Proposal:H.015292.6
Parish:Rapides
Routes:LA 1200
Description:LA 1200: LA 121 - LA 1
Type Construction:GRADING, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, FIBERGLASS REINFORCED PAVING MAT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,213,204.97
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | Gilchrist Construction Company, LLC | $4,867,435.05 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $5,375,783.42 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gilchrist Construction Company, LLC | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 1,178.1 | SQYD | 19.00 | 22,383.90 | 12.00 | 14,137.20 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 21,763.9 | SQYD | 8.00 | 174,111.20 | 12.00 | 261,166.80 | | 0003 | 202-02-14500 | Removal of Guard Rail | 866 | LNFT | 12.00 | 10,392.00 | 12.00 | 10,392.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) (18" RCP) | 40 | LNFT | 50.00 | 2,000.00 | 20.00 | 800.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) (30" CMPA) | 203 | LNFT | 20.00 | 4,060.00 | 20.00 | 4,060.00 | | 0006 | 203-01-00100 | General Excavation | 387 | CUYD | 35.00 | 13,545.00 | 45.00 | 17,415.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,482 | CUYD | 52.00 | 77,064.00 | 19.00 | 28,158.00 | | 0008 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 22,228.3 | SQYD | 31.00 | 689,077.30 | 42.00 | 933,588.60 | | 0009 | 304-01-00100 | Lime | 154.25 | TON | 350.00 | 53,987.50 | 418.00 | 64,476.50 | | 0010 | 304-05-00100 | Lime Treatment (Type E) | 10,881.9 | SQYD | 4.00 | 43,527.60 | 5.00 | 54,409.50 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,092 | CUYD | 60.00 | 65,520.00 | 115.00 | 125,580.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 60.00 | 6,000.00 | 60.00 | 6,000.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 14,280.5 | TON | 130.00 | 1,856,465.00 | 130.00 | 1,856,465.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 604.4 | TON | 240.00 | 145,056.00 | 255.00 | 154,122.00 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 58,296 | SQYD | 4.00 | 233,184.00 | 2.15 | 125,336.40 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,808 | CUYD | 1.00 | -2,808.00 | 1.00 | -2,808.00 | | 0017 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 3,514 | SQYD | 144.00 | 506,016.00 | 140.00 | 491,960.00 | | 0018 | 701-06-02040 | Side Drain Pipe Arch (Erosion) (24" CMPA) | 140 | LNFT | 240.00 | 33,600.00 | 255.00 | 35,700.00 | | 0019 | 701-06-02060 | Side Drain Pipe Arch (Erosion) (30" CMPA) | 280 | LNFT | 190.00 | 53,200.00 | 280.00 | 78,400.00 | | 0020 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 420 | LNFT | 25.00 | 10,500.00 | 10.00 | 4,200.00 | | 0021 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 840 | LNFT | 130.00 | 109,200.00 | 130.00 | 109,200.00 | | 0022 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 62.5 | LNFT | 33.00 | 2,062.50 | 33.00 | 2,062.50 | | 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 15 | EACH | 4,000.00 | 60,000.00 | 4,000.00 | 60,000.00 | | 0024 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 3,600.00 | 3,600.00 | 3,700.00 | 3,700.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 70,000.00 | 70,000.00 | 65,000.00 | 65,000.00 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.517 | MILE | 250.00 | 3,379.25 | 154.00 | 2,081.62 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.134 | MILE | 600.00 | 4,280.40 | 700.00 | 4,993.80 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 42.474 | MILE | 800.00 | 33,979.20 | 1,000.00 | 42,474.00 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 302,500.00 | 302,500.00 | 415,000.00 | 415,000.00 | | 0030 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 130.00 | 2,080.00 | 130.00 | 2,080.00 | | 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,072 | EACH | 4.00 | 4,288.00 | 6.00 | 6,432.00 | | 0032 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 493 | LNFT | 2.50 | 1,232.50 | 3.00 | 1,479.00 | | 0033 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 493 | LNFT | 9.00 | 4,437.00 | 15.00 | 7,395.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.158 | MILE | 4,000.00 | 56,632.00 | 5,400.00 | 76,453.20 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.878 | MILE | 1,800.00 | 5,180.40 | 2,400.00 | 6,907.20 | | 0036 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 300.00 | 300.00 | 600.00 | 600.00 | | 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 8 | EACH | 300.00 | 2,400.00 | 300.00 | 2,400.00 | | 0038 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 300.00 | 300.00 | 300.00 | 300.00 | | 0039 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 5 | EACH | 300.00 | 1,500.00 | 300.00 | 1,500.00 | | 0040 | 732-05-00100 | Removal of Existing Markings | 0.037 | MILE | 2,500.00 | 92.50 | 9,000.00 | 333.00 | | 0041 | 739-01-00100 | Hydro-Seeding | 4.1 | ACRE | 2,600.00 | 10,660.00 | 2,600.00 | 10,660.00 | | 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 28,000.00 | 28,000.00 | 35,000.00 | 35,000.00 | | 0043 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 650 | INLF | 1.50 | 975.00 | 2.55 | 1,657.50 | | 0044 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 21,764 | SQYD | 6.00 | 130,584.00 | 8.00 | 174,112.00 | | 0045 | NS-502-04210 | Asphalt Tack Coat | 3,265 | GAL | 4.00 | 13,060.00 | 18.00 | 58,770.00 | | 0046 | NS-DEV-72402 | S-wave Ground Inlay Grooves (Shoulder/Edge)) | 9.014 | MILE | 2,200.00 | 19,830.80 | 2,400.00 | 21,633.60 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,867,435.05 | | 5,375,783.42 |
|