Proposal:H.015954.6
Parish:Acadia
Routes:LA 1100, LA 365, LA 95
Description:LA 95 & LA 1100: LA 98 - LA 365
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE STABILIZED BASE COURSE, IN-PLACE CEMENT TREATED SUBGRADE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$8,563,488.89
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $8,848,961.34 |
| 2 | 33663 | Glenn Lege Construction LLC | $9,989,418.76 |
| 3 | 12312 | Gilchrist Construction Company, LLC | $11,267,467.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Glenn Lege Construction LLC | - 3 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 8,000.00 | 8,000.00 | 37,635.00 | 37,635.00 | 26,500.00 | 26,500.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 873 | SQYD | 10.00 | 8,730.00 | 18.00 | 15,714.00 | 50.00 | 43,650.00 | | 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 760 | SQYD | 60.00 | 45,600.00 | 22.00 | 16,720.00 | 60.00 | 45,600.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 800 | CUYD | 64.00 | 51,200.00 | 66.00 | 52,800.00 | 120.00 | 96,000.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 38 | EACH | 150.00 | 5,700.00 | 197.00 | 7,486.00 | 200.00 | 7,600.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 15,100 | LNFT | 2.00 | 30,200.00 | 3.00 | 45,300.00 | 2.50 | 37,750.00 | | 0007 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 86,182 | SQYD | 12.50 | 1,077,275.00 | 10.75 | 926,456.50 | 15.00 | 1,292,730.00 | | 0008 | 303-02-00100 | Removal of Existing Patches | 130 | SQYD | 35.00 | 4,550.00 | 37.50 | 4,875.00 | 60.00 | 7,800.00 | | 0009 | 304-01-00100 | Lime | 250.18 | TON | 450.00 | 112,581.00 | 337.00 | 84,310.66 | 400.00 | 100,072.00 | | 0010 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 21,179 | SQYD | 7.50 | 158,842.50 | 8.00 | 169,432.00 | 10.00 | 211,790.00 | | 0011 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 86,182 | SQYD | 12.00 | 1,034,184.00 | 11.00 | 948,002.00 | 16.00 | 1,378,912.00 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 4,743 | CUYD | 25.00 | 118,575.00 | 78.00 | 369,954.00 | 75.00 | 355,725.00 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 250 | CUYD | 50.00 | 12,500.00 | 159.50 | 39,875.00 | 100.00 | 25,000.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 23,380.1 | TON | 121.00 | 2,828,992.10 | 157.50 | 3,682,365.75 | 180.00 | 4,208,418.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,376.1 | TON | 200.00 | 275,220.00 | 178.00 | 244,945.80 | 330.00 | 454,113.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 77,693 | SQYD | 4.50 | 349,618.50 | 3.25 | 252,502.25 | 4.00 | 310,772.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -6,088 | CUYD | 0.01 | -60.88 | 0.15 | -913.20 | 1.00 | -6,088.00 | | 0018 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 38 | SQYD | 350.00 | 13,300.00 | 380.00 | 14,440.00 | 400.00 | 15,200.00 | | 0019 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 432 | LNFT | 450.00 | 194,400.00 | 430.00 | 185,760.00 | 700.00 | 302,400.00 | | 0020 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 100 | LNFT | 500.00 | 50,000.00 | 540.00 | 54,000.00 | 800.00 | 80,000.00 | | 0021 | 701-15-00100 | Concrete Collar | 1 | EACH | 3,250.00 | 3,250.00 | 823.00 | 823.00 | 5,000.00 | 5,000.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 96 | LNFT | 10.00 | 960.00 | 245.00 | 23,520.00 | 25.00 | 2,400.00 | | 0023 | 706-02-00200 | Concrete Drive (6" Thick) | 1,014.3 | SQYD | 225.00 | 228,217.50 | 125.00 | 126,787.50 | 200.00 | 202,860.00 | | 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 650,000.00 | 650,000.00 | 718,080.00 | 718,080.00 | 115,000.00 | 115,000.00 | | 0025 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 202 | LNFT | 0.01 | 2.02 | 1.35 | 272.70 | 1.00 | 202.00 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 15.047 | MILE | 650.00 | 9,780.55 | 394.00 | 5,928.52 | 300.00 | 4,514.10 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 15.047 | MILE | 1.00 | 15.05 | 657.00 | 9,885.88 | 500.00 | 7,523.50 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 38.196 | MILE | 1.00 | 38.20 | 920.00 | 35,140.32 | 700.00 | 26,737.20 | | 0029 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,000.00 | 15,000.00 | 62,270.00 | 62,270.00 | 24,000.00 | 24,000.00 | | 0030 | 724-01-00100 | Rumble Strips (Centerline) | 3.375 | MILE | 1,200.00 | 4,050.00 | 355.00 | 1,198.13 | 1,000.00 | 3,375.00 | | 0031 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.964 | MILE | 1,200.00 | 13,156.80 | 355.00 | 3,892.22 | 1,000.00 | 10,964.00 | | 0032 | 724-03-00100 | Rumble Strips (Intersection) | 6 | EACH | 1,500.00 | 9,000.00 | 1,313.00 | 7,878.00 | 1,250.00 | 7,500.00 | | 0033 | 726-01-00100 | Bedding Material | 62.3 | CUYD | 175.00 | 10,902.50 | 148.00 | 9,220.40 | 170.00 | 10,591.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 900,000.00 | 900,000.00 | 1,056,100.00 | 1,056,100.00 | 1,100,000.00 | 1,100,000.00 | | 0035 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 65.00 | 390.00 | 165.00 | 990.00 | 75.00 | 450.00 | | 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 125.00 | 1,500.00 | 197.00 | 2,364.00 | 85.00 | 1,020.00 | | 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,168 | EACH | 6.00 | 7,008.00 | 5.25 | 6,132.00 | 4.00 | 4,672.00 | | 0038 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 71 | LNFT | 15.00 | 1,065.00 | 14.00 | 994.00 | 10.00 | 710.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.568 | MILE | 6,250.00 | 91,050.00 | 5,252.00 | 76,511.14 | 4,000.00 | 58,272.00 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.718 | MILE | 3,250.00 | 18,583.50 | 2,364.00 | 13,517.35 | 1,800.00 | 10,292.40 | | 0041 | 735-01-00100 | Mailboxes | 146 | EACH | 10.00 | 1,460.00 | 33.00 | 4,818.00 | 20.00 | 2,920.00 | | 0042 | 735-02-00100 | Mailbox Supports (Single) | 122 | EACH | 230.00 | 28,060.00 | 263.00 | 32,086.00 | 250.00 | 30,500.00 | | 0043 | 735-03-00100 | Mailbox Supports (Double) | 12 | EACH | 230.00 | 2,760.00 | 362.00 | 4,344.00 | 350.00 | 4,200.00 | | 0044 | 739-01-00100 | Hydro-Seeding | 5.54 | ACRE | 3,250.00 | 18,005.00 | 3,546.00 | 19,644.84 | 3,000.00 | 16,620.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 37,160.00 | 37,160.00 | 45,000.00 | 45,000.00 | | 0046 | NS-701-00020 | Culvert Rehabilitation by Geopolymer Lining | 413 | LNFT | 1,100.00 | 454,300.00 | 1,400.00 | 578,200.00 | 1,400.00 | 578,200.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 8,848,961.34 | | 9,989,418.76 | | 11,267,467.20 |
|