Proposal:H.016056.6
Parish:Acadia
Routes:LA 95
Description:LA 95: LA 365 - BEG. OF PCCP
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, FIBERGLASS REINFORCED PAVING MAT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,648,380.35
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $5,565,613.01 |
| 2 | 51821 | Elliott Construction, LLC | $5,662,735.81 |
| 3 | 33663 | Glenn Lege Construction LLC | $7,448,159.72 |
| 4 | 12312 | Gilchrist Construction Company, LLC | $8,190,014.65 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Elliott Construction, LLC | - 3 - Glenn Lege Construction LLC | - 4 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | 6,015.00 | 6,015.00 | 25,000.00 | 25,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 467 | SQYD | 80.00 | 37,360.00 | 35.00 | 16,345.00 | 16.50 | 7,705.50 | 100.00 | 46,700.00 | | 0003 | 202-02-04560 | Removal of Bridge Joint Existing Joint Material | 631 | LNFT | 10.00 | 6,310.00 | 5.50 | 3,470.50 | 20.00 | 12,620.00 | 70.00 | 44,170.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 822 | LNFT | 15.00 | 12,330.00 | 18.00 | 14,796.00 | 16.00 | 13,152.00 | 16.00 | 13,152.00 | | 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) (24" - 36" CMPA) | 845 | LNFT | 25.00 | 21,125.00 | 35.00 | 29,575.00 | 65.00 | 54,925.00 | 75.00 | 63,375.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,625 | CUYD | 45.00 | 73,125.00 | 45.00 | 73,125.00 | 58.50 | 95,062.50 | 90.00 | 146,250.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 80 | EACH | 125.00 | 10,000.00 | 150.00 | 12,000.00 | 171.00 | 13,680.00 | 200.00 | 16,000.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,903 | CUYD | 75.00 | 217,725.00 | 150.00 | 435,450.00 | 71.50 | 207,564.50 | 75.00 | 217,725.00 | | 0009 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 50.00 | 10,000.00 | 100.00 | 20,000.00 | 146.00 | 29,200.00 | 100.00 | 20,000.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 13,154.5 | TON | 127.00 | 1,670,621.50 | 135.00 | 1,775,857.50 | 152.00 | 1,999,484.00 | 190.00 | 2,499,355.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,886.8 | TON | 222.00 | 418,869.60 | 185.00 | 349,058.00 | 171.50 | 323,586.20 | 340.00 | 641,512.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 59,696 | SQYD | 3.00 | 179,088.00 | 2.75 | 164,164.00 | 1.75 | 104,468.00 | 5.00 | 298,480.00 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,485 | CUYD | 0.01 | -24.85 | 0.01 | -24.85 | 0.15 | -372.75 | 2.00 | -4,970.00 | | 0014 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 4,956 | SQYD | 160.00 | 792,960.00 | 188.00 | 931,728.00 | 234.00 | 1,159,704.00 | 225.00 | 1,115,100.00 | | 0015 | 602-12-00100 | Undersealing Pavement | 6 | TON | 4,250.00 | 25,500.00 | 3,850.00 | 23,100.00 | 4,420.00 | 26,520.00 | 25,000.00 | 150,000.00 | | 0016 | 602-14-00100 | Holes | 8 | EACH | 600.00 | 4,800.00 | 550.00 | 4,400.00 | 632.00 | 5,056.00 | 1,500.00 | 12,000.00 | | 0017 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 756 | LNFT | 475.00 | 359,100.00 | 375.00 | 283,500.00 | 380.50 | 287,658.00 | 900.00 | 680,400.00 | | 0018 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 112 | LNFT | 575.00 | 64,400.00 | 350.00 | 39,200.00 | 595.00 | 66,640.00 | 900.00 | 100,800.00 | | 0019 | 701-15-00100 | Concrete Collar | 1 | EACH | 3,250.00 | 3,250.00 | 2,200.00 | 2,200.00 | 755.00 | 755.00 | 6,000.00 | 6,000.00 | | 0020 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 812 | LNFT | 6.00 | 4,872.00 | 3.00 | 2,436.00 | 225.00 | 182,700.00 | 30.00 | 24,360.00 | | 0021 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 76 | LNFT | 85.00 | 6,460.00 | 50.00 | 3,800.00 | 89.00 | 6,764.00 | 46.00 | 3,496.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,043.75 | LNFT | 40.00 | 41,750.00 | 30.00 | 31,312.50 | 42.30 | 44,150.63 | 27.00 | 28,181.25 | | 0023 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 100.00 | 10,000.00 | 70.00 | 7,000.00 | 105.00 | 10,500.00 | 63.00 | 6,300.00 | | 0024 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 165.00 | 49,500.00 | 135.00 | 40,500.00 | 170.50 | 51,150.00 | 120.00 | 36,000.00 | | 0025 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 6,000.00 | 6,000.00 | 4,400.00 | 4,400.00 | 6,315.00 | 6,315.00 | 4,000.00 | 4,000.00 | | 0026 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 7 | EACH | 4,750.00 | 33,250.00 | 3,850.00 | 26,950.00 | 5,115.00 | 35,805.00 | 3,500.00 | 24,500.00 | | 0027 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 4,500.00 | 18,000.00 | 3,400.00 | 13,600.00 | 4,735.00 | 18,940.00 | 3,100.00 | 12,400.00 | | 0028 | 707-04-00100 | Asphalt Curb | 162 | LNFT | 170.00 | 27,540.00 | 150.00 | 24,300.00 | 61.50 | 9,963.00 | 125.00 | 20,250.00 | | 0029 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 80 | SQYD | 200.00 | 16,000.00 | 125.00 | 10,000.00 | 155.00 | 12,400.00 | 275.00 | 22,000.00 | | 0030 | 711-04-00100 | Geotextile Fabric | 80 | SQYD | 6.00 | 480.00 | 6.50 | 520.00 | 2.60 | 208.00 | 10.00 | 800.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 275,000.00 | 275,000.00 | 85,000.00 | 85,000.00 | 688,950.00 | 688,950.00 | 165,000.00 | 165,000.00 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.359 | MILE | 650.00 | 8,683.35 | 825.00 | 11,021.18 | 500.00 | 6,679.50 | 300.00 | 4,007.70 | | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 10.956 | MILE | 1.00 | 10.96 | 660.00 | 7,230.96 | 631.50 | 6,918.71 | 600.00 | 6,573.60 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 35.703 | MILE | 1.00 | 35.70 | 880.00 | 31,418.64 | 884.00 | 31,561.45 | 800.00 | 28,562.40 | | 0035 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 49,995.00 | 49,995.00 | 25,000.00 | 25,000.00 | | 0036 | 724-01-00100 | Rumble Strips (Centerline) | 4.025 | MILE | 1,200.00 | 4,830.00 | 1,100.00 | 4,427.50 | 341.00 | 1,372.53 | 1,000.00 | 4,025.00 | | 0037 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 8.05 | MILE | 1,200.00 | 9,660.00 | 1,100.00 | 8,855.00 | 341.00 | 2,745.05 | 1,000.00 | 8,050.00 | | 0038 | 726-01-00100 | Bedding Material | 86.2 | CUYD | 165.00 | 14,223.00 | 175.00 | 15,085.00 | 136.00 | 11,723.20 | 175.00 | 15,085.00 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 350,000.00 | 350,000.00 | 944,075.00 | 944,075.00 | 800,000.00 | 800,000.00 | | 0040 | 729-16-00200 | Object Marker Assembly (Type 2) | 32 | EACH | 65.00 | 2,080.00 | 85.00 | 2,720.00 | 120.50 | 3,856.00 | 85.00 | 2,720.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 22 | EACH | 150.00 | 3,300.00 | 95.00 | 2,090.00 | 171.50 | 3,773.00 | 85.00 | 1,870.00 | | 0042 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 2,703 | EACH | 12.00 | 32,436.00 | 11.00 | 29,733.00 | 12.75 | 34,463.25 | 10.00 | 27,030.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 694 | EACH | 6.00 | 4,164.00 | 6.00 | 4,164.00 | 5.10 | 3,539.40 | 5.00 | 3,470.00 | | 0044 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.901 | MILE | 6,250.00 | 74,381.25 | 5,825.00 | 69,323.33 | 5,050.00 | 60,100.05 | 5,300.00 | 63,075.30 | | 0045 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.652 | MILE | 4,250.00 | 15,521.00 | 4,025.00 | 14,699.30 | 2,275.00 | 8,308.30 | 3,700.00 | 13,512.40 | | 0046 | 732-05-00100 | Removal of Existing Markings | 0.06 | MILE | 11,000.00 | 660.00 | 9,900.00 | 594.00 | 3,790.00 | 227.40 | 9,000.00 | 540.00 | | 0047 | 735-01-00100 | Mailboxes | 99 | EACH | 10.00 | 990.00 | 22.00 | 2,178.00 | 1.40 | 138.60 | 20.00 | 1,980.00 | | 0048 | 735-02-00100 | Mailbox Supports (Single) | 99 | EACH | 300.00 | 29,700.00 | 275.00 | 27,225.00 | 380.00 | 37,620.00 | 210.00 | 20,790.00 | | 0049 | 739-01-00100 | Hydro-Seeding | 2.16 | ACRE | 3,500.00 | 7,560.00 | 3,350.00 | 7,236.00 | 3,820.00 | 8,251.20 | 3,300.00 | 7,128.00 | | 0050 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 10,000.00 | 10,000.00 | 26,525.00 | 26,525.00 | 40,000.00 | 40,000.00 | | 0051 | 815-03-00300 | Joint Seal (Poured) | 631 | LNFT | 10.00 | 6,310.00 | 5.50 | 3,470.50 | 37.00 | 23,347.00 | 65.00 | 41,015.00 | | 0052 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 58,570 | SQYD | 6.00 | 351,420.00 | 7.50 | 439,275.00 | 8.50 | 497,845.00 | 8.00 | 468,560.00 | | 0053 | NS-502-04210 | Asphalt Tack Coat | 14,057 | GAL | 4.50 | 63,256.50 | 12.75 | 179,226.75 | 14.50 | 203,826.50 | 12.00 | 168,684.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,565,613.01 | | 5,662,735.81 | | 7,448,159.72 | | 8,190,014.65 |
|