150.00 | 144,000.00 | 160.00 | 153,600.00 | 200.00 | 192,000.00 | 200.00 | 192,000.00 | | 0057 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 8,320 | SQFT | 90.00 | 748,800.00 | 80.00 | 665,600.00 | 125.00 | 1,040,000.00 | 110.00 | 915,200.00 | | 0058 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 636 | SFIN | 160.00 | 101,760.00 | 107.00 | 68,052.00 | 125.00 | 79,500.00 | 95.00 | 60,420.00 | | 0059 | 815-03-00300 | Joint Seal (Poured) | 920 | LNFT | 10.00 | 9,200.00 | 42.00 | 38,640.00 | 25.00 | 23,000.00 | 40.00 | 36,800.00 | | 0060 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 610 | LNFT | 12.00 | 7,320.00 | 8.50 | 5,185.00 | 8.00 | 4,880.00 | 15.00 | 9,150.00 | | 0061 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 1,016 | LNFT | 3.00 | 3,048.00 | 2.25 | 2,286.00 | 1.00 | 1,016.00 | 7.50 | 7,620.00 | | 0062 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,927 | INLF | 2.00 | 3,854.00 | 1.00 | 1,927.00 | 1.00 | 1,927.00 | 3.75 | 7,226.25 | | 0063 | TS-741-60009 | Water Main Pipeline Markers | 3 | EACH | 215.00 | 645.00 | 1,210.00 | 3,630.00 | 400.00 | 1,200.00 | 225.00 | 675.00 | | 0064 | TS-741-60011 | Cut, Cap and Block Existing Water Main | 1 | EACH | 5,000.00 | 5,000.00 | 1,635.00 | 1,635.00 | 3,000.00 | 3,000.00 | 5,500.00 | 5,500.00 | | 0065 | 741-20-03040 | Water Main (2" PE) | 1,400 | LNFT | 22.00 | 30,800.00 | 37.50 | 52,500.00 | 32.00 | 44,800.00 | 25.00 | 35,000.00 | | 0066 | 741-21-01000 | Gate Valve (2") | 2 | EACH | 6,000.00 | 12,000.00 | 2,910.00 | 5,820.00 | 2,000.00 | 4,000.00 | 6,500.00 | 13,000.00 | | 0067 | 741-21-01000 | Gate Valve (2” Blowoff Assembly) | 1 | EACH | 7,000.00 | 7,000.00 | 1,950.00 | 1,950.00 | 2,000.00 | 2,000.00 | 7,000.00 | 7,000.00 | | 0068 | 741-28-01020 | Service Connection (3/4" PVC) | 3 | LNFT | 2,200.00 | 6,600.00 | 1,810.00 | 5,430.00 | 425.00 | 1,275.00 | 2,500.00 | 7,500.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,155,555.10 | | 9,967,239.22 | | 10,594,650.81 | | 10,687,170.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - RNGD Infrastructure LLC | - 6 - Coastal Contractors, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4 | LUMP | 29,700.00 | 29,700.00 | 300,000.00 | 300,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,500.00 | 3,500.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 55 | SQYD | 13.00 | 715.00 | 80.00 | 4,400.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 7,794.4 | SQYD | 10.00 | 77,944.00 | 23.00 | 179,271.20 | | 0005 | 202-02-04501 | Removal of Bridge REMOVAL OF BRIDGE - STR. NO. 03492190701931 (STA. 107+72.00; 28.4' X 209' CONCRETE PRECAST SLAB SPAN BRIDGE) | 5,936 | LUMP | 275,000.00 | 275,000.00 | 120,000.00 | 120,000.00 | | 0006 | 202-02-04501 | Removal of Bridge REMOVAL OF BRIDGE - STR. NO. 03492190702091 (STA. 116+20.00; 27.5' X 95' CONCRETE PRECAST SLAB SPAN BRIDGE) | 2,613 | LUMP | 87,000.00 | 87,000.00 | 75,000.00 | 75,000.00 | | 0007 | 202-02-04501 | Removal of Bridge REMOVAL OF BRIDGE - STR. NO. 03492190702901 (STA. 159+25.00; 28.4' X 76' CONCRETE PRECAST SLAB SPAN BRIDGE) | 2,158 | LUMP | 86,000.00 | 86,000.00 | 65,000.00 | 65,000.00 | | 0008 | 202-02-12000 | Removal of Fence | 758 | LNFT | 6.00 | 4,548.00 | 4.00 | 3,032.00 | | 0009 | 202-02-14500 | Removal of Guard Rail | 1,930.9 | LNFT | 6.00 | 11,585.40 | 8.00 | 15,447.20 | | 0010 | 203-01-00100 | General Excavation | 4,700 | CUYD | 30.00 | 141,000.00 | 28.00 | 131,600.00 | | 0011 | 203-02-00100 | Drainage Excavation | 1,258 | CUYD | 27.00 | 33,966.00 | 35.00 | 44,030.00 | | 0012 | 203-03-00100 | Embankment | 10,178 | CUYD | 41.50 | 422,387.00 | 60.00 | 610,680.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 91 | EACH | 40.00 | 3,640.00 | 35.00 | 3,185.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 5,928 | LNFT | 2.50 | 14,820.00 | 2.50 | 14,820.00 | | 0015 | 302-02-12070 | Class II Base Course (12" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 9,946.6 | SQYD | 64.00 | 636,582.40 | 70.00 | 696,262.00 | | 0016 | 302-03-00100 | Base Drain Outlet | 22 | EACH | 2,300.00 | 50,600.00 | 1,900.00 | 41,800.00 | | 0017 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 9,948 | SQYD | 31.00 | 308,388.00 | 35.00 | 348,180.00 | | 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 62 | CUYD | 325.00 | 20,150.00 | 245.00 | 15,190.00 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 20 | CUYD | 475.00 | 9,500.00 | 150.00 | 3,000.00 | | 0020 | 502-01-00100 | Asphalt Concrete | 2,167.8 | TON | 300.00 | 650,340.00 | 220.00 | 476,916.00 | | 0021 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 350.6 | TON | 430.00 | 150,758.00 | 250.00 | 87,650.00 | | 0022 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 260 | SQYD | 545.00 | 141,700.00 | 225.00 | 58,500.00 | | 0023 | 701-05-01104 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 50 | LNFT | 136.00 | 6,800.00 | 375.00 | 18,750.00 | | 0024 | 701-05-02044 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW/CMP) | 52 | LNFT | 95.00 | 4,940.00 | 200.00 | 10,400.00 | | 0025 | 701-05-02066 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW/CMP) | 80 | LNFT | 96.00 | 7,680.00 | 195.00 | 15,600.00 | | 0026 | 701-05-02104 | Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 26 | LNFT | 182.00 | 4,732.00 | 365.00 | 9,490.00 | | 0027 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 26 | LNFT | 151.00 | 3,926.00 | 350.00 | 9,100.00 | | 0028 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 306.3 | LNFT | 34.00 | 10,414.20 | 30.00 | 9,189.00 | | 0029 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 155.00 | 46,500.00 | 140.00 | 42,000.00 | | 0030 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,500.00 | 9,000.00 | 3,750.00 | 7,500.00 | | 0031 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 10 | EACH | 4,100.00 | 41,000.00 | 3,300.00 | 33,000.00 | | 0032 | 705-01-00100 | Barbed Wire Fence | 758 | LNFT | 15.00 | 11,370.00 | 13.00 | 9,854.00 | | 0033 | 708-01-00100 | Right-of-Way Monument | 31 | EACH | 800.00 | 24,800.00 | 700.00 | 21,700.00 | | 0034 | 708-02-00100 | Right-of-Way Monument Witness Post | 31 | EACH | 265.00 | 8,215.00 | 225.00 | 6,975.00 | | 0035 | 712-04-00100 | Flexible Revetment | 1,960 | SQYD | 96.00 | 188,160.00 | 100.00 | 196,000.00 | | 0036 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 54,000.00 | 54,000.00 | 100,000.00 | 100,000.00 | | 0037 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 903 | SQYD | 3.00 | 2,709.00 | 2.00 | 1,806.00 | | 0038 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 80,500.00 | 80,500.00 | 60,000.00 | 60,000.00 | | 0039 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.575 | MILE | 1,900.00 | 1,092.50 | 300.00 | 172.50 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 1,100,000.00 | 1,100,000.00 | 1,050,000.00 | 1,050,000.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 112.00 | 1,344.00 | 90.00 | 1,080.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 134 | EACH | 5.00 | 670.00 | 4.00 | 536.00 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.151 | MILE | 4,600.00 | 9,894.60 | 4,000.00 | 8,604.00 | | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.308 | MILE | 2,400.00 | 739.20 | 2,000.00 | 616.00 | | 0045 | 735-01-00100 | Mailboxes | 1 | EACH | 27.00 | 27.00 | 25.00 | 25.00 | | 0046 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 332.00 | 332.00 | 250.00 | 250.00 | | 0047 | 739-01-00100 | Hydro-Seeding | 4.04 | ACRE | 3,400.00 | 13,736.00 | 2,700.00 | 10,908.00 | | 0048 | 740-01-00100 | Construction Layout | 1 | LUMP | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | | 0049 | 802-02-00100 | Permanent Sheeting (Steel) | 5,494 | SQFT | 50.00 | 274,700.00 | 63.00 | 346,122.00 | | 0050 | 804-01-00600 | Precast Concrete Piles (24") | 8,608 | LNFT | 300.00 | 2,582,400.00 | 235.00 | 2,022,880.00 | | 0051 | 805-01-00100 | Class A1 Concrete (Slab Span) | 811.2 | CUYD | 1,650.00 | 1,338,480.00 | 2,500.00 | 2,028,000.00 | | 0052 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 294.91 | CUYD | 2,100.00 | 619,311.00 | 2,900.00 | 855,239.00 | | 0053 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 6,566 | SQFT | 6.00 | 39,396.00 | 2.50 | 16,415.00 | | 0054 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 6,566 | SQFT | 10.00 | 65,660.00 | 3.50 | 22,981.00 | | 0055 | 806-01-00100 | Deformed Reinforcing Steel | 200,456 | LB | 2.00 | 400,912.00 | 1.22 | 244,556.32 | | 0056 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 960 | LNFT | 175.00 | 168,000.00 | 225.00 | 216,000.00 | | 0057 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 8,320 | SQFT | 88.00 | 732,160.00 | 100.00 | 832,000.00 | | 0058 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 636 | SFIN | 146.00 | 92,856.00 | 120.00 | 76,320.00 | | 0059 | 815-03-00300 | Joint Seal (Poured) | 920 | LNFT | 39.00 | 35,880.00 | 50.00 | 46,000.00 | | 0060 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 610 | LNFT | 11.00 | 6,710.00 | 3.25 | 1,982.50 | | 0061 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 1,016 | LNFT | 8.00 | 8,128.00 | 1.00 | 1,016.00 | | 0062 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,927 | INLF | 2.00 | 3,854.00 | 4.00 | 7,708.00 | | 0063 | TS-741-60009 | Water Main Pipeline Markers | 3 | EACH | 700.00 | 2,100.00 | 1.21 | 3.63 | | 0064 | TS-741-60011 | Cut, Cap and Block Existing Water Main | 1 | EACH | 2,200.00 | 2,200.00 | 2,180.00 | 2,180.00 | | 0065 | 741-20-03040 | Water Main (2" PE) | 1,400 | LNFT | 50.00 | 70,000.00 | 48.00 | 67,200.00 | | 0066 | 741-21-01000 | Gate Valve (2") | 2 | EACH | 1,600.00 | 3,200.00 | 1,800.00 | 3,600.00 | | 0067 | 741-21-01000 | Gate Valve (2” Blowoff Assembly) | 1 | EACH | 2,500.00 | 2,500.00 | 4,800.00 | 4,800.00 | | 0068 | 741-28-01020 | Service Connection (3/4" PVC) | 3 | LNFT | 600.00 | 1,800.00 | 1,800.00 | 5,400.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 11,392,652.30 | | 11,897,922.35 |
|