Proposal:H.014276.6
Parish:St. Martin
Routes:LA 975
Description:LA 975: CREEK BRIDGES
Type Construction:CLEARING AND GRUBBING, GRADING, REMOVAL OF SLAB SPAN BRIDGES, DRAINAGE STRUCTURES, PRECAST CONCRETE PILES, SLAB SPAN BRIDGES, AND RELATED WORK.
Estimated Construction Cost:$1,841,524.50
| Rank | License | Bidder | Construction Bid |
| 1 | 01516 | Elevate Heavy Civil Construction, LLC | $1,743,596.60 |
| 2 | 55505 | MERRICK, LLC | $1,897,928.90 |
| 3 | 67770 | Reliant Industrial Solutions L.L.C. | $1,898,650.93 |
| 4 | 52306 | SIEMA CONSTRUCTION, LLC | $2,022,509.00 |
| 5 | 56994 | Matt L. Guinn Construction, LLC | $2,078,540.65 |
| 6 | 54206 | Southern Constructors, LLC | $2,160,882.00 |
| 7 | 00009 | Coastal Contractors, LLC | $2,239,204.03 |
| 8 | 00044 | Guinn Construction, LLC | $2,411,392.75 |
| 9 | 12487 | Diamond B Construction Co., L.L.C. | $3,058,132.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elevate Heavy Civil Construction, LLC | - 2 - MERRICK, LLC | - 3 - Reliant Industrial Solutions L.L.C. | - 4 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 55,000.00 | 55,000.00 | 25,000.00 | 25,000.00 | 70,000.00 | 70,000.00 | 152,500.00 | 152,500.00 | | 0002 | 202-02-04501 | Removal of Bridge STR. NO. 035008503007601, 38' X 20' CONC SLAB SPAN BRIDGE | 760 | LUMP | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | 115,000.00 | 115,000.00 | | 0003 | 202-02-04501 | Removal of Bridge STR. NO. 035008503008241, 57' X 20' CONC SLAB SPAN BRIDGE | 1,140 | LUMP | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | 31,500.00 | 31,500.00 | 115,000.00 | 115,000.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 18" RCP | 24 | LNFT | 57.00 | 1,368.00 | 30.00 | 720.00 | 46.50 | 1,116.00 | 30.00 | 720.00 | | 0005 | 203-01-00100 | General Excavation | 386 | CUYD | 28.00 | 10,808.00 | 30.00 | 11,580.00 | 60.00 | 23,160.00 | 25.00 | 9,650.00 | | 0006 | 203-02-00100 | Drainage Excavation | 203 | CUYD | 52.00 | 10,556.00 | 50.00 | 10,150.00 | 75.00 | 15,225.00 | 42.00 | 8,526.00 | | 0007 | 203-03-00100 | Embankment | 383 | CUYD | 94.00 | 36,002.00 | 60.00 | 22,980.00 | 80.00 | 30,640.00 | 46.00 | 17,618.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 35 | EACH | 50.00 | 1,750.00 | 25.00 | 875.00 | 34.00 | 1,190.00 | 30.00 | 1,050.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 150.00 | 750.00 | 250.00 | 1,250.00 | 210.00 | 1,050.00 | 185.00 | 925.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,363 | LNFT | 2.00 | 2,726.00 | 3.00 | 4,089.00 | 2.70 | 3,680.10 | 2.20 | 2,998.60 | | 0011 | 401-01-00100 | Aggregate Surface Course (Net Section) | 196.1 | CUYD | 155.00 | 30,395.50 | 180.00 | 35,298.00 | 157.50 | 30,885.75 | 190.00 | 37,259.00 | | 0012 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 50 | LNFT | 95.00 | 4,750.00 | 150.00 | 7,500.00 | 146.00 | 7,300.00 | 80.00 | 4,000.00 | | 0013 | 701-05-02044 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW/CMP) | 60 | LNFT | 79.00 | 4,740.00 | 180.00 | 10,800.00 | 134.00 | 8,040.00 | 70.00 | 4,200.00 | | 0014 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 27.00 | 845.10 | 34.00 | 1,064.20 | 35.25 | 1,103.33 | 33.00 | 1,032.90 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 56.3 | LNFT | 27.00 | 1,520.10 | 34.00 | 1,914.20 | 35.00 | 1,970.50 | 33.00 | 1,857.90 | | 0016 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 190.00 | 1,197.00 | 245.00 | 1,543.50 | 117.00 | 737.10 | 110.00 | 693.00 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 206.3 | LNFT | 119.00 | 24,549.70 | 150.00 | 30,945.00 | 117.00 | 24,137.10 | 110.00 | 22,693.00 | | 0018 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 7 | EACH | 3,500.00 | 24,500.00 | 4,000.00 | 28,000.00 | 4,000.00 | 28,000.00 | 4,000.00 | 28,000.00 | | 0019 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 518 | SQYD | 88.00 | 45,584.00 | 120.00 | 62,160.00 | 128.00 | 66,304.00 | 120.00 | 62,160.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 518 | SQYD | 3.00 | 1,554.00 | 5.00 | 2,590.00 | 4.75 | 2,460.50 | 2.00 | 1,036.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 33,000.00 | 33,000.00 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | | 0022 | 718-01-00100 | Fertilizer | 1,047 | LB | 2.00 | 2,094.00 | 3.00 | 3,141.00 | 1.15 | 1,204.05 | 1.00 | 1,047.00 | | 0023 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 17,000.00 | 17,000.00 | 10,000.00 | 10,000.00 | 15,500.00 | 15,500.00 | 20,000.00 | 20,000.00 | | 0024 | 726-01-00100 | Bedding Material | 9.6 | CUYD | 264.00 | 2,534.40 | 200.00 | 1,920.00 | 125.00 | 1,200.00 | 190.00 | 1,824.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 174,359.00 | 174,359.00 | 185,000.00 | 185,000.00 | 185,000.00 | 185,000.00 | 200,000.00 | 200,000.00 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 85.00 | 680.00 | 115.00 | 920.00 | 130.00 | 1,040.00 | 150.00 | 1,200.00 | | 0027 | 738-01-00100 | Mulch Sodding | 844 | CUYD | 5.00 | 4,220.00 | 12.00 | 10,128.00 | 11.00 | 9,284.00 | 91.00 | 76,804.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,300.00 | 7,300.00 | 25,000.00 | 25,000.00 | 26,000.00 | 26,000.00 | 7,650.00 | 7,650.00 | | 0029 | 804-01-00300 | Precast Concrete Piles (16") | 2,980 | LNFT | 140.00 | 417,200.00 | 160.00 | 476,800.00 | 128.00 | 381,440.00 | 106.00 | 315,880.00 | | 0030 | 805-01-00100 | Class A1 Concrete (Slab Span) | 155.08 | CUYD | 2,000.00 | 310,160.00 | 2,400.00 | 372,192.00 | 2,700.00 | 418,716.00 | 2,350.00 | 364,438.00 | | 0031 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 47.03 | CUYD | 3,500.00 | 164,605.00 | 4,000.00 | 188,120.00 | 3,700.00 | 174,011.00 | 3,750.00 | 176,362.50 | | 0032 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,645 | SQFT | 2.00 | 3,290.00 | 3.00 | 4,935.00 | 3.75 | 6,168.75 | 2.00 | 3,290.00 | | 0033 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,645 | SQFT | 3.00 | 4,935.00 | 4.00 | 6,580.00 | 4.00 | 6,580.00 | 3.50 | 5,757.50 | | 0034 | 806-01-00100 | Deformed Reinforcing Steel | 43,897 | LB | 1.40 | 61,455.80 | 2.00 | 87,794.00 | 1.75 | 76,819.75 | 1.80 | 79,014.60 | | 0035 | 810-01-00110 | Concrete Bridge Railing (32 inch Height) | 280 | LNFT | 253.00 | 70,840.00 | 225.00 | 63,000.00 | 250.00 | 70,000.00 | 185.00 | 51,800.00 | | 0036 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 960 | SQFT | 112.00 | 107,520.00 | 80.00 | 76,800.00 | 100.00 | 96,000.00 | 100.00 | 96,000.00 | | 0037 | 815-03-00300 | Joint Seal (Poured) | 238 | LNFT | 16.00 | 3,808.00 | 30.00 | 7,140.00 | 26.00 | 6,188.00 | 19.00 | 4,522.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,743,596.60 | | 1,897,928.90 | | 1,898,650.93 | | 2,022,509.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Matt L. Guinn Construction, LLC | - 6 - Southern Constructors, LLC | - 7 - Coastal Contractors, LLC | - 8 - Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 105,000.00 | 105,000.00 | 50,000.00 | 50,000.00 | 85,000.00 | 85,000.00 | 125,000.00 | 125,000.00 | | 0002 | 202-02-04501 | Removal of Bridge STR. NO. 035008503007601, 38' X 20' CONC SLAB SPAN BRIDGE | 760 | LUMP | 35,000.00 | 35,000.00 | 55,000.00 | 55,000.00 | 76,000.00 | 76,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-04501 | Removal of Bridge STR. NO. 035008503008241, 57' X 20' CONC SLAB SPAN BRIDGE | 1,140 | LUMP | 40,000.00 | 40,000.00 | 55,000.00 | 55,000.00 | 90,000.00 | 90,000.00 | 30,000.00 | 30,000.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 18" RCP | 24 | LNFT | 100.00 | 2,400.00 | 100.00 | 2,400.00 | 68.00 | 1,632.00 | 50.00 | 1,200.00 | | 0005 | 203-01-00100 | General Excavation | 386 | CUYD | 28.00 | 10,808.00 | 40.00 | 15,440.00 | 54.00 | 20,844.00 | 40.00 | 15,440.00 | | 0006 | 203-02-00100 | Drainage Excavation | 203 | CUYD | 28.00 | 5,684.00 | 40.00 | 8,120.00 | 71.00 | 14,413.00 | 45.00 | 9,135.00 | | 0007 | 203-03-00100 | Embankment | 383 | CUYD | 55.00 | 21,065.00 | 80.00 | 30,640.00 | 114.00 | 43,662.00 | 100.00 | 38,300.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 35 | EACH | 25.00 | 875.00 | 100.00 | 3,500.00 | 37.00 | 1,295.00 | 50.00 | 1,750.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 250.00 | 1,250.00 | 750.00 | 3,750.00 | 229.00 | 1,145.00 | 500.00 | 2,500.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,363 | LNFT | 3.50 | 4,770.50 | 4.00 | 5,452.00 | 3.00 | 4,089.00 | 4.00 | 5,452.00 | | 0011 | 401-01-00100 | Aggregate Surface Course (Net Section) | 196.1 | CUYD | 210.00 | 41,181.00 | 200.00 | 39,220.00 | 250.00 | 49,025.00 | 250.00 | 49,025.00 | | 0012 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 50 | LNFT | 120.00 | 6,000.00 | 200.00 | 10,000.00 | 232.00 | 11,600.00 | 250.00 | 12,500.00 | | 0013 | 701-05-02044 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW/CMP) | 60 | LNFT | 120.00 | 7,200.00 | 200.00 | 12,000.00 | 210.00 | 12,600.00 | 250.00 | 15,000.00 | | 0014 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 48.00 | 1,502.40 | 45.00 | 1,408.50 | 35.00 | 1,095.50 | 50.00 | 1,565.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 56.3 | LNFT | 48.00 | 2,702.40 | 45.00 | 2,533.50 | 35.00 | 1,970.50 | 50.00 | 2,815.00 | | 0016 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 200.00 | 1,260.00 | 150.00 | 945.00 | 110.00 | 693.00 | 150.00 | 945.00 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 206.3 | LNFT | 148.00 | 30,532.40 | 150.00 | 30,945.00 | 110.00 | 22,693.00 | 150.00 | 30,945.00 | | 0018 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 7 | EACH | 4,250.00 | 29,750.00 | 5,000.00 | 35,000.00 | 3,750.00 | 26,250.00 | 4,500.00 | 31,500.00 | | 0019 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 518 | SQYD | 128.00 | 66,304.00 | 127.00 | 65,786.00 | 140.00 | 72,520.00 | 150.00 | 77,700.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 518 | SQYD | 5.00 | 2,590.00 | 15.00 | 7,770.00 | 7.00 | 3,626.00 | 5.00 | 2,590.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 48,000.00 | 48,000.00 | 80,000.00 | 80,000.00 | 60,000.00 | 60,000.00 | 40,000.00 | 40,000.00 | | 0022 | 718-01-00100 | Fertilizer | 1,047 | LB | 1.65 | 1,727.55 | 6.00 | 6,282.00 | 1.24 | 1,298.28 | 1.50 | 1,570.50 | | 0023 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | | 0024 | 726-01-00100 | Bedding Material | 9.6 | CUYD | 210.00 | 2,016.00 | 250.00 | 2,400.00 | 275.00 | 2,640.00 | 250.00 | 2,400.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 215,000.00 | 215,000.00 | 220,000.00 | 220,000.00 | 300,000.00 | 300,000.00 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 300.00 | 2,400.00 | 600.00 | 4,800.00 | 115.00 | 920.00 | 200.00 | 1,600.00 | | 0027 | 738-01-00100 | Mulch Sodding | 844 | CUYD | 80.00 | 67,520.00 | 7.00 | 5,908.00 | 8.50 | 7,174.00 | 0.00 | 0.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | 35,000.00 | 35,000.00 | | 0029 | 804-01-00300 | Precast Concrete Piles (16") | 2,980 | LNFT | 150.00 | 447,000.00 | 157.00 | 467,860.00 | 150.00 | 447,000.00 | 195.00 | 581,100.00 | | 0030 | 805-01-00100 | Class A1 Concrete (Slab Span) | 155.08 | CUYD | 2,450.00 | 379,946.00 | 2,100.00 | 325,668.00 | 2,800.00 | 434,224.00 | 2,850.00 | 441,978.00 | | 0031 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 47.03 | CUYD | 3,950.00 | 185,768.50 | 3,500.00 | 164,605.00 | 3,500.00 | 164,605.00 | 3,750.00 | 176,362.50 | | 0032 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,645 | SQFT | 2.00 | 3,290.00 | 4.00 | 6,580.00 | 2.50 | 4,112.50 | 3.00 | 4,935.00 | | 0033 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,645 | SQFT | 2.00 | 3,290.00 | 3.00 | 4,935.00 | 3.50 | 5,757.50 | 3.00 | 4,935.00 | | 0034 | 806-01-00100 | Deformed Reinforcing Steel | 43,897 | LB | 1.70 | 74,624.90 | 2.00 | 87,794.00 | 1.75 | 76,819.75 | 1.75 | 76,819.75 | | 0035 | 810-01-00110 | Concrete Bridge Railing (32 inch Height) | 280 | LNFT | 300.00 | 84,000.00 | 250.00 | 70,000.00 | 275.00 | 77,000.00 | 350.00 | 98,000.00 | | 0036 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 960 | SQFT | 108.00 | 103,680.00 | 200.00 | 192,000.00 | 110.00 | 105,600.00 | 125.00 | 120,000.00 | | 0037 | 815-03-00300 | Joint Seal (Poured) | 238 | LNFT | 18.50 | 4,403.00 | 30.00 | 7,140.00 | 50.00 | 11,900.00 | 35.00 | 8,330.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,078,540.65 | | 2,160,882.00 | | 2,239,204.03 | | 2,411,392.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 350,000.00 | 350,000.00 | | 0002 | 202-02-04501 | Removal of Bridge STR. NO. 035008503007601, 38' X 20' CONC SLAB SPAN BRIDGE | 760 | LUMP | 90,000.00 | 90,000.00 | | 0003 | 202-02-04501 | Removal of Bridge STR. NO. 035008503008241, 57' X 20' CONC SLAB SPAN BRIDGE | 1,140 | LUMP | 90,000.00 | 90,000.00 | | 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 18" RCP | 24 | LNFT | 60.00 | 1,440.00 | | 0005 | 203-01-00100 | General Excavation | 386 | CUYD | 86.00 | 33,196.00 | | 0006 | 203-02-00100 | Drainage Excavation | 203 | CUYD | 200.00 | 40,600.00 | | 0007 | 203-03-00100 | Embankment | 383 | CUYD | 95.00 | 36,385.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 35 | EACH | 50.00 | 1,750.00 | | 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 150.00 | 750.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 1,363 | LNFT | 2.00 | 2,726.00 | | 0011 | 401-01-00100 | Aggregate Surface Course (Net Section) | 196.1 | CUYD | 230.00 | 45,103.00 | | 0012 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 50 | LNFT | 195.00 | 9,750.00 | | 0013 | 701-05-02044 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW/CMP) | 60 | LNFT | 175.00 | 10,500.00 | | 0014 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 40.00 | 1,252.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 56.3 | LNFT | 34.00 | 1,914.20 | | 0016 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 140.00 | 882.00 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 206.3 | LNFT | 135.00 | 27,850.50 | | 0018 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 7 | EACH | 4,100.00 | 28,700.00 | | 0019 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 518 | SQYD | 120.00 | 62,160.00 | | 0020 | 711-04-00100 | Geotextile Fabric | 518 | SQYD | 1.00 | 518.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 277,000.00 | 277,000.00 | | 0022 | 718-01-00100 | Fertilizer | 1,047 | LB | 2.00 | 2,094.00 | | 0023 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 75,000.00 | 75,000.00 | | 0024 | 726-01-00100 | Bedding Material | 9.6 | CUYD | 310.00 | 2,976.00 | | 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | | 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 135.00 | 1,080.00 | | 0027 | 738-01-00100 | Mulch Sodding | 844 | CUYD | 85.00 | 71,740.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 95,000.00 | 95,000.00 | | 0029 | 804-01-00300 | Precast Concrete Piles (16") | 2,980 | LNFT | 175.00 | 521,500.00 | | 0030 | 805-01-00100 | Class A1 Concrete (Slab Span) | 155.08 | CUYD | 2,400.00 | 372,192.00 | | 0031 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 47.03 | CUYD | 4,000.00 | 188,120.00 | | 0032 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,645 | SQFT | 5.00 | 8,225.00 | | 0033 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,645 | SQFT | 5.00 | 8,225.00 | | 0034 | 806-01-00100 | Deformed Reinforcing Steel | 43,897 | LB | 2.00 | 87,794.00 | | 0035 | 810-01-00110 | Concrete Bridge Railing (32 inch Height) | 280 | LNFT | 255.00 | 71,400.00 | | 0036 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 960 | SQFT | 135.00 | 129,600.00 | | 0037 | 815-03-00300 | Joint Seal (Poured) | 238 | LNFT | 45.00 | 10,710.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,058,132.70 |
|