Proposal:H.016055.6
Parish:Iberia
Routes:LA 83
Description:LA 83: US 90 - DARNALL ROAD
Type Construction:MILLING ASPHALT PAVEMENT, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, IN-PLACE CEMENT TREATED SUBGRADE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$8,624,040.59
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $8,852,587.50 |
| 2 | 33663 | Glenn Lege Construction LLC | $9,990,146.74 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 767 | SQYD | 35.00 | 26,845.00 | 21.28 | 16,321.76 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 1,332.9 | LNFT | 20.00 | 26,658.00 | 8.57 | 11,422.95 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 951 | SQYD | 35.00 | 33,285.00 | 32.39 | 30,802.89 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,621 | CUYD | 25.00 | 40,525.00 | 52.77 | 85,540.17 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 40 | EACH | 150.00 | 6,000.00 | 174.05 | 6,962.00 | | 0006 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 89,118 | SQYD | 18.00 | 1,604,124.00 | 13.82 | 1,231,610.76 | | 0007 | 303-02-00100 | Removal of Existing Patches | 50 | SQYD | 60.00 | 3,000.00 | 59.03 | 2,951.50 | | 0008 | 304-01-00100 | Lime | 116.97 | TON | 430.00 | 50,297.10 | 295.55 | 34,570.48 | | 0009 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 22,281 | SQYD | 4.00 | 89,124.00 | 4.47 | 99,596.07 | | 0010 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 89,118 | SQYD | 9.50 | 846,621.00 | 14.56 | 1,297,558.08 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,216 | CUYD | 58.00 | 70,528.00 | 103.22 | 125,515.52 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 200 | CUYD | 50.00 | 10,000.00 | 78.70 | 15,740.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 32,708.2 | TON | 105.00 | 3,434,361.00 | 158.98 | 5,199,949.64 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,201.1 | TON | 213.00 | 255,834.30 | 190.37 | 228,653.41 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 71,612 | SQYD | 4.50 | 322,254.00 | 2.94 | 210,539.28 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -7,781 | CUYD | 0.01 | -77.81 | 0.01 | -77.81 | | 0017 | 701-14-00100 | Cleaning Existing Pipes | 896 | LNFT | 65.00 | 58,240.00 | 17.53 | 15,706.88 | | 0018 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 1 | EACH | 2,000.00 | 2,000.00 | 275.46 | 275.46 | | 0019 | 706-02-00200 | Concrete Drive (6" Thick) | 543 | SQYD | 210.00 | 114,030.00 | 83.85 | 45,530.55 | | 0020 | 706-02-00300 | Concrete Drive (8" Thick) | 408 | SQYD | 275.00 | 112,200.00 | 99.43 | 40,567.44 | | 0021 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,332.9 | LNFT | 25.00 | 33,322.50 | 39.05 | 52,049.75 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 625,000.00 | 625,000.00 | 377,769.60 | 377,769.60 | | 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 299 | LNFT | 0.01 | 2.99 | 0.59 | 176.41 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 21.687 | MILE | 650.00 | 14,096.55 | 655.85 | 14,223.42 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 21.687 | MILE | 1.00 | 21.69 | 580.18 | 12,582.36 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 43.375 | MILE | 1.00 | 43.38 | 812.25 | 35,231.34 | | 0027 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 28,463.89 | 28,463.89 | | 0028 | 724-01-00100 | Rumble Strips (Centerline) | 4.255 | MILE | 1,200.00 | 5,106.00 | 1,160.35 | 4,937.29 | | 0029 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 8.508 | MILE | 1,200.00 | 10,209.60 | 1,160.35 | 9,872.26 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 875,000.00 | 875,000.00 | 539,108.70 | 539,108.70 | | 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | 22 | EACH | 65.00 | 1,430.00 | 87.03 | 1,914.66 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 40 | EACH | 125.00 | 5,000.00 | 98.63 | 3,945.20 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,039 | EACH | 6.00 | 6,234.00 | 4.64 | 4,820.96 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 299 | LNFT | 12.00 | 3,588.00 | 12.76 | 3,815.24 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.591 | MILE | 6,500.00 | 94,841.50 | 4,293.30 | 62,643.54 | | 0036 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.024 | MILE | 11,000.00 | 264.00 | 17,405.25 | 417.73 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.921 | MILE | 3,250.00 | 6,243.25 | 1,392.42 | 2,674.84 | | 0038 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 1.477 | MILE | 3,850.00 | 5,686.45 | 2,320.70 | 3,427.67 | | 0039 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.047 | MILE | 12,000.00 | 564.00 | 11,603.50 | 545.36 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 400.00 | 800.00 | 406.12 | 812.24 | | 0041 | 735-01-00100 | Mailboxes | 49 | EACH | 10.00 | 490.00 | 29.01 | 1,421.49 | | 0042 | 735-02-00100 | Mailbox Supports (Single) | 49 | EACH | 300.00 | 14,700.00 | 249.48 | 12,224.52 | | 0043 | 739-01-00100 | Hydro-Seeding | 1.17 | ACRE | 3,500.00 | 4,095.00 | 3,307.00 | 3,869.19 | | 0044 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 113,462.05 | 113,462.05 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,852,587.50 | | 9,990,146.74 |
|