Proposal:H.014737.6
Parish:St. Tammany
Description:SIGNAL UPGRADE: SGT ALFRED DR @ CLEVELAND
Type Construction:TRAFFIC SIGNALIZATION AND RELATED WORK.
Estimated Construction Cost:$397,540.00
| Rank | License | Bidder | Construction Bid |
| 1 | 25666 | PREFERRED ELECTRIC INC. | $384,919.97 |
| 2 | 05473 | Jack B. Harper Electrical LLC | $397,708.38 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - PREFERRED ELECTRIC INC. | - 2 - Jack B. Harper Electrical LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 3 | SQYD | 658.00 | 1,974.00 | 250.00 | 750.00 | | 0002 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 5,037.50 | 5,037.50 | 2,545.60 | 2,545.60 | | 0003 | 706-01-00200 | Concrete Walk (5" Thick) | 4.2 | SQYD | 1,148.00 | 4,821.60 | 291.67 | 1,225.01 | | 0004 | 706-04-00110 | Curb Ramps Type 7 | 26.6 | SQYD | 325.00 | 8,645.00 | 333.33 | 8,866.58 | | 0005 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 21,198.00 | 21,198.00 | 16,666.67 | 16,666.67 | | 0006 | 727-01-00100 | Mobilization | 1 | LUMP | 32,380.00 | 32,380.00 | 66,853.18 | 66,853.18 | | 0007 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 62 | SQFT | 127.23 | 7,888.26 | 109.90 | 6,813.80 | | 0008 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 3 | EACH | 437.50 | 1,312.50 | 967.45 | 2,902.35 | | 0009 | 731-02-00100 | Reflectorized Raised Pavement Markers | 68 | EACH | 22.29 | 1,515.72 | 5.00 | 340.00 | | 0010 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 280 | LNFT | 26.62 | 7,453.60 | 16.67 | 4,667.60 | | 0011 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.379 | MILE | 9,385.00 | 3,556.92 | 6,333.33 | 2,400.33 | | 0012 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.045 | MILE | 18,759.00 | 844.16 | 7,500.00 | 337.50 | | 0013 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 510.00 | 2,040.00 | 375.00 | 1,500.00 | | 0014 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 510.00 | 1,020.00 | 333.33 | 666.66 | | 0015 | 732-05-00100 | Removal of Existing Markings | 0.06 | MILE | 25,009.00 | 1,500.54 | 5,000.00 | 300.00 | | 0016 | 736-01-00100 | Trenching and Backfilling | 120 | LNFT | 12.00 | 1,440.00 | 10.18 | 1,221.60 | | 0017 | 736-03-00100 | Jacking or Boring | 190 | LNFT | 40.44 | 7,683.60 | 44.60 | 8,474.00 | | 0018 | 736-04-00001 | Signal Pole (Pedestal Pole) | 2 | EACH | 1,625.00 | 3,250.00 | 1,546.23 | 3,092.46 | | 0019 | 736-04-10300 | Signal Pole (Single Mast Arm, 30ft) | 1 | EACH | 18,796.00 | 18,796.00 | 23,502.47 | 23,502.47 | | 0020 | 736-04-10350 | Signal Pole (Single Mast Arm, 35ft) | 3 | EACH | 20,225.00 | 60,675.00 | 24,646.47 | 73,939.41 | | 0021 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 8 | EACH | 1,319.00 | 10,552.00 | 1,588.13 | 12,705.04 | | 0022 | 736-06-00100 | Signal Service | 1 | EACH | 4,075.00 | 4,075.00 | 2,439.83 | 2,439.83 | | 0023 | 736-06-00500 | Signal Service Pedestal Disconnect | 1 | EACH | 2,321.79 | 2,321.79 | 3,428.23 | 3,428.23 | | 0024 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 1 | EACH | 9,451.66 | 9,451.66 | 6,413.95 | 6,413.95 | | 0025 | 736-09-00100 | Loop Detector | 780 | LNFT | 36.72 | 28,641.60 | 32.52 | 25,365.60 | | 0026 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 1,466.00 | 1,466.00 | 1,605.57 | 1,605.57 | | 0027 | 736-10-00300 | Underground Junction Box (Type F) | 7 | EACH | 1,798.93 | 12,592.51 | 1,689.00 | 11,823.00 | | 0028 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 3,117.21 | 3,117.21 | 2,521.63 | 2,521.63 | | 0029 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 40 | LNFT | 7.21 | 288.40 | 2.67 | 106.80 | | 0030 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 112 | LNFT | 8.45 | 946.40 | 4.55 | 509.60 | | 0031 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 185 | LNFT | 9.64 | 1,783.40 | 7.93 | 1,467.05 | | 0032 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 510 | LNFT | 2.83 | 1,443.30 | 3.08 | 1,570.80 | | 0033 | 736-12-02014 | Conductor (2c, #14 awg) | 192 | LNFT | 2.69 | 516.48 | 2.83 | 543.36 | | 0034 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 70 | LNFT | 2.67 | 186.90 | 11.83 | 828.10 | | 0035 | 736-12-06014 | Conductor (6c, #14 awg) | 586 | LNFT | 3.77 | 2,209.22 | 4.08 | 2,390.88 | | 0036 | 736-12-10014 | Conductor (10c, #14 awg) | 370 | LNFT | 4.60 | 1,702.00 | 5.58 | 2,064.60 | | 0037 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 2 | EACH | 1,813.82 | 3,627.64 | 1,668.32 | 3,336.64 | | 0038 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 4 | EACH | 9,582.15 | 38,328.60 | 7,479.08 | 29,916.32 | | 0039 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 6 | EACH | 941.57 | 5,649.42 | 1,159.12 | 6,954.72 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,572.68 | 8,572.68 | 2,545.60 | 2,545.60 | | 0041 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 270 | INLF | 15.23 | 4,112.10 | 2.50 | 675.00 | | 0042 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 510 | INLF | 15.23 | 7,767.30 | 3.50 | 1,785.00 | | 0043 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 1 | EACH | 30,539.14 | 30,539.14 | 34,420.17 | 34,420.17 | | 0044 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 6 | EACH | 1,261.13 | 7,566.78 | 1,676.12 | 10,056.72 | | 0045 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 1 | EACH | 4,430.04 | 4,430.04 | 5,168.95 | 5,168.95 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 384,919.97 | | 397,708.38 |
|