Search


Bid Tabulations for the Letting of 6/11/2025 LA DOTD Headquarters

Proposal:H.015954.6
Parish:Acadia
Routes:LA 1100, LA 365, LA 95
Description:LA 95 & LA 1100: LA 98 - LA 365
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, LIME TREATMENT, IN-PLACE STABILIZED BASE COURSE, IN-PLACE CEMENT TREATED SUBGRADE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$8,563,488.89
Rank License BidderConstruction Bid
134356Prairie Contractors LLC$8,848,961.34
233663Glenn Lege Construction LLC$9,989,418.76
312312Gilchrist Construction Company, LLC$11,267,467.20


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Prairie Contractors LLC
- 2 -
Glenn Lege Construction LLC
- 3 -
Gilchrist Construction Company, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-01-00100Removal of Structures and Obstructions 1     LUMP8,000.008,000.0037,635.0037,635.0026,500.0026,500.00
0002202-02-02000Removal of Asphalt Drives 873     SQYD10.008,730.0018.0015,714.0050.0043,650.00
0003202-02-06100Removal of Concrete Walks and Drives 760     SQYD60.0045,600.0022.0016,720.0060.0045,600.00
0004203-07-00100Borrow (Vehicular Measurement) 800     CUYD64.0051,200.0066.0052,800.00120.0096,000.00
0005204-05-00100Temporary Sediment Check Dams (Hay) 38     EACH150.005,700.00197.007,486.00200.007,600.00
0006204-06-00100Temporary Silt Fencing 15,100     LNFT2.0030,200.003.0045,300.002.5037,750.00
0007303-01-00200In-Place Cement Stabilized Base Course (8-1/2" Thick) 86,182     SQYD12.501,077,275.0010.75926,456.5015.001,292,730.00
0008303-02-00100Removal of Existing Patches 130     SQYD35.004,550.0037.504,875.0060.007,800.00
0009304-01-00100Lime 250.18  TON450.00112,581.00337.0084,310.66400.00100,072.00
0010304-03-00300Lime Treatment (Type C) (10" Thick) 21,179     SQYD7.50158,842.508.00169,432.0010.00211,790.00
0011309-01-10000In-Place Cement Treated Subgrade (10" Thick) 86,182     SQYD12.001,034,184.0011.00948,002.0016.001,378,912.00
0012401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 4,743     CUYD25.00118,575.0078.00369,954.0075.00355,725.00
0013402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 250     CUYD50.0012,500.00159.5039,875.00100.0025,000.00
0014502-01-00100Asphalt Concrete 23,380.1   TON121.002,828,992.10157.503,682,365.75180.004,208,418.00
0015502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 1,376.1   TON200.00275,220.00178.00244,945.80330.00454,113.00
0016509-01-00100Milling Asphalt Pavement 77,693     SQYD4.50349,618.503.25252,502.254.00310,772.00
0017509-02-00100Contractor Retained Reclaimed Asphalt Pavement -6,088     CUYD0.01-60.880.15-913.201.00-6,088.00
0018510-01-00200Pavement Patching (12" Minimum Thickness) 38     SQYD350.0013,300.00380.0014,440.00400.0015,200.00
0019701-02-01000Cross Drain Pipe Arch (24" Equiv. RCPA) 432     LNFT450.00194,400.00430.00185,760.00700.00302,400.00
0020701-02-01020Cross Drain Pipe Arch (30" Equiv. RCPA) 100     LNFT500.0050,000.00540.0054,000.00800.0080,000.00
0021701-15-00100Concrete Collar 1     EACH3,250.003,250.00823.00823.005,000.005,000.00
0022701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 96     LNFT10.00960.00245.0023,520.0025.002,400.00
0023706-02-00200Concrete Drive (6" Thick) 1,014.3   SQYD225.00228,217.50125.00126,787.50200.00202,860.00
0024713-01-00100Temporary Signs and Barricades 1     LUMP650,000.00650,000.00718,080.00718,080.00115,000.00115,000.00
0025713-02-00500Temporary Pavement Markings (24" Width) 202     LNFT0.012.021.35272.701.00202.00
0026713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 15.047 MILE650.009,780.55394.005,928.52300.004,514.10
0027713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 15.047 MILE1.0015.05657.009,885.88500.007,523.50
0028713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 38.196 MILE1.0038.20920.0035,140.32700.0026,737.20
0029722-02-00100Project Site Laboratory (Equipped) 1     EACH15,000.0015,000.0062,270.0062,270.0024,000.0024,000.00
0030724-01-00100Rumble Strips (Centerline) 3.375 MILE1,200.004,050.00355.001,198.131,000.003,375.00
0031724-02-00100Rumble Strips (Shoulder/Edge) 10.964 MILE1,200.0013,156.80355.003,892.221,000.0010,964.00
0032724-03-00100Rumble Strips (Intersection) 6     EACH1,500.009,000.001,313.007,878.001,250.007,500.00
0033726-01-00100Bedding Material 62.3   CUYD175.0010,902.50148.009,220.40170.0010,591.00
0034727-01-00100Mobilization 1     LUMP900,000.00900,000.001,056,100.001,056,100.001,100,000.001,100,000.00
0035729-16-00200Object Marker Assembly (Type 2) 6     EACH65.00390.00165.00990.0075.00450.00
0036729-16-00300Object Marker Assembly (Type 3) 12     EACH125.001,500.00197.002,364.0085.001,020.00
0037731-02-00100Reflectorized Raised Pavement Markers 1,168     EACH6.007,008.005.256,132.004.004,672.00
0038732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 71     LNFT15.001,065.0014.00994.0010.00710.00
0039732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 14.568 MILE6,250.0091,050.005,252.0076,511.144,000.0058,272.00
0040732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 5.718 MILE3,250.0018,583.502,364.0013,517.351,800.0010,292.40
0041735-01-00100Mailboxes 146     EACH10.001,460.0033.004,818.0020.002,920.00
0042735-02-00100Mailbox Supports (Single) 122     EACH230.0028,060.00263.0032,086.00250.0030,500.00
0043735-03-00100Mailbox Supports (Double) 12     EACH230.002,760.00362.004,344.00350.004,200.00
0044739-01-00100Hydro-Seeding 5.54  ACRE3,250.0018,005.003,546.0019,644.843,000.0016,620.00
0045740-01-00100Construction Layout 1     LUMP1,000.001,000.0037,160.0037,160.0045,000.0045,000.00
0046NS-701-00020Culvert Rehabilitation by Geopolymer Lining 413     LNFT1,100.00454,300.001,400.00578,200.001,400.00578,200.00
           
  CONTRACTOR TOTAL   8,848,961.34 9,989,418.76 11,267,467.20