Proposal:H.015265.6
Parish:Ouachita
Routes:US 165
Description:US 165: INT. IMP. NEAR TEAKWOOD DR
Type Construction:INTELLIGENT TRANSPORTATION SYSTEM, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$1,099,073.45
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $1,576,742.20 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $1,603,011.35 |
| 3 | 49239 | WL Bass Construction Inc. | $1,911,921.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | - 3 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-03030 | Removal of Pavement Structure | 1,258.1 | SQYD | 110.00 | 138,391.00 | 50.00 | 62,905.00 | 60.00 | 75,486.00 | | 0002 | 202-02-38240 | Removal of Signs and Supports | 8 | EACH | 2,200.00 | 17,600.00 | 300.00 | 2,400.00 | 2,000.00 | 16,000.00 | | 0003 | 203-01-00100 | General Excavation | 817 | CUYD | 124.00 | 101,308.00 | 65.00 | 53,105.00 | 80.00 | 65,360.00 | | 0004 | 203-03-00100 | Embankment | 140 | CUYD | 709.00 | 99,260.00 | 95.00 | 13,300.00 | 200.00 | 28,000.00 | | 0005 | 204-02-00100 | Temporary Hay Bales | 4 | EACH | 324.00 | 1,296.00 | 30.00 | 120.00 | 50.00 | 200.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 1,224 | LNFT | 10.00 | 12,240.00 | 6.00 | 7,344.00 | 7.00 | 8,568.00 | | 0007 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 174.5 | SQYD | 365.00 | 63,692.50 | 200.00 | 34,900.00 | 140.00 | 24,430.00 | | 0008 | 302-02-08080 | Class II Base Course (8" Thick) (Asphalt Concrete Base) | 1,918.4 | SQYD | 133.00 | 255,147.20 | 200.00 | 383,680.00 | 110.00 | 211,024.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 456.8 | TON | 447.00 | 204,189.60 | 450.00 | 205,560.00 | 305.00 | 139,324.00 | | 0010 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 44.6 | SQYD | 325.00 | 14,495.00 | 500.00 | 22,300.00 | 2,000.00 | 89,200.00 | | 0011 | 701-05-01043 | Side Drain Pipe (18" RCP/RPVCP/CMP) | 8 | LNFT | 340.00 | 2,720.00 | 500.00 | 4,000.00 | 500.00 | 4,000.00 | | 0012 | 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 55 | LNFT | 390.00 | 21,450.00 | 600.00 | 33,000.00 | 200.00 | 11,000.00 | | 0013 | 701-15-00100 | Concrete Collar | 1 | EACH | 3,300.00 | 3,300.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | | 0014 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 7,200.00 | 7,200.00 | 6,000.00 | 6,000.00 | 6,000.00 | 6,000.00 | | 0015 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 12,000.00 | 24,000.00 | 8,000.00 | 16,000.00 | 5,000.00 | 10,000.00 | | 0016 | 707-01-00100 | Concrete Curb | 75.1 | LNFT | 91.00 | 6,834.10 | 75.00 | 5,632.50 | 150.00 | 11,265.00 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 175,000.00 | 175,000.00 | 185,000.00 | 185,000.00 | 650,000.00 | 650,000.00 | | 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 36 | LNFT | 1.00 | 36.00 | 3.00 | 108.00 | 0.50 | 18.00 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.533 | MILE | 200.00 | 106.60 | 250.00 | 133.25 | 1,500.00 | 799.50 | | 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.533 | MILE | 2,000.00 | 1,066.00 | 800.00 | 426.40 | 1,500.00 | 799.50 | | 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.156 | MILE | 2,000.00 | 2,312.00 | 1,200.00 | 1,387.20 | 1,500.00 | 1,734.00 | | 0022 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 5 | EACH | 33.00 | 165.00 | 150.00 | 750.00 | 25.00 | 125.00 | | 0023 | 713-05-00600 | Temporary Pavement Legends & Symbols (U-Turn) | 2 | EACH | 33.00 | 66.00 | 250.00 | 500.00 | 25.00 | 50.00 | | 0024 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.243 | MILE | 1,900.00 | 461.70 | 6,000.00 | 1,458.00 | 2,500.00 | 607.50 | | 0025 | 726-01-00100 | Bedding Material | 13.8 | CUYD | 260.00 | 3,588.00 | 250.00 | 3,450.00 | 300.00 | 4,140.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 | 160,000.00 | 160,000.00 | 190,000.00 | 190,000.00 | | 0027 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 45 | SQFT | 64.00 | 2,880.00 | 125.00 | 5,625.00 | 35.00 | 1,575.00 | | 0028 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 5 | EACH | 385.00 | 1,925.00 | 300.00 | 1,500.00 | 250.00 | 1,250.00 | | 0029 | 731-02-00100 | Reflectorized Raised Pavement Markers | 210 | EACH | 7.00 | 1,470.00 | 9.00 | 1,890.00 | 6.00 | 1,260.00 | | 0030 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 469 | LNFT | 4.00 | 1,876.00 | 15.00 | 7,035.00 | 3.00 | 1,407.00 | | 0031 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 337 | LNFT | 10.00 | 3,370.00 | 18.00 | 6,066.00 | 8.00 | 2,696.00 | | 0032 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 36 | LNFT | 25.00 | 900.00 | 30.00 | 1,080.00 | 20.00 | 720.00 | | 0033 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.067 | MILE | 8,300.00 | 8,856.10 | 8,000.00 | 8,536.00 | 6,500.00 | 6,935.50 | | 0034 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.533 | MILE | 1,800.00 | 959.40 | 4,000.00 | 2,132.00 | 1,500.00 | 799.50 | | 0035 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.01 | MILE | 11,000.00 | 110.00 | 6,000.00 | 60.00 | 10,000.00 | 100.00 | | 0036 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.09 | MILE | 15,000.00 | 1,350.00 | 12,000.00 | 1,080.00 | 15,000.00 | 1,350.00 | | 0037 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 400.00 | 2,000.00 | 600.00 | 3,000.00 | 350.00 | 1,750.00 | | 0038 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 2 | EACH | 550.00 | 1,100.00 | 1,000.00 | 2,000.00 | 450.00 | 900.00 | | 0039 | 732-05-00100 | Removal of Existing Markings | 0.533 | MILE | 12,000.00 | 6,396.00 | 20,000.00 | 10,660.00 | 12,000.00 | 6,396.00 | | 0040 | 736-03-00100 | Jacking or Boring | 1,500 | LNFT | 38.00 | 57,000.00 | 20.00 | 30,000.00 | 35.00 | 52,500.00 | | 0041 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 1,500 | LNFT | 10.00 | 15,000.00 | 20.00 | 30,000.00 | 8.00 | 12,000.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 0.55 | ACRE | 12,500.00 | 6,875.00 | 6,000.00 | 3,300.00 | 7,000.00 | 3,850.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 85,000.00 | 85,000.00 | 150,000.00 | 150,000.00 | | 0044 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 21,004 | INLF | 1.00 | 21,004.00 | 2.00 | 42,008.00 | 3.00 | 63,012.00 | | 0045 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers (36 FIBERS) | 1,500 | LNFT | 10.00 | 15,000.00 | 30.00 | 45,000.00 | 8.00 | 12,000.00 | | 0046 | NS-ITS-04040 | Fiber Optic Cable, SM, Furnish & Install (144 FIBERS) | 1,500 | LNFT | 12.00 | 18,000.00 | 32.00 | 48,000.00 | 10.00 | 15,000.00 | | 0047 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 362 | EACH | 58.00 | 20,996.00 | 90.00 | 32,580.00 | 45.00 | 16,290.00 | | 0048 | NS-ITS-04360 | Fiber Optic Connection Splice Tray, Furnish & Install | 30 | EACH | 125.00 | 3,750.00 | 600.00 | 18,000.00 | 100.00 | 3,000.00 | | 0049 | NS-ITS-05025 | Splice Closure, Outdoor, Furnish & Install | 2 | EACH | 2,500.00 | 5,000.00 | 5,000.00 | 10,000.00 | 2,000.00 | 4,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,576,742.20 | | 1,603,011.35 | | 1,911,921.50 |
|