Proposal:H.015246.6
Parish:Ouachita
Routes:LA 840-6
Description:LA 840-6: HUDSON LN - BAYOU DESIARD
Type Construction:FULL DEPTH CONCRETE PATCHING, VIDEO DETECTION CAMERAS, AND RELATED WORK.
Estimated Construction Cost:$3,075,549.50
| Rank | License | Bidder | Construction Bid |
| 1 | 30774 | Progressive Construction Co., LLC | $2,394,715.28 |
| 2 | 21982 | Forby Contracting, Inc. | $2,563,421.80 |
| 3 | 55505 | MERRICK, LLC | $3,572,316.60 |
| 4 | 25609 | DIAMOND SURFACE, INC. | $5,165,129.46 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Progressive Construction Co., LLC | - 2 - Forby Contracting, Inc. | - 3 - MERRICK, LLC | - 4 - DIAMOND SURFACE, INC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 1,118.5 | LNFT | 30.00 | 33,555.00 | 10.00 | 11,185.00 | 9.00 | 10,066.50 | 17.50 | 19,573.75 | | 0002 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 51,592 | LNFT | 2.50 | 128,980.00 | 4.00 | 206,368.00 | 3.55 | 183,151.60 | 5.00 | 257,960.00 | | 0003 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 42,792 | LNFT | 2.50 | 106,980.00 | 3.00 | 128,376.00 | 3.80 | 162,609.60 | 5.00 | 213,960.00 | | 0004 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 1,682.9 | SQYD | 255.00 | 429,139.50 | 280.00 | 471,212.00 | 355.00 | 597,429.50 | 681.50 | 1,146,896.35 | | 0005 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 1,174.6 | SQYD | 225.00 | 264,285.00 | 240.00 | 281,904.00 | 305.00 | 358,253.00 | 554.25 | 651,022.05 | | 0006 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 1,429.5 | SQYD | 210.00 | 300,195.00 | 220.00 | 314,490.00 | 255.00 | 364,522.50 | 424.50 | 606,822.75 | | 0007 | 602-16-00101 | High Early Strength (HES) Concrete Pavement Full Depth Patching | 1,093.3 | SQYD | 280.00 | 306,124.00 | 380.00 | 415,454.00 | 405.00 | 442,786.50 | 747.25 | 816,968.43 | | 0008 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 4 | EACH | 5,100.00 | 20,400.00 | 5,000.00 | 20,000.00 | 5,000.00 | 20,000.00 | 9,787.50 | 39,150.00 | | 0009 | 702-04-00100 | Adjusting Manholes | 11 | EACH | 1,600.00 | 17,600.00 | 750.00 | 8,250.00 | 4,000.00 | 44,000.00 | 1,562.50 | 17,187.50 | | 0010 | 706-04-00110 | Curb Ramps (TYPE 7) | 186.2 | SQYD | 300.00 | 55,860.00 | 300.00 | 55,860.00 | 250.00 | 46,550.00 | 412.50 | 76,807.50 | | 0011 | 706-04-00110 | Curb Ramps (TYPE 8) | 124 | SQYD | 300.00 | 37,200.00 | 300.00 | 37,200.00 | 250.00 | 31,000.00 | 412.50 | 51,150.00 | | 0012 | 707-01-00100 | Concrete Curb | 1,118.5 | LNFT | 35.00 | 39,147.50 | 25.00 | 27,962.50 | 105.00 | 117,442.50 | 93.75 | 104,859.38 | | 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 350,000.00 | 350,000.00 | 225,000.00 | 225,000.00 | | 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.654 | MILE | 1,300.00 | 3,450.20 | 500.00 | 1,327.00 | 900.00 | 2,388.60 | 1,000.00 | 2,654.00 | | 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 11.856 | MILE | 525.00 | 6,224.40 | 500.00 | 5,928.00 | 900.00 | 10,670.40 | 1,500.00 | 17,784.00 | | 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 10.492 | MILE | 840.00 | 8,813.28 | 800.00 | 8,393.60 | 1,442.28 | 15,132.40 | 3,250.00 | 34,099.00 | | 0017 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 56 | EACH | 25.00 | 1,400.00 | 25.00 | 1,400.00 | 63.00 | 3,528.00 | 50.00 | 2,800.00 | | 0018 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 1 | EACH | 25.00 | 25.00 | 25.00 | 25.00 | 63.00 | 63.00 | 50.00 | 50.00 | | 0019 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 13 | EACH | 25.00 | 325.00 | 25.00 | 325.00 | 63.00 | 819.00 | 62.50 | 812.50 | | 0020 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 8 | EACH | 75.00 | 600.00 | 75.00 | 600.00 | 125.00 | 1,000.00 | 500.00 | 4,000.00 | | 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 240,000.00 | 240,000.00 | 163,845.00 | 163,845.00 | 350,000.00 | 350,000.00 | 531,925.00 | 531,925.00 | | 0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,602 | EACH | 4.20 | 10,928.40 | 4.00 | 10,408.00 | 9.00 | 23,418.00 | 7.50 | 19,515.00 | | 0023 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 152 | LNFT | 4.20 | 638.40 | 4.00 | 608.00 | 4.00 | 608.00 | 13.75 | 2,090.00 | | 0024 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 90 | LNFT | 10.50 | 945.00 | 10.00 | 900.00 | 9.00 | 810.00 | 15.00 | 1,350.00 | | 0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 1,271 | LNFT | 12.50 | 15,887.50 | 12.00 | 15,252.00 | 15.00 | 19,065.00 | 18.75 | 23,831.25 | | 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 10.492 | MILE | 4,300.00 | 45,115.60 | 4,100.00 | 43,017.20 | 7,000.00 | 73,444.00 | 4,875.00 | 51,148.50 | | 0027 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.12 | MILE | 945.00 | 2,948.40 | 900.00 | 2,808.00 | 2,500.00 | 7,800.00 | 1,750.00 | 5,460.00 | | 0028 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 8.736 | MILE | 10,500.00 | 91,728.00 | 10,000.00 | 87,360.00 | 14,000.00 | 122,304.00 | 7,750.00 | 67,704.00 | | 0029 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 56 | EACH | 315.00 | 17,640.00 | 300.00 | 16,800.00 | 345.00 | 19,320.00 | 437.50 | 24,500.00 | | 0030 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 315.00 | 315.00 | 300.00 | 300.00 | 345.00 | 345.00 | 437.50 | 437.50 | | 0031 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 13 | EACH | 420.00 | 5,460.00 | 400.00 | 5,200.00 | 375.00 | 4,875.00 | 500.00 | 6,500.00 | | 0032 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 8 | EACH | 880.00 | 7,040.00 | 850.00 | 6,800.00 | 1,125.00 | 9,000.00 | 1,750.00 | 14,000.00 | | 0033 | 732-05-00100 | Removal of Existing Markings | 2.654 | MILE | 8,400.00 | 22,293.60 | 8,000.00 | 21,232.00 | 15,500.00 | 41,137.00 | 5,250.00 | 13,933.50 | | 0034 | 736-01-00100 | Trenching and Backfilling | 280 | LNFT | 10.50 | 2,940.00 | 8.25 | 2,310.00 | 12.50 | 3,500.00 | 10.32 | 2,889.60 | | 0035 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 280 | LNFT | 10.50 | 2,940.00 | 5.00 | 1,400.00 | 13.00 | 3,640.00 | 6.25 | 1,750.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 9,375.00 | 9,375.00 | | 0037 | 741-35-00100 | Adjust Valve or Meter Box | 6 | EACH | 1,400.00 | 8,400.00 | 350.00 | 2,100.00 | 900.00 | 5,400.00 | 1,562.50 | 9,375.00 | | 0038 | TS-736-73617 | Video Detection Cabinet Components | 3 | EACH | 10,500.00 | 31,500.00 | 11,616.00 | 34,848.00 | 12,500.00 | 37,500.00 | 14,520.00 | 43,560.00 | | 0039 | TS-736-73618 | Video Detection Camera | 12 | EACH | 3,650.00 | 43,800.00 | 2,144.00 | 25,728.00 | 4,350.00 | 52,200.00 | 2,680.00 | 32,160.00 | | 0040 | TS-736-73619 | Video Camera Cable | 2,205 | LNFT | 6.30 | 13,891.50 | 5.10 | 11,245.50 | 7.50 | 16,537.50 | 6.38 | 14,067.90 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,394,715.28 | | 2,563,421.80 | | 3,572,316.60 | | 5,165,129.46 |
|